Close More Solar Deals With Proposals Clients Trust
Create stunning, branded proposals with accurate financial projections and 3D visuals that help homeowners and businesses say yes — faster.
Built for solar sales professionals who want to close on the first visit.
41%
Win rate increase
20 min
Proposal turnaround
$0
Extra tools needed
Losing Deals You Shouldn't Be Losing?
Common sales challenges that SurgePV eliminates.
"Slow proposals lose deals to faster competitors"
By the time you send a proposal, the competitor already closed the deal. Speed is everything in solar sales.
"Generic estimates don't convert"
Generic estimates and spreadsheet-based financials don't inspire confidence. Clients need to see real data they can trust.
"Can't stand out from competitors"
When every proposal looks the same, the lowest price wins. You need visuals and data that differentiate your offering.
"Manual follow-ups kill momentum"
Sending proposals days later means cold leads. The excitement fades and homeowners start second-guessing the investment.
From First Meeting to Signed Contract
SurgePV gives you the tools to close faster — design, present, and sell in a single visit.
Same-Day Proposals
Design a system and generate a complete proposal during the site visit. Clients sign before you leave.
- ✓ Complete proposals in 20 minutes
- ✓ Design + financials + BOM in one flow
- ✓ Share instantly via web link
3D Visuals That Sell
Show clients exactly what their system will look like on their roof. Interactive 3D views build trust and excitement.
- ✓ Photorealistic 3D renderings
- ✓ Interactive client-facing views
- ✓ Before/after roof visualizations
Financial Projections That Convert
Present detailed ROI, savings, and payback data that homeowners understand and trust enough to invest.
- ✓ ROI & savings over 25 years
- ✓ Monthly payment comparisons
- ✓ Incentive & rebate modeling
From Handshake to Signed Contract in One Visit
Four steps to close more solar deals — design, present, and sell from a single platform.
Meet the Client
Arrive at the site, open SurgePV on any device, and pull up satellite imagery of the property in seconds.
Design On-Site
Model the roof with AI, place panels, and run shading analysis — all while the homeowner watches and asks questions.
Present the Proposal
Generate a branded proposal with 3D visuals, financial projections, and a detailed BOM — share it on screen or via link.
Close the Deal
Walk through savings, answer objections with real data, and get the signature — all before you leave the property.
Trusted by Sales Teams Worldwide
"Our proposal win rate jumped from 22% to 41% after switching to SurgePV. Clients see the 3D visuals and financials — they trust us more and sign faster."
Matt Killbus
CEO & Founder, SOLARTabs
"I close deals on the first visit now. Designing the system and presenting a branded proposal during the appointment changed everything."
Mike Rodriguez
Owner, Lone Star Solar
"The financial projections are what sell it. Homeowners see exactly what they save over 25 years — they get excited and sign on the spot."
Rachel Kim
Solar Project Designer, SolarEdge Partners
Frequently Asked Questions
Can I create proposals during a site visit?
Yes. SurgePV is cloud-based and works on any device. Design the system, run financials, and present a branded proposal to the homeowner — all during a single appointment.
How do proposals help me close more deals?
SurgePV proposals include 3D visuals, detailed financials, and professional branding. Clients see real data about their specific home, building trust and urgency to sign.
Can I customize proposals with my company branding?
Yes. Full white-labeling with your logo, colors, and contact info. Every proposal looks like it came from your company — not a software tool.
Do I need design experience to use SurgePV?
No. The AI handles complex design work. Sales professionals can create accurate, professional proposals in minutes without CAD or engineering knowledge.
Design More. Sell More. Build More.
See SurgePV in action — book a free demo and close your next deal faster.