Knowledge Hubs
Learn Solar.
From Zero to Expert.
Free, structured learning paths covering every aspect of the solar industry. Written by solar professionals with 10+ years of experience.
All Hubs
Solar Design Hub
Master solar system design from scratch — roof modeling, panel layout, shading analysis, energy simulation, and everything in between.
Solar Sales & Proposals Hub
Close more solar deals with better proposals, smarter pricing, and a sales process that builds trust with homeowners and businesses.
Solar Installation Hub
From site survey to commissioning — learn best practices for residential and commercial solar installations, permitting, and inspections.
Energy Storage Hub
Understand battery storage systems — chemistry, sizing, economics, solar+storage design, and how to model storage in proposals.
Solar Business & Operations Hub
Grow your solar company — hiring, project management, financial operations, scaling, and building systems that run without you.
Solar Incentives & Policy Hub
Feed-in tariffs, tax credits, grants, and net metering across 9 European countries. The complete incentives guide.
Solar Technology Guide
From photons to electrons — how solar panels work, panel types, efficiency, inverters, tracking systems, bifacial, perovskite, floating solar, BIPV, and agrivoltaics.
Commercial Solar Guide
System sizing, rooftop vs ground-mount, solar carports, permitting, PPAs, industrial solar, agrivoltaics, SCADA monitoring, and financing — the complete B2B solar guide.
Solar Careers Guide
Every solar career path mapped — installer, designer, engineer, sales rep. Salaries by role and country, certifications, and how to break in.
9
Learning Hubs
89
In-Depth Chapters
300+
Resources & Guides
100%
Free Access
Built for Every Role in Solar
No matter where you sit in the solar value chain, there's a hub for you.
Solar Designers
Roof modeling, layout, shading, simulation — everything to design faster and more accurately.
Solar Design Hub →Sales Teams
Proposals, pricing, objection handling, and closing techniques specific to solar.
Sales Hub →Installers
Site surveys, racking, wiring, permitting, and commissioning best practices.
Installation Hub →Business Owners
Scaling, hiring, project management, and financial operations for solar companies.
Business Hub →Put What You Learn Into Practice
SurgePV combines everything covered in these hubs — design, shading, simulation, proposals, and financials — into one platform built for solar professionals.
No credit card required · Full access · Cancel anytime