Solar Installer Directory

Find Solar Installers Near You

Browse verified solar installation companies across the UK. Compare ratings, read reviews, and get free quotes from trusted local installers.

1394 Companies 147 Cities 218,210 Reviews

Are you a solar installer? List your company free

Browse by Country

Find solar installers in your country.

🇬🇧

United Kingdom

503 companies

🇺🇸

United States

891 companies

🇩🇪

Germany

Coming soon

🇮🇹

Italy

Coming soon

🇫🇷

France

Coming soon

🇪🇸

Spain

Coming soon

Why Use the SurgePV Installer Directory?

Whether you're a homeowner looking for a trusted installer or a solar company looking for more customers, the directory works for both sides.

For Homeowners & Businesses

Compare local installers

Filter by city, specialization, ratings, and certifications to find the right fit.

Read verified reviews

Real reviews from verified customers. See rating distributions and company responses.

Get free quotes

Contact installers directly through their profiles. No fees, no spam.

Check certifications

Every listed company shows their MCS, RECC, TrustMark, and ISO certifications.

For Solar Installers

Get discovered by local buyers

Your company appears in city-level search results when homeowners look for "solar installers near me."

Receive qualified leads

Customers submit project details through your profile. You get their name, property type, and system size.

Build trust with reviews

Collect and display customer reviews. Respond to feedback publicly to show you care.

Free to list

Basic listings cost nothing. Upgrade to Featured for premium placement and a verified badge.

How to Choose a Solar Installer

Not all solar companies are equal. Here are the five things that matter most when choosing who installs your system.

1

Certifications

MCS certification is the UK minimum. RECC and TrustMark add extra consumer protection.

2

Customer Reviews

Look at the rating distribution, not just the average. Read how the company responds to negative reviews.

3

Experience

Years in business and projects completed tell you whether the company has staying power.

4

Warranty

Good installers offer 10+ year panel warranties and 5+ year workmanship guarantees.

5

Local Presence

A company with a local office and local references can respond faster to issues after installation.

How We Score Solar Installers

Every company in the SurgePV directory receives a score based on six weighted factors. Companies cannot pay to improve their score — it is calculated entirely from verified data.

Customer Reviews 25%

Aggregated ratings from Google, Trustpilot, and Checkatrade. Minimum 4.0 to be listed.

Certifications 20%

MCS, RECC, TrustMark, NAPIT, NICEIC, and ISO accreditations verified against official registers.

Experience 20%

Years in business and projects completed, cross-referenced with Companies House records.

Services Range 15%

Breadth of services: solar PV, battery storage, EV charging, maintenance, and energy audits.

Warranty Coverage 10%

Panel, inverter, and workmanship warranty terms compared against industry benchmarks.

Online Presence 10%

Active website, verifiable contact details, and professional social media presence.

For Solar Installers

Design Faster. Sell More.

List your company for free. Get found by local customers. Then try SurgePV — the design platform that cuts project time by 60%.

Frequently Asked Questions

How do I find the best solar installer in my area?

Use the search bar at the top of this page to enter your city or postcode. You'll see a list of local installers ranked by rating and reviews. Check their certifications (MCS is the UK minimum), read customer reviews, and compare service offerings. Then contact the companies that match your needs to get free quotes.

Is it free to list my solar company?

Yes. A basic listing on the SurgePV directory is completely free. Your company name, city, services, certifications, and customer reviews will be visible to anyone searching. You can upgrade to a Featured listing for premium placement, a verified badge, and priority in search results.

How are solar installers ranked in the directory?

Rankings are based on a combination of customer ratings, review volume, years in business, and certification status. Featured companies appear at the top of listings. The ranking algorithm favours companies with consistent positive reviews over time, not just a high average.

What certifications should a UK solar installer have?

At minimum, a UK solar installer should be MCS (Microgeneration Certification Scheme) certified. This is required for your installation to qualify for the Smart Export Guarantee (SEG). RECC membership adds extra consumer protection, and TrustMark provides a government-endorsed quality standard. ISO 9001 certification indicates a company has formal quality management processes.

How much does solar panel installation cost in the UK?

A typical 4kW residential solar panel system in the UK costs between £5,000 and £8,000 including installation, as of 2026. Costs vary by region, roof complexity, panel quality, and whether you add battery storage (which adds £2,500-£5,000). Get quotes from multiple installers in your area to compare pricing for your specific project.