Solar Installers in the United States
Compare NABCEP-certified solar companies across all 50 states. Read verified reviews and request free quotes from top-rated local installers.
Find Solar Installers by City
Browse 100 cities across the US. Select a city to see local installers, ratings, and reviews.
Browse by State
Find solar installers in your state.
US Solar Energy: Market Overview
280 GW
Installed Capacity
5M+
Solar Installations
$2.75/W
Avg System Cost
8-12 yrs
Avg Payback Period
The US Solar Market in 2026
The United States has over 280 GW of installed solar capacity across more than 5 million residential, commercial, and utility-scale installations. Solar is now the fastest-growing source of new electricity generation in the country, accounting for more than half of all new generating capacity added annually.
Average residential solar costs are $2.50-$3.50 per watt. The 30% federal residential Investment Tax Credit (ITC), which helped drive years of rapid adoption, expired on December 31, 2025 following the passage of the One Big Beautiful Bill. A typical 8kW home system now costs $20,000-$28,000 without federal credits. Payback periods range from 8-12 years depending on state incentives, utility rates, and net metering policies.
Despite the loss of the federal residential credit, solar remains competitive in many markets thanks to falling equipment costs, state-level incentives, and strong net metering policies. States like California, Texas, Florida, and New York lead in residential installations. Commercial projects may still qualify for the ITC under transition rules if construction began before July 2026.
Key Incentives and Policies
Federal Residential ITC — Expired Dec 31, 2025
The 30% federal residential clean energy credit was terminated by the One Big Beautiful Bill. Homeowners can no longer claim this credit for new solar installations in 2026. Commercial projects may still qualify under transition rules if construction began before July 2026.
Net Metering
Most states offer some form of net metering, allowing you to sell excess solar electricity back to the grid. Policies and credit rates vary significantly by state and utility. California moved to NEM 3.0 in 2023.
State and Local Incentives
Many states offer tax credits, rebates, or performance-based incentives for solar. With the federal residential credit gone, state and local incentives are now the primary way to reduce installation costs. Property tax exemptions for solar are available in over 35 states, and sales tax exemptions in over 25 states.
Solar Renewable Energy Certificates (SRECs)
States with Renewable Portfolio Standards (RPS) allow solar system owners to earn SRECs for every MWh of electricity produced. SREC values range from $10 to $400+ depending on the state market.
Solar Installers by Region
The US solar market is active across all regions. Here's how our directory breaks down by area.
Southeast
81 installersMidwest
70 installersSouthwest
68 installersWest Coast
66 installersNortheast
60 installersTexas
44 installersHawaii & Pacific
10 installersSolar Panel Costs and Returns in the US
Typical costs and expected returns for residential and commercial solar panel systems in the US (2026 data). The federal residential ITC expired Dec 31, 2025. State incentives may reduce costs further.
| System Size | Typical Cost | Annual Generation | Annual Savings | Payback Period |
|---|---|---|---|---|
| 5 kW (small home) | $12,500 - $17,500 | 6,000 - 9,000 kWh | $900 - $1,500 | 9 - 14 years |
| 8 kW (avg home) | $20,000 - $28,000 | 9,600 - 14,400 kWh | $1,400 - $2,400 | 8 - 12 years |
| 12 kW (large home) | $30,000 - $42,000 | 14,400 - 21,600 kWh | $2,100 - $3,600 | 8 - 12 years |
| 25 kW (small commercial)* | $50,000 - $75,000 | 30,000 - 45,000 kWh | $4,500 - $7,500 | 7 - 10 years |
| 100 kW (commercial)* | $180,000 - $280,000 | 120,000 - 180,000 kWh | $18,000 - $30,000 | 6 - 9 years |
Savings assume $0.16/kWh national average electricity cost and 85% self-consumption. Actual returns vary by state, utility rates, net metering policy, and sun exposure. *Commercial projects that began construction before July 2026 may still qualify for the ITC under transition rules.
All Solar Installers
891 solar companies across the United States
512 Solar
VerifiedNABCEP
REC + Enphase
Atma Energy
VerifiedEnphase Platinum Installer · SEIA Member
Qcells + Enphase
Evolution Energy
Mission Solar + Enphase
PayOli Solar
VerifiedBBB Accredited · State Certified Solar Contractor
Hanwha Q Cells + Enphase
Simple Solar
VerifiedNABCEP · BBB Accredited · Q Cells Q.Partner · REC Certified ProTrust Installer
Q Cells + Enphase
