Solar Design & Proposal Software

Design and Propose Solar Projects with Numbers You Can Stand Behind.

Model roofs, plan electrical layouts, review shading and production estimates, and prepare customer proposals in one workflow. Keep project inputs and assumptions visible for design review.

Book a guided demo

Proof you can check in the demo. These are the published workflow steps. Each output still depends on your inputs and on review.

Published SurgePV workflow to inspect in a guided demo
StepWhat to inspect
Site model3D roof model from available imagery. Check planes and dimensions before engineering use.
Array and shadeModule layout and the shading assumptions tied to that layout.
Energy and moneyEnergy-yield and financial scenarios built from the inputs you supply.
HandoffElectrical workflow support, a bill of materials, and a customer proposal. Confirm the exports in your edition.
0:00 / 0:00

From Idea To Install - Every Step In One Platform.

Site assessment, roof modeling, mounting, panel layout, electrical design, energy simulation, storage, financial analysis, and a client proposal can sit in one project. Confirm which of those outputs your edition includes.

AI-assisted roof modeling

Start a 3D roof model from available imagery, including dormers and pitched roofs. Review planes and dimensions before you use the model.

Explore solar design software

Financial Modeling With Scenario-Based Yield Forecasts

Model project cost, LCOE, NPV, IRR, and payback from the inputs you enter. Confirm which yield scenarios the current edition shows before you rely on a probability value.

Explore financial modeling
Engineering

Electrical Design and Documentation,
Generated From the Design

Review stringing, conductor sizing, and single-line documentation from the same project when those outputs are in your edition. Confirm PDF, DXF, and bill-of-materials exports in the demo. Drawings still need the responsible engineer's review.

Keeping the drawing, cable schedule, and bill of materials in one project reduces a separate reconciliation step. It does not replace CAD review or authority approval.

Clara AI is a design assistant inside the project.

Ask which inputs Clara uses, whether it explains or changes the design, and how you inspect the result. It does not guarantee an approved design.

Explore Clara AIClara AI assistant analyzing solar project data

Review Clara's suggestion before you change the design.

Bring a representative roof or layout question to the demo. Check the starting inputs, Clara's response, and the project state after you edit it.

Book a guided demoClara AI copilot guiding solar sales workflow

AI-Powered Solar Design for Complex Roofs, Dormers & Commercial Sites

Move from roof geometry and array layout to a reviewed design. Inspect the site inputs and output before using it in engineering or permitting.

Smart Designing

AI-assisted 3D design, module placement, and shading analysis in one workflow. SurgePV supports complex-roof work and keeps layout and energy-model assumptions connected for review.

SurgePV solar panel layout design tool with 3D roof modeling and automated module placement
01

AI Roof Modeling

Create and edit 3D roof models from available imagery and project inputs, including dormers, pitched roofs, and multi-plane geometry. Verify dimensions before engineering use.

02

Advanced Mapping

Start from the site imagery available for the address. Coverage and resolution vary. Confirm panel positions against site measurements.

03

Shading Analysis

Solar shadow analysis shows where the model expects shade to reduce output. It does not replace a site visit.

See all solar design software features

Energy Optimization

Irradiance mapping, loss analysis, and performance modeling in one workflow. Review expected production in the financial modeling workflow before a client signs. Actual results and external acceptance stay project-specific.

SurgePV energy and financial modeling screen
01

Irradiance Mapping

Use the irradiance data in the project to estimate production. The estimate depends on the weather source and the losses you accept.

02

Module Placement

Place modules automatically or by hand on flat, pitched, or shed roofs, then review the layout. The tool does not select one optimal design.

03

Loss Analysis

Review modeled losses such as shading, wiring, and inverter clipping. The list is not every real-world loss.

See generation & financial tools

Boost Sales

Branded solar proposal templates, including language options you can inspect. The savings shown follow from the inputs. They are not a guaranteed customer result.

