Free Solar Design & Calculation Tools for Installers and Engineers

Accurate, free tools for solar sizing, financial planning, and system design — built to speed up your workflow and boost confidence.

System Design & Optimization

Solar Panel Sizer

Quickly estimate how many panels you need based on energy demand, roof size, and system type.
Access Tool

Solar Panel Design Tool

Visualize and lay out your solar array with orientation, tilt, and spacing for optimal performance.
Access Tool

Roof Pitch Calculator

Measure roof slope angle from basic dimensions to ensure accurate panel mounting and alignment.
Access Tool

Sun Angle Calculator

Track sun position by date and location to optimize tilt and maximize solar exposure year-round.
Access Tool

Electrical Sizing & Safety

Voltage Drop Calculator

Calculate wire gauge and voltage loss across distances to ensure efficient and code-compliant wiring.
Access Tool

Conduit Fill Calculator

Determine the right conduit size based on wire type, count, and code-compliant fill capacity.
Access Tool

Busbar Size Calculator

Find the appropriate busbar size for safe current distribution in residential or commercial systems.
Access Tool

AC Size Calculation

Estimate AC system size from load data to ensure balanced and efficient inverter configurations.
Access Tool

Lightning Risk Assessment Calculator

Evaluate your site's lightning protection need based on IEC/IS standards and environmental factors.
Access Tool

Financial & Energy Storage Planning

Solar Loan Calculator

Estimate monthly payments, interest, and total cost to help clients understand their solar financing options.
Access Tool

Battery Size Calculator

Determine the ideal battery capacity based on load requirements, backup hours, and usage patterns.
Access Tool

HVAC Calculator

Analyze HVAC energy demand to size solar and storage systems more accurately for residential loads.
Access Tool

Win your next project in just minutes.

Connect with a specialist for personalized insights and support tailored to your solar business needs.
Book Demo
UX designer