Sprightful Solar
VerifiedState Certified Solar Contractor
Trust Solar
VerifiedState Certified Solar Contractor
8MSolar
VerifiedNABCEP Certified · Enphase Certified · Q Cells ProPartner · SunPower Authorized Dealer
Q Cells + Enphase
8MSolar
VerifiedNABCEP Certified · Enphase Certified · Q Cells ProPartner · SunPower Authorized Dealer
Q Cells + Enphase
Cascade Solar
VerifiedEnergy Trust of Oregon Trade Ally
Castaways Energy
VerifiedNABCEP
Connected Energy Solar
VerifiedNABCEP · BBB Accredited
Tier-1 Monocrystalline + Enphase
Custom Solar Solutions
VerifiedNABCEP Accredited · REC Pro Trust · Sol-Ark Platinum Installer · BBB Accredited
Qcells + Enphase
Elevated Solar and Electric
VerifiedBBB Accredited · Licensed Electrical Contractor
Elios Solar
Canadian Solar + SolarEdge
Elias Solar
VerifiedNABCEP Board Certified · BBB A+ · Texas Electrician License (36539)
LG Solar + Enphase
Emerald Energy
VerifiedNABCEP Certified · BPI Accredited Contractor · Tesla Powerwall Certified · Enphase Certified
Canadian Solar + Enphase
Emerald Energy
VerifiedNABCEP Certified · BPI Accredited Contractor · Tesla Powerwall Certified · Enphase Certified
Canadian Solar + Enphase
Emerald Sun Energy
Empowered Solar
VerifiedLEED Certified · Licensed Idaho Contractor
Tier-1 Solar Panels + Enphase
Envinity
VerifiedNABCEP
American-Made Solar Panels + Enphase
Exact Solar
VerifiedNABCEP · BBB Accredited
REC + Enphase
Florida Electric & Solar
VerifiedOSHA
Fresh Coast Solar
Green Wave Solar
VerifiedNABCEP · Pearl Certified · BBB A+
Qcells + Enphase
Independent Energy Hawaii
VerifiedBBB A+ Rated
REC + Enphase
iSolar
VerifiedNABCEP · BBB Accredited
REC + Enphase
Masterpiece Solar
VerifiedBBB Accredited · St. Johns County Chamber Member
Qcells + Enphase
Native Roofing & Solar
NC Solar Now
VerifiedNABCEP Certified · Tesla Certified · Enphase Certified · SolarEdge Certified
Q Cells + Enphase
North Texas Solar
VerifiedBBB A+
LG Solar
OneGrid
VerifiedNABCEP · EnergySage Elite Installer · BBB Accredited
Qcells + Enphase
Pennstar Solar
VerifiedNABCEP
REC + Enphase
Power Up Renewable Energy
VerifiedNABCEP · State of Ohio Electric License
Radiant Home Services
VerifiedClass A Contractor · BBB Accredited
Renewable Energy Design Group
VerifiedNC General Contractor · NC Electrical Contractor · NABCEP
Q Cells + Enphase
Resonant Energy
VerifiedB Corp
Roofed Right America
VerifiedBBB Accredited
Solar Pro
VerifiedBBB Accredited
Solar22
VerifiedNABCEP
REC + Enphase
SolRa Tech
Sphere Solar Energy
Sumintra
VerifiedNABCEP
REC + Enphase
Sunforce Solar
Sunpath Services
VerifiedEnergy Trust of Oregon Trade Ally
SunState Solar
VerifiedBBB A+ Accredited
Synergy Smart Homes
VerifiedNABCEP · SunPower Elite Dealer
SunPower + SunPower
TerraSol Energies
VerifiedNABCEP
REC + Enphase
Tiger Solar
VerifiedNABCEP · BBB Accredited
REC + Enphase
Transform Solar
Vespa Solar
Action Solar & Electric
VerifiedNABCEP PV Installation Professional · OSHA 10 Certified · Master Electrician · Licensed Electrical Contractor NC
Advanced Energy Systems
VerifiedEnergy Trust of Oregon Trade Ally · EWEB Approved Contractor · Oregon Department of Energy Authorized · Oregon Contractor License
SolarWorld
AEV Solar
VerifiedCertified Tesla Powerwall Installer · Arkansas Residential Unlimited Contractor License (0373130220) · Arkansas Solar Contractors License (Class 3)
American Dream Solar
VerifiedNABCEP
ANT Power
VerifiedBBB A+ Rated · BBB Accredited
Better Together Solar
VerifiedNABCEP Certified (3 professionals) · BBB A+ · Veteran Owned Small Business
Brilliant Harvest
VerifiedNABCEP · Tesla Energy Certified Installer · State Certified Solar Contractor · BBB A+ Rating
Tesla
Castle Energy
VerifiedBBB Accredited
Commonwealth Solar
VerifiedBBB A+
Cool Roofs Memphis
Tesla
Cornerstone Construction
Drews Solar
EcoBuild LLC
VerifiedBBB Accredited · Louisiana Licensed Contractor
EcoGen America
EcoVantage Energy
Electricraft
VerifiedMaster Electrician · BBB Accredited
Emerald Energy
VerifiedNABCEP Certified · NC General Contractor License · NC Electrical Contractor License
Enphase
Exact Solar
EZ Solar Service
VerifiedArizona ROC License 347304
Galaxy Solar Co
VerifiedNABCEP Certified
Geaux Green Solar
VerifiedLouisiana Licensed Contractor · Entergy Renewable Energy Partner
Go Solar WNY
VerifiedNABCEP Certified Solar Installation Professional · NYSERDA NY-Sun Qualified · Enphase Battery Storage Certified
Panasonic + Enphase
Great Plains Renewables
VerifiedLicensed Contractor
Heyo Smart
NC Solar Now
VerifiedNABCEP Certified · NC General Contracting License · NC Electrical Contractors License · VA AES Electrical License
Qcells + Enphase
Next Energy Solar
