AC

Absolute Comfort

Colorado Springs HVAC and solar installation company providing comprehensive home energy solutions since 1996

Colorado Springs, Colorado
4.6 (55 reviews)
Residential

30+

Years in Business

0

55

Customer Reviews

37 mi

Service Area

11-50

Employees

SurgePV Score

7 / 10
Customer Reviews
92%
Certifications
0%
Experience
100%
Services Range
75%
Warranty Coverage
80%
Online Presence
75%

About Absolute Comfort

Absolute Comfort Inc. is a home energy services company located at 3230 N Cascade Avenue, Unit A, in Colorado Springs, Colorado. Founded in 1996, the company has provided HVAC services to Colorado Springs homeowners for nearly three decades and has expanded to include residential solar panel installation. This combination of heating, cooling, and solar expertise allows Absolute Comfort to design solar systems that account for a home’s total energy profile.

The company offers residential solar panel installation with a variety of payment options, along with their established HVAC services including heating and air conditioning installation, repair, and maintenance. Absolute Comfort’s deep knowledge of Colorado Springs homes and energy consumption patterns, built over decades of HVAC work, informs their solar system designs. The company holds a BBB A+ rating and has been serving the Pikes Peak region continuously since 1996.

Absolute Comfort has earned a 4.6-star rating across review platforms, with many solar customers coming from the company’s existing HVAC client base. Homeowners value the convenience of working with a single contractor that understands their complete home energy needs. For Colorado Springs residents who want a local company with deep roots in the community and a holistic approach to home energy, Absolute Comfort offers a unique combination of HVAC and solar expertise.

Service Area

Absolute Comfort serves the following areas within a 37-mile radius:

Colorado SpringsManitou SpringsMonumentFountainSecurity-WidefieldBlack Forest

Are you Absolute Comfort?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Solar Design
Maintenance

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.6

55 reviews

Howard G.

8 October 2025
Verified Customer

Absolute Comfort installed our solar panels and had previously done our HVAC system. Having one company that understands our whole home energy picture made the solar design process much more effective. Great results.

Donna W.

22 July 2025
Verified Customer

We trusted Absolute Comfort with our solar installation based on the excellent HVAC work they did for us years ago. They did not disappoint. The installation was professional and our electric bills are significantly lower.

Frank C.

5 April 2025
Verified Customer

Solid company that knows Colorado Springs well. Their solar team designed a system that accounts for our home's heating load, which makes sense since they understand HVAC too. Good value for the price.

Frequently Asked Questions About Absolute Comfort

What services does Absolute Comfort offer?

Absolute Comfort offers Solar Installation, Solar Design, Maintenance.

Is Absolute Comfort NABCEP certified?

Absolute Comfort holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does Absolute Comfort serve?

Absolute Comfort serves Colorado Springs, Manitou Springs, Monument, Fountain, Security-Widefield, Black Forest. They are based in Colorado Springs with a service radius of 60 km.

What warranty does Absolute Comfort offer?

Absolute Comfort offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Absolute Comfort's customer reviews?

Absolute Comfort has a 4.6/5 rating based on 55 customer reviews. Customers consistently rate them highly.

How long has Absolute Comfort been in business?

Absolute Comfort was founded in 1996 and has been in business for 30 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Absolute Comfort

Fill in your details and we'll connect you with Absolute Comfort.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote