Industry: Commercial

Design High-Performance Commercial Solar Systems With Confidence

SurgePV empowers you to tackle large-scale commercial projects with precision and ease. From complex rooftops to expansive ground mounts, generate optimized designs, detailed financials, and professional proposals—all in one seamless platform built to scale with your business.

Deliver fast and precise designs
Maximize energy output
Close deals quicker

Model Complex Structures and Maximize System Capacity

Easily handle commercial rooftops, carports, and ground mounts with AI-powered modeling tools. SurgePV ensures accurate layouts, optimal module placement, and smart space utilization—helping you design larger systems while avoiding costly errors.

Analyze Shading, Irradiance, and Energy Yield With Precision

Run comprehensive shade studies, irradiance maps, and sun path simulations to assess system performance. SurgePV enables precise energy yield forecasts, empowering clients with data-driven insights to make confident investment decisions.

Deliver Financial Models and Proposals That Close Projects

Build investor-grade proposals backed by customizable financial models, ROI forecasts, and payback analysis. SurgePV simplifies complex numbers into clear visuals—accelerating stakeholder approvals and securing commercial deals faster.

How SurgePV Works to
Streamline Projects

From capturing and managing leads to designing layouts, creating proposals, and securing approvals, wesimplify the entire process to save you time and maximize efficiency.
Site
Assessment
Roof
Modeling

Panel
Placement

Energy
Analysis

Proposal
Creation


Don’t Take Our Word For it. See What Our Clients Say.

See how solar businesses are achieving more with the tools and support they trust from SurgePV.
Mark Reynolds
Senior Solar Engineer
"SurgePV completely changed the way we design solar projects. The AI-powered roof modeling is so precise, it’s like having an expert engineer working alongside us 24/7!"
Lisa Carter
Solar Project Designer
"I used to spend hours manually adjusting layouts, but with SurgePV, I can generate optimized designs in minutes. It’s a total game-changer for efficiency and accuracy!"
David Mitchell
Lead Solar Consultant
"No more guesswork! SurgePV’s shading tools help us maximize system performance by eliminating surprise inefficiencies. Now we know exactly where every panel should go."
Ryan Chandler
Solar Financial Analyst
"I love how SurgePV translates energy production into real financial insights. It makes explaining ROI to customers easier than ever!"
Jessica Lopez
PV System Engineer
"Before using SurgePV, shadow analysis was a tedious process. Now, I can pinpoint shading issues instantly and optimize designs with total confidence!"
Michelle Tran
Solar Sales Consultant
"This platform takes the guesswork out of solar economics. I can confidently show clients exactly how much they’ll save before they even sign the contract!"

Win your next project in just minutes.

Connect with a specialist for personalized insights and support tailored to your solar business needs.
Join Waitlist
UX designer