VerifiedFort Collins Utilities Approved Contractor · Colorado Contractor License
North Texas Solar
NXTGEN Clean Energy Solutions
VerifiedLicensed and Insured · Certified Solar Panel Maintenance
Omega Solar Energy
VerifiedBBB A Rated · BBB Accredited (since 2023)
Pickett Solar
VerifiedCSLB License 541612 · CALSEIA Member · Building Industry Association Member
Renewable Energy Design Group
VerifiedBBB A+ · NC General Contractor License · NC Electrical Contractor License
Sage Solar Oklahoma
VerifiedNABCEP Certified · BBB A+
Simple Solar
VerifiedNABCEP · Q.Cells Q.Partner · REC Certified ProTrust Installer · Canadian Solar Certified
Q.Cells + Enphase
Solar Dunn Right
VerifiedBBB A+
Solar Panels Virginia Beach
VerifiedNABCEP Certified
Solarugreen
South Shore Roofing
VerifiedBBB Accredited
Southern Energy Management
VerifiedNABCEP Certified · Certified B Corporation · Tesla Powerwall Certified · BBB A+
Southern Solar
VerifiedBBB A+ Rating · BBB Accredited · REC Certified
REC
Spotlight Electric
VerifiedBBB Accredited · Licensed Electrician
Spring Solar
StarVolt Solar
Sun's Eye Solar
VerifiedTesla Certified Installer · Enphase Certified
Enphase
Supreme Solar & Electric
VerifiedLicensed Contractor
TerraSol Energies
VerifiedBBB A+ · Delaware BBB Torch Award for Ethics (2025)
Unlimited Solar
VerifiedBBB Accredited · BBB A Rating
Vulcan Solar Power
VerifiedNABCEP · BBB A+ Rating
Wiring Solutions Plus
VerifiedBBB Accredited · Licensed Electrical Contractor
Zenergy Solar
VerifiedBBB A+
Apollo Solar
VerifiedBBB Accredited
Eagle Solar Power
VerifiedBBB Accredited
Good Faith Energy
VerifiedBBB Accredited · Tesla Certified Installer
Greenway Home Improvements
VerifiedVA License 2705186600 · DC License 410524000240 · MD License 154766
Helios Energy Global
ProSolar California
VerifiedBBB Accredited
REPOWER OC
VerifiedC-46 Solar Contractor License
REPOWER OC
VerifiedC-46 Solar Contractor License
Select Solar Professionals
Solar Bill Review
VerifiedBBB Accredited
The Solar Brokers USA
Solar Energy Solutions
Solar Power Integrator
VerifiedNABCEP Master Electrician · BBB A+ Rating
Solar Source
VerifiedC-46 Solar Contractor License · BBB Accredited
Solar Wave
VerifiedBBB Accredited
Solartime USA
VerifiedBBB Accredited
Southern Energy Management
VerifiedNABCEP Certified · BBB Accredited
Tesla
Superior Solar Inc
VerifiedSunPower Certified Dealer · BBB Accredited
SunPower
Texas Solar Professional
VerifiedEnergySage Installer of the Year · GAF Certified
Unlimited Solar
Vanguard Solar Services
Add Solar & Electrical
VerifiedBBB Accredited · State Certified Electrical Contractor · State Certified Solar Contractor
Apollo Energy
VerifiedB Corp Certified · NABCEP · BBB Accredited
REC + Enphase
ATX Solar
VerifiedNABCEP
Qcells + Enphase
Lighthouse Solar
VerifiedNABCEP · BBB Accredited
REC + Enphase
Solar Dynamics
VerifiedBBB Accredited · State Certified Solar Contractor · State Certified Roofing Contractor
SouthFace Solar & Electric
VerifiedNABCEP · BBB Accredited · ROC Licensed
SunPower + Enphase
Volt Solar Energy
VerifiedBBB Accredited · State Certified Solar Contractor
A&R Solar
VerifiedB Corporation · NABCEP
A&R Solar
VerifiedB Corporation · NABCEP
Astrawatt Solar
REC + Enphase
BKJ Solar
VerifiedNABCEP · Enphase Certified · Generac Dealer
SunPower + Enphase
Bone Dry Solar
VerifiedTesla Battery Certified · Tesla Solar Roof Certified · Owens Corning Approved
Boston Solar
VerifiedNABCEP
SunPower + Enphase
Brightstar Solar
VerifiedNABCEP
REC + Enphase
Cosmic Solar & Roofing
VerifiedBBB Accredited · CSLB Licensed
Direct Solar
VerifiedBBB Accredited
Earth Electric
VerifiedNABCEP · Licensed Electrical Contractor
REC + Enphase
Elemental Energy
VerifiedBBB Accredited · Energy Trust of Oregon Trade Ally
Gold Path Solar
VerifiedNABCEP Installation Professional · NABCEP System Inspector · Enphase Certified Gold Installer · Enphase Certified Battery Installer
Q Cells + Enphase
Good Faith Energy
VerifiedNABCEP · BBB Accredited · Tesla Certified Installer · Enphase Gold Installer
REC + Enphase
Great Sky Solar
VerifiedNABCEP
REC + Enphase
Green House Solar
VerifiedNABCEP
Green Power Energy
VerifiedNABCEP · CT Green Bank Contractor · BBB Accredited
Qcells + Enphase
Green Power Energy
VerifiedNABCEP
REC + Enphase
Green Rack Solar
VerifiedTesla Powerwall Certified · Enphase Platinum · Q.CELLS Q.Partner · REC ProTrust
Q.CELLS + Enphase
Helio GreenTech
VerifiedNABCEP · BBB Accredited
VSUN + Enphase
Highlight Solar
VerifiedDiamond Certified · PMI Accredited · AEE Member · BBB Accredited
SunPower + SolarEdge
Home Team Energy
Fronius
Jamar Power Systems
VerifiedNABCEP · BBB Accredited · CSLB Licensed
Lehmann Electrical & Design
