Design Faster, Install Smarter With Precision Tools

SurgePV empowers solar installers with precise rooftop modeling, AI-assisted layouts, and real-world shading analysis—enabling faster designs, accurate material planning, and confident project execution.

Accurate Rooftop Modeling for Complex Projects

Tackle every roof type—flat, pitched, or complex—with AI-powered modeling tools that generate faces, folds, and dormers accurately, cutting manual work and design errors.

Seamless Electrical Design and Stringing

Optimize string sizing, integrate microinverters or optimizers, and calculate wire sizes—all while maintaining code compliance. SurgePV helps installers reduce risk and design confidently.

Generate Detailed Reports That Build Client Trust

Turn complex designs into detailed Bills of Materials and interactive proposals. Share irradiance maps, shading reports, and financial insights that help clients make informed decisions quickly.

60%
Faster Project
Design
Design projects in hours, not days—with streamlined workflows that accelerate delivery from concept to construction.
98%
Accuracy in Bill of Materials
Build with confidence using ultra-precise BOMs that eliminate guesswork, reduce rework, and ensure flawless field execution.

What Our Customers Are Saying

From closing more deals to streamlining complex projects, hear how we’ve helped solar professionals like you achieve their goals.

"No more guesswork! SurgePV’s shading tools help us maximize system performance by eliminating surprise inefficiencies. Now we know exactly where every panel should go."
David Mitchell
Lead Solar Consultant
"SurgePV completely changed the way we design solar projects. The AI-powered roof modeling is so precise, it’s like having an expert engineer working alongside us 24/7!"
Mark Reynolds
Senior Solar Engineer
"I used to spend hours manually adjusting layouts, but with SurgePV, I can generate optimized designs in minutes. It’s a total game-changer for efficiency and accuracy!"
Lisa Carter
Solar Project Designer

Win your next project in just minutes.

Connect with a specialist for personalized insights and support tailored to your solar business needs.
Book Demo
UX designer