Solar proposal software with multilingual support
01

Bilingual Proposal Options

Check which template languages your edition includes, then have a reviewer check the customer-facing text.

02

Consumption Profiling

Compare pre- and post-solar consumption from the usage data you enter. Savings follow those assumptions.

03

Flexible Financing

Show cash, loan, lease, or PPA terms when you enter them. Confirm which financing inputs your edition includes.

See proposal features

Streamline Your Tools and Save Costs.

One project can hold roof modeling, array layout, shading, energy and financial modeling, electrical workflow support, a bill of materials, and the proposal. See current pricing. This does not claim SurgePV replaces a fixed set of other products.

Built for Every Solar Workflow

Whether you're designing projects, closing deals, or managing a solar network - SurgePV is built for your workflow.

For Solar Installers

Review roof geometry, obstructions, and panel placement in a single project workflow. Confirm site details and obtain the professional review required for your project.

  • Imagery-based 3D roof modeling you can edit before engineering use
  • Shading and production estimates from the project assumptions
  • Bill of materials from the design. Confirm single-line exports in the demo.
Solar design tools for installers

For Sales Professionals

Turn a reviewed design into a proposal the customer can read. The savings follow the stated tariff, usage, and production assumptions.

  • Branded proposals from the reviewed project inputs
  • Savings, tariffs, and payback from the assumptions you enter
  • Check the proposal languages available in your template
Solar proposal tools for sales teams

For OEMs & Channel Managers

Review how dealers share designs and proposals. Confirm branding, permissions, and any integration in writing before a rollout.

  • Ask which branding options and integrations your edition includes
  • Project visibility from design through the handoff you define
  • Site-information checks to support design review and identify missing inputs
Channel management platform for OEMs

Built For Solar Teams
Who Move Fast

Move from layout and yield to a proposal the customer can review in one project. SurgePV does not promise a signed approval.

Evidence-first evaluation

Evaluate SurgePV with your own project

SurgePV does not publish customer names, quotations, or performance outcomes without retained consent and substantiation. Use a representative project during a guided demonstration and validate workflow, outputs, assumptions, and fit against your own requirements.

What is SurgePV?

SurgePV is solar design software for installers and EPCs. It supports roof modeling, shading analysis, financial projections, and client proposals in one cloud project. Confirm the exports in a guided demo.

Is SurgePV right for my solar business?

SurgePV is built for solar installers, EPCs, designers, and sales teams working across residential and commercial project workflows. Confirm system-size, structure, data, and output requirements with a representative project during the demo.

What is the best solar design software for EPCs?

An EPC should evaluate solar design software against its own roof, electrical, yield, financial, handoff, and approval requirements. SurgePV connects those workflows, but does not promise a universal time saving or third-party acceptance.

Frequently asked questions

What workflows does SurgePV support?

SurgePV supports roof modeling, array layout, shading and energy-yield modeling, financial analysis, electrical workflow outputs, bills of materials, and proposals. Confirm the exact feature, export, market, and plan during a demonstration.

How fast is a SurgePV design?

Completion time depends on imagery, roof and electrical complexity, data quality, revisions, and required review. SurgePV does not promise a universal design-time reduction; use a representative project in the demo to measure your workflow.

Are energy results guaranteed or automatically bankable?

No. Results depend on input data and assumptions. Lender, insurer, utility, authority, and engineer acceptance is project-specific and may require independent validation.

Does SurgePV offer a free trial?

The current public offer is a guided demonstration rather than a promised self-service trial. Confirm access and onboarding terms with sales.

How does SurgePV compare with another platform?

Compare both products using current vendor documentation and the same representative project, required outputs, integrations, support needs, and written quotes. Use the source links and publisher disclosures on comparison pages to assess the evidence behind each claim.

Evaluate SurgePV on your next project.

Share a representative address and required outputs so the team can demonstrate the workflow and document any limitations.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.