VerifiedWisconsin Master Electrician · Tesla Certified EV Installer · BBB A+ Rating
LightSkye Energy
VerifiedBBB Accredited
Q Cells + Enphase
LightWave Solar
VerifiedNABCEP · Tennessee Electrical Contractor #58005
Canadian Solar + SolarEdge
North Peak Solar
VerifiedNABCEP · BBB Accredited
REC + Enphase
NuWatt Energy
VerifiedNABCEP
REC + Enphase
Ohio Power Solutions
VerifiedNABCEP
SMA
Positive Energy Solar
VerifiedNABCEP · B-Corp Certified · SunPower Master Dealer
SunPower + Enphase
Power Northwest
PowerSol USA
Public Service Solar
Puget Sound Solar
VerifiedBBB Accredited · NABCEP
Purelight Power
VerifiedBBB Accredited
Radiant Energy Solar
ReNew Solar Solutions
VerifiedNABCEP · BBB A+ · SEIA · Tesla Certified
Maxeon + Sol-Ark
Robco Electric
VerifiedBBB Accredited · NV Master Electrician
SCSP Solar
VerifiedBBB Accredited
REC + Enphase
Second Sunrise Solar
REC + Enphase
Simple Indy
Sol-Up
VerifiedBBB Accredited · NV Contractor License #0075025
Solar City STL
VerifiedNABCEP · Enphase Gold Certified · Silfab Certified · IronRidge Certified
Silfab + Enphase
Solar Mentor
Solar Plus
VerifiedNABCEP Certified PV Installation Professional · OSHA Certified · Licensed Electrical Contractor
Canadian Solar
Solectric
VerifiedBBB A+ · CSLB Licensed
SunPower
Solstice Solar
VerifiedNABCEP · Tesla Certified · Enphase Certified · FranklinWH Certified
REC + Enphase
Spectrum Solar Power
Sunergy Systems
VerifiedREC Certified Installer · Tesla Powerwall Certified
REC + Enphase
Sunshine Renewable Solutions
VerifiedNABCEP Accredited · BBB A+
Qcells + Enphase
Sunshine Renewable Solutions
VerifiedNABCEP Accredited · BBB A+
Qcells + Enphase
Switch Electric Home Energy
TayCo Electric & Solar
VerifiedNABCEP · Tesla Powerwall Certified · SunPower Excellence Award
SunPower + Enphase
Technicians for Sustainability
VerifiedNABCEP Accredited Company · SunPower Elite Dealer
SunPower + Enphase
Texas Solar Professional
VerifiedNABCEP · BBB A+ · Tesla Powerwall Certified · GAF Certified
Texas Solar Professional
VerifiedNABCEP · BBB A+ · Tesla Powerwall Certified
TruNorth Solar
VerifiedNABCEP · BBB A+ Accredited
REC + Enphase
Virginia Energy Solutions
VerifiedBBB Accredited
Qcells + Enphase
West Seattle Electric and Solar
VerifiedBBB Accredited
Yes Solar Solutions
VerifiedNABCEP Accredited Company · Tesla Powerwall Certified · Tesla EV Charging Certified · BBB A+ Rating
Q Cells + Enphase
Arizona Solar Wave & Energy
VerifiedNABCEP Certified · BBB A+ · ROC Licensed General Contractor
Brightstar Solar
VerifiedNABCEP · Top Solar Contractor (Solar Power World)
Enphase
CMI Solar & Electric
VerifiedBBB Accredited
Generac
Creative Energies
Detail Solar
VerifiedNABCEP Certified · SolarEdge Certified · Enphase Certified · Generac Certified
SolarEdge
Envision Solar
VerifiedBBB Accredited
Full Spectrum Solar
VerifiedNABCEP · HVAC Licensed · Electrical Contractor Licensed
SMA
Globe Electric
VerifiedBBB Accredited
Good Energy Solutions
VerifiedNABCEP Certified (most in KS/MO) · Tesla Powerwall Certified Installer · SunPower Elite Dealer · BBB Accredited
SunPower
Good Faith Energy
VerifiedTesla Certified Installer
Helios Solar
VerifiedNABCEP · BBB A+ Rating
JIT Solar
VerifiedNABCEP Certified · LEED Certified · BBB Accredited · SRP Preferred Installer
KW Solar Solutions
MAD Energy NW
VerifiedNABCEP Certified · PSE Affiliate · Master Electrician
Midwest Solar Power
VerifiedNABCEP · SEIA
REC + Enphase
Mirasol Solar
VerifiedState Certified Solar Contractor · State Certified Plumbing Contractor · SunPower Authorized Dealer · Tesla Powerwall Certified Installer
SunPower
Mount Solar
VerifiedMaster Electrician · WASEIA Member · Solar Washington Sponsor
Namaste Solar
VerifiedNABCEP · B Corporation · Colorado Contractor License
NovaTerra Energy
Okie Solar
VerifiedNABCEP Certified · BBB A+ · Enphase Certified Installer · SolarEdge Certified Installer
Axitec + Enphase
Paff Electric & Solar
VerifiedBBB Accredited · Women's Business Enterprise (WBE) · Small Business Enterprise (SBE) · EVITP Certified
Pure Power Solar
VerifiedNABCEP Certified · BBB A+
Purelight Power
Redemption Solar and Roofing
VerifiedBBB A+ · Veteran-Owned Business
Redstone Solar
VerifiedNAHBGreen Certified · NARGreen Certified · USGBC LEED Green Associate
Sandbox Solar
VerifiedBBB Accredited · Colorado Contractor License
REC + Enphase
Solar Energy Solutions
VerifiedNABCEP Certified · Tesla Powerwall Certified Installer · SunPower Certified Dealer
Canadian Solar
Solar Negotiators
Solar Pathways
VerifiedColorado Contractor License
Solartime USA
State Electric Company
VerifiedMasters Electrical License MI/OH/IN · EVITP
Sunergy Systems
SunMade Smart Roofing Solar & Electric
VerifiedDiamond Certified · BBB A+ · C-46 Solar License · C-39 Roofing License
SunPower + Enphase
Sustainergy Cooperative
VerifiedNABCEP Certified · BPI Certified · BBB Accredited
Tiger Solar
VerifiedNABCEP
TMI Energy Solutions
VerifiedNABCEP Certified · Licensed Electrical Contractor
Walter Roofing + Solar
VerifiedOwens Corning Certified · Versico Certified
Yes Solar Solutions
VerifiedNABCEP Accredited Company · Tesla Powerwall Certified · REC Certified Installer · SolarEdge Preferred Partner
REC + Enphase
Gault Electric
VerifiedBBB Accredited · NABCEP Certified
Independent Power Systems
VerifiedBBB Accredited
Soltech Energy
Yes Solar Solutions
VerifiedNABCEP Certified · BBB Accredited · Woman-Owned Business
Airis Energy Solutions
VerifiedState Certified Solar Contractor
American Array Solar and Roofing
VerifiedGAF Certified · Panasonic Certified · Enphase Gold
Panasonic + Enphase
Black Platinum Solar & Electric
VerifiedBBB Accredited · ROC Licensed · Panasonic Authorized Installer · Enphase Authorized Installer
Panasonic + Enphase
Freedom Power
VerifiedNABCEP · BBB Accredited · Tesla Certified · Maxeon Certified Installer
Maxeon + Enphase
Namaste Solar
VerifiedNABCEP · B Corp Certified · SEIA Member
REC + Enphase
Nova NRG
VerifiedBBB Accredited · State Certified Solar Contractor
Solar Optimum
VerifiedTesla Certified · Enphase Platinum · GAF Certified · QCells Certified
QCells + Enphase
Solar Optimum
VerifiedNABCEP · Tesla Certified Installer · Enphase Platinum Installer · BBB Accredited
REC + Enphase
Solar Power Pros
VerifiedTesla Certified · NABCEP
REC + Enphase
Solar Side Up
VerifiedNABCEP · Enphase Platinum · SEIA Member · ASES Member
Silfab + Enphase
Albion Power Company
VerifiedCSLB Licensed
All Energy Solar
VerifiedNABCEP · BBB A+ Accredited
REC + Enphase
Arsenal Solar
VerifiedNABCEP · BBB Accredited
REC + Enphase
Artisan Electric
VerifiedTesla Solar Roof Certified · Tesla Powerwall Certified · IBEW Union Labor
Tesla + Enphase
Astrawatt Solar
VerifiedTesla Powerwall Certified · Enphase Platinum Installer · BBB Accredited
REC + Enphase
Barrett Solar
VerifiedBBB Accredited
Better Tomorrow Solar
VerifiedSEIA Member · SEPA Member · BBB Accredited
Black Diamond Electric
VerifiedMaster Electrician - Idaho · Licensed in Idaho, Utah, Wyoming
Tier-1 Solar Panels + Enphase
Boss Energy
VerifiedTesla Certified Installer
REC + Enphase
Brda Electric
VerifiedLicensed Electrical Contractor · BBB Accredited
Brooklyn SolarWorks
VerifiedBBB Accredited · NABCEP · NYSERDA Certified
Cedar Creek Energy
VerifiedNABCEP
REC + Enphase
Clay Solar Installation Partners
VerifiedBBB Accredited · FL Licensed Solar Contractor
Qcells + Enphase
Clean Solar
VerifiedCSLB Licensed · BBB Accredited
Enphase
Coast to Coast Solar
REC + Enphase
Cobalt Power Systems
VerifiedBBB Accredited · SunPower Elite Dealer · CSLB Licensed
SunPower + SunPower
Current Electric
VerifiedNABCEP PV Professional · Focus on Energy Trade Ally · Grow Solar Selected Installer
Enphase
Custom Solar and Leisure
VerifiedNABCEP · BBB A+ Accredited · ROC Licensed
EcoSmart Home Services
VerifiedNABCEP · CT Green Bank Contractor
Qcells + Enphase
ES Solar
VerifiedNABCEP · BBB A+ · SolarEdge Certified
SolarEdge + SolarEdge
EverGuard Solar
VerifiedBBB A+ Accredited
Exceptional Energy Solutions
VerifiedNABCEP · Ameren Trade Ally Partner
Freedom Solar Power
VerifiedNABCEP · Tesla Powerwall Certified · BBB A Rating
Maxeon + Enphase
Green Rack Solar
VerifiedNABCEP · Tesla Powerwall Certified Installer · Enphase Platinum Installer · Q Cells Q.Partner
Q Cells + Enphase
Green Sun Energy Services
Idahome Energy
VerifiedBBB Accredited · Licensed Idaho Contractor · APsystems Certified
Silfab + APsystems
Ilum Solar
VerifiedBBB A+ · REC Solar Professional · SunPower Certified · Enphase Preferred Installer
REC + Enphase
Infinium Solar Roofing and Electric
VerifiedSunPower Certified Dealer · CSLB Licensed
SunPower + SunPower
Integrated Building Systems
Isaksen Solar
VerifiedNABCEP
Enphase
Johnson Solar
VerifiedCSLB Licensed
Qcells + Enphase
JTE Solar
VerifiedLicensed Electrician
Qcells + Enphase
Kilo Hollow Energy
VerifiedBBB Accredited · Licensed Contractor (VA)
Lumina Solar
VerifiedNABCEP
REC + Enphase
Luminous Solar
MCH Nashville
VerifiedBBB Accredited · Licensed General Contractor · Licensed Electrical Contractor · Licensed Mechanical Contractor
Qcells + Enphase
Michigan Solar Solutions
VerifiedNABCEP · BBB A+ Rating
Solaria + SolarEdge
New England Clean Energy
VerifiedNABCEP · EnergySage Expert Choice · BBB Accredited
Qcells + Enphase
Newport Solar
VerifiedNABCEP · BBB Accredited
Qcells + Enphase
North Coast Solar
VerifiedSolar Insure Certified · Pearl Certification · BBB A+ Rating
Open Sky Energy
VerifiedNABCEP
REC + Enphase
Power Factor
VerifiedMaster Electrician · BBB Accredited
Powered Alliance Solar
VerifiedNABCEP · Licensed Idaho Contractor
Tier-1 Solar Panels + Enphase
Premier Improvements Solar
VerifiedSunPower Dealer · Owens Corning Dealer
SunPower + SunPower
Quality Solar
Renewable Energy Corporation
VerifiedBBB Accredited · NABCEP
REC + Enphase
Rick Sells Solar
VerifiedAuthorized Generac Dealer · Licensed Idaho Electrician
Tier-1 Solar Panels + Enphase
Shockoe Solar
VerifiedLicensed Contractor (VA) · Licensed Contractor (NC)
Enphase
Shoreline Solar
VerifiedCT Green Bank Contractor
Qcells + Enphase
Smart Green Solar
VerifiedNABCEP · EVITP Certified
Qcells + Enphase
Solar Energy Consultants
VerifiedBBB Accredited · CSLB Licensed
Solar Guys of Nevada
VerifiedBBB Accredited · NV Licensed EPC Contractor
Solar Negotiators
VerifiedNABCEP · BBB Accredited · OSHA Certified · Owens Corning Preferred Contractor
Solar Power Pros
VerifiedNABCEP
LG + Enphase
Solar States
VerifiedNABCEP · B Corp Certified
REC + Enphase
SolarGuru Energy
VerifiedBBB Accredited · CSLB Licensed · SunPower Dealer
SunPower + Enphase
Solarise Solar
SolaTrue St. Louis
VerifiedBBB Accredited · Enphase Certified
Enphase
Southern Energy Management
VerifiedNABCEP Certified PV Installer · NABCEP Certified Technical Sales · B Corp Certified · Tesla Powerwall Certified
Q Cells + Enphase
Sovereign Solar
VerifiedNABCEP PV Installation Professional · NABCEP PV Technical Sales Professional · NABCEP PV System Inspector · ETA International PV Installer Level 1
Spring Solar
VerifiedBBB Accredited
Stellar Solar
VerifiedTesla Certified Premier Installer · BBB A+ Rating
SunPower + Enphase
Sun Peach Solar
VerifiedBBB Accredited
Sun Power Energy
Sunlight Solar
VerifiedCSLB Licensed
Sunline Energy
VerifiedBBB Accredited · NABCEP · Tesla Certified · CSLB Licensed
Qcells + Enphase
Sunny Side Solutions
VerifiedNABCEP · BBB A Accredited
Silfab + Enphase
SunSent Solar
VerifiedBBB Accredited
Silfab + Enphase
Sunspear Energy
VerifiedBBB Accredited · NABCEP Certified · SolarEdge Certified Installer
REC + SolarEdge
SunVena Solar
Sutro Power
VerifiedNABCEP · CSLB Licensed
Silfab + Enphase
Synergy Solar
VerifiedBBB Accredited · GAF Certified Roofing Contractor · NFPA Certified · OSHA Certified
Qcells + Enphase
Tampa Bay Solar
VerifiedFSEC
Tennessee Solar
VerifiedNABCEP PVA-071924-016319 · Tesla Certified · FranklinWH Certified · Enphase Certified
Qcells + Enphase
Texas Direct Solar
The Solar Guys
VerifiedNABCEP · SEIA Member · Enphase Platinum Certified
REC + Enphase
Touch Of Power Solutions
VerifiedNC Licensed Electrical Contractor · BBB Accredited
Q Cells + Enphase
Wayne's Solar
VerifiedBBB A+ · Panasonic Elite Installer · Angi Super Service Award 2023 · FL Licensed Solar Contractor CVC56698
Panasonic + Enphase
WindSoleil
A&R Solar
VerifiedNABCEP Certified · B Corp Certified
Enphase
Agathon Solar
VerifiedNABCEP · Tesla Certified
Silfab + Fronius
Alt E Wind & Solar
VerifiedNABCEP · BBB A+ Rating · Colorado Contractor License
Mission Solar + Enphase
AmeriWest Electric and Solar
VerifiedTesla Certified Installer · Generac Certified Installer · MrCool Certified Installer
Aneva Solar
VerifiedNABCEP · Tile Roofing Institute Certified · OSHA Certified
Meyer Burger + Enphase
Apollo Energy
VerifiedB Corporation · SolarEdge Certified Installer · Colorado Contractor License
SolarEdge
Arc Energy Solutions
VerifiedCSLB #1121783 · BBB Accredited
Arch Solar
VerifiedNABCEP · WBE
Arizona Custom Solar
VerifiedROC Licensed
Barkley Solar
Bluff City Solar Co
VerifiedNABCEP
Buffalo Solar Solutions
VerifiedBBB A+ Rating · SEIA Member
CB Solar
VerifiedNABCEP
Climatize
VerifiedOregon Contractor License
Colorado Solar Co
VerifiedColorado Contractor License
Convert Solar
VerifiedNABCEP Certified · BBB A+ Rating · Virginia Class A Licensed
Cromwell Solar
VerifiedProfessional Contractor License · Master Electrician
Daily Green Power
VerifiedNABCEP Certified · BBB Accredited · Certified Tesla Powerwall Installer · Solarize Louisville Vetted Installer
ECG Solar
VerifiedNABCEP
Energy Design
VerifiedEnergy Trust of Oregon Trade Ally · Oregon Contractor License
SunPower + SMA
FireFly Solar
VerifiedTesla Premier Certified Installer · Tesla Solar Roof Certified · Enphase Encharge Certified · BBB A+ Rated
Maxeon
Full Circle Roofing
VerifiedBBB Accredited
Gold Path Solar
VerifiedEnergySage Installer of the Year 2025 · EnergySage Installer of the Year 2026 · BBB Accredited
Great Basin Solar
VerifiedNABCEP Certified (3 certifications) · Nevada Contractor License (0083677) · ICC Certified
REC + Enphase
Green Energy Services
VerifiedCSLB #1095087
Green Wave Solar
VerifiedNABCEP Certified · 2023 RE+ Installer of the Year
Greenify Energy Savers
Greenville Solar Solutions
Harvest Solar Energy
Harvest Solar
VerifiedNABCEP
SunPower
Icon Solar
VerifiedNABCEP Certified · BBB A+ · Tesla Powerwall Authorized Installer
REC + Enphase
The Integrity Energy Group
VerifiedEnphase Silver Certified · Tesla Certified · SolarEdge Certified · Sol-Ark Certified
Enphase
J & D Energy
Mann Solar
VerifiedNABCEP Certified · BBB A+ · Generac Certified · Sol-Ark Certified
Sol-Ark
National Solar
VerifiedEnergy Trust of Oregon Trade Ally · BBB A+ Rating · Oregon Contractor License
REC
Nelnet Renewable Energy
VerifiedSEIA Member · BBB A+
Northwest Renewables
VerifiedNABCEP · Panasonic Elite Installer
Panasonic + Enphase
Old Coast Heating & Air Conditioning
VerifiedBBB Accredited · ENERGY STAR Certified
Optimum Solar Power
Paramount Energy
VerifiedLicensed, Bonded, and Insured
Phelps Solar Specialists
Positive Energy Solar
VerifiedNABCEP Certified · Certified B Corporation
REC Solar + Enphase
Poulin Solar Pro
VerifiedBBB A+
Q Cells + Enphase
Region Solar + Electric
VerifiedState Certified Solar Contractor · State Certified Electrical Contractor · BBB Accredited
ReNew Solar Solutions
VerifiedNABCEP
Renew Energy
VerifiedBBB A+ Rating · BBB Accredited
Reno Solar
VerifiedBBB Accredited
Renu Energy Solutions
VerifiedNABCEP Certified · BBB Accredited · Licensed General Contractor · Licensed Electrical Contractor
SunPower + SolarEdge
Rocknoll Energy Systems
VerifiedBBB Accredited · Authorized Generac Dealer · Authorized Sol-Ark Dealer · Authorized SolarEdge Dealer
SolarEdge
Sagebrush Energy
VerifiedNevada C-2 Electrical License (93511) · OSHA 30 · BBB Accredited · Tesla Certified
Enphase
Service Solar
VerifiedSolarEdge Certified · Enphase Certified
SolarEdge
Solar Assist
VerifiedOregon Department of Energy Approved · EWEB Approved Contractor · Oregon Contractor License
Solar by Ecos
VerifiedNABCEP Certified · BBB Accredited
Solar Energy Solutions
VerifiedNABCEP Certified (7 PV Certifications) · BBB Accredited
Solar Heat & Electric
VerifiedNABCEP PV Installer (PV-041214-004782) · BBB Accredited
Solar Negotiators
VerifiedNABCEP Certified · BBB A+ · Owens Corning Preferred Contractor · OSHA Certified
Solaris Renewables
VerifiedMassCEC Approved
Enphase
SolarQuote Installation & Maintenance
VerifiedCSLB License 1065106 · General B, C-10, C-46 Licenses
Solarside Electric
VerifiedLicensed and Insured
Enphase
Southern Solar & Electrical Contracting
Sun Peak Solar Services
VerifiedBBB A+ Rating · CSLB Licensed
Enphase
Sun Vault Roofing
CertainTeed Solstice
SunRock Solar
SunStack Solar
VerifiedCSLB License 1134027
Qcells
Tapps Electric
VerifiedBBB A+ Rated · BBB Accredited · Union Certified Electricians
Texas Solar Professional
T&K Electric Company
VerifiedLicensed Electrical Contractor · BBB Accredited
Tru-Fuse Solar
VerifiedBBB A+ · Licensed Electricians
Zahns Energy
Advanced Solar
VerifiedBBB Accredited · Montgomery County Green Bank Partner
APG Solar
VerifiedBBB Accredited
Carolina Connections Solar
Celestial Solar & Water Systems
VerifiedBBB Accredited
Clark Energies
VerifiedBBB Accredited
EDGE Energy
VerifiedENERGY STAR Contractor of the Year (6x) · SunPower Authorized Dealer
SunPower + SunPower
Green State Power
VerifiedNABCEP Certified · BBB Accredited
Solaria Solar and Roofing
VerifiedBBB Accredited
Sunrise Energy Solutions
VerifiedBBB Accredited
Excited Energy
VerifiedNABCEP · BBB Accredited
REC + Enphase
Goldin Solar
VerifiedBBB Accredited · Tesla Certified Installer · State Certified Solar Contractor
Hanwha Q Cells + SolarEdge
Green Convergence
VerifiedNABCEP · BBB Accredited · SunPower Master Dealer
Maxeon + Enphase
Greenstar Power
VerifiedNABCEP · BBB Accredited
Qcells + Enphase
NRG Clean Power
VerifiedNABCEP · BBB Accredited · Tesla Certified · Enphase Gold
REC + Enphase
Palmetto Energy
VerifiedNABCEP · BBB A+ Accredited · SEIA Member
Q Cells + Enphase
Sandbox Solar
VerifiedNABCEP · BBB Accredited · Nextdoor Neighborhood Favorite
REC + Enphase
816 Solar Pro
VerifiedBBB Accredited · Enphase Certified
Silfab + Enphase
Alltech Solar
VerifiedBBB Accredited · CSLB Licensed
Apollo Energy
SolarEdge
Arch Solar
VerifiedNABCEP · BBB A+ Rating · Solar Power World Top Contractor
Enphase
Bluebird Sky Solar
VerifiedBBB Accredited
Tier-1 Monocrystalline + Enphase
Citadel Roofing & Solar
VerifiedBBB A Rating · CSLB Licensed
Clean Solar
VerifiedBBB Accredited · CSLB Licensed
Enphase
Cobalt Power Systems
VerifiedSunPower Elite Dealer · SunPower Commercial Dealer · Tesla Powerwall Certified · CSLB Licensed
Maxeon + Enphase
Creative Energies
VerifiedNABCEP · Certified B Corporation · BBB A+
SolarEdge + SolarEdge
Distributive Solar
VerifiedNABCEP
Canadian Solar + SolarEdge
Eco Solar Hawaii
VerifiedBBB A+ Rated · SunPower Master Dealer · Maxeon Preferred Partner · Tesla Powerwall Premier Installer
SunPower + Enphase
EcoGen America
EFS Energy
VerifiedNABCEP · MOSEIA Member · USGBC Member · ISEA Member
Silfab + Enphase
EGT Solar
VerifiedLicensed Idaho Electrician
Tier-1 Solar Panels + Enphase
Florida Power Services
VerifiedNABCEP · FSEC · BPI
Full Spectrum Solar
VerifiedGrow Solar Selected Installer
Go Solar Energy NC
VerifiedNC Licensed Contractor
Q Cells + Enphase
Green Ridge Solar
VerifiedBBB Accredited
Greenify Energy Savers
VerifiedBBB A+
Home Solar CT
VerifiedNABCEP
Qcells + Enphase
Indy Solar Solutions
Infinity Energy
VerifiedEnergySage Installer of the Year 2025 · EnergySage Installer of the Year 2026 · Elite+ Installer
Qcells + Enphase
Infinity Energy
Infinity Solar USA
VerifiedBBB Accredited
Ion Solar Pros
VerifiedNABCEP · CT Green Bank Contractor
Qcells + Enphase
JC Solar
VerifiedLicensed Contractor (MD)
JC Solar
VerifiedNABCEP
REC + Enphase
JK Exteriors
VerifiedBBB A+
KC Energy Solar
VerifiedBBB Accredited
KW Solar
REC + Enphase
LightSkye Energy
Lowcountry Solar Solutions
Hanwha Q Cells + Enphase
MC Power Companies
VerifiedNABCEP · SEIA Member · Top Solar Contractor (Solar Power World)
Northwest Electric & Solar
VerifiedBBB Accredited · Tesla Premier Certified
Tesla + Tesla
NRG Clean Power
VerifiedNABCEP · BBB Accredited · Enphase Certified · REC Certified
REC + Enphase
NY State Solar
VerifiedBBB Accredited · NYSERDA Gold Quality
OceanHead Solar & Electric
VerifiedBBB Accredited · Women-Owned Business
REC + Enphase
PA Green Solar
VerifiedNABCEP
REC + Enphase
PES Solar
POCO Solar Energy
VerifiedCSLB Licensed · BBB Accredited
Poulin Solar Pro
VerifiedBBB A+ Accredited · Authorized Enphase Installer
QCell + Enphase
Prestige Solar Services
Renu Energy Solutions
VerifiedNABCEP · Tesla Powerwall Premier Certified · Tesla Solar Roof Premier Certified · Enphase Certified
SunPower + Enphase
Renu Energy Solutions
VerifiedNABCEP · Tesla Powerwall Premier Certified · Tesla Solar Roof Premier Certified · Enphase Certified
SunPower + Enphase
ReVision Energy
VerifiedNABCEP · B Corp
REC + Enphase
Sandia Mountain Solar
VerifiedNM Licensed Contractor
Simmitri
VerifiedNABCEP · GAF Master Elite · Enphase Gold Vendor · BPI Certified
Silfab + Enphase
Sol Power Solar
VerifiedNABCEP · BBB Accredited
Qcells + Enphase
Solar Energy Solutions
VerifiedNABCEP
Enphase
Solar Gain
VerifiedBBB A+ Accredited · ROC Licensed
Solar King
Solar Luxury LLC
VerifiedBBB Accredited
Solterra Solar
VerifiedWOSB (Woman-Owned Small Business)
Southern Exposure Solar
VerifiedNABCEP · CertainTeed Master Solar Installer · BBB Accredited
CertainTeed + Enphase
Spark Building Energy Solutions
VerifiedNABCEP · Certified Energy Manager (C.E.M.) · BPI Building Analyst · Generac Certified Installer
REC + Enphase
StraightUp Solar
VerifiedNABCEP · B Corp
Enphase
StraightUp Solar
VerifiedNABCEP · Certified B Corp · BBB A+
Silfab + Enphase
Strawberry Solar
VerifiedBBB Accredited
Canadian Solar + SolarEdge
Summit Energy
VerifiedNABCEP
REC + Enphase
Sun Service Specialists
VerifiedNABCEP · BBB Accredited
SunPower + Enphase
Sun Solar
VerifiedBBB Accredited · Green Business Network Member
Sunblaze Energy
VerifiedBBB Accredited · ROC Licensed
Sunfinity Power
VerifiedBBB Accredited
Qcells + Enphase
Sunpath Solar
VerifiedBBB A+ · FL Certified Solar Contractor CVC57021 · HomeAdvisor Elite
Qcells + Enphase
Tempo Solar World
VerifiedBBB Accredited · NV Contractor License
The Solar Roofers
VerifiedLicensed Contractor
Canadian Solar + Tesla
Vegas Solar
VerifiedBBB Accredited
Velo Solar
VerifiedLicensed Professional Engineer · BBB Accredited
Windfree Solar
VerifiedNABCEP
1 Source Solar
VerifiedNABCEP
8MSolar
VerifiedNABCEP Certified · BBB A+ · Enphase Certified Installer · Tesla Powerwall Certified
REC + Enphase
Amenergy
VerifiedNM Construction Industries License (363436) · BBB A+
Aspen Electric
VerifiedNABCEP Certified (032611-238) · Nevada C-2 Electrical License · BBB Accredited
Benton Electric
VerifiedOregon Contractor License
Dr. Shock Professional Electrical Services
VerifiedNevada Licensed Electrician · BBB Accredited
Eagle Solar & Light
VerifiedAmicus Solar Cooperative Member · BBB Accredited
EightTwenty Solar
VerifiedLicensed Contractor (#095963)
Feazel
VerifiedGAF Master Elite Contractor · NABCEP Certified · BBB A+ · GAF Certified Green Roofer
GAF Timberline Solar
Harrimans Solar Energy Solutions
VerifiedState Certified Solar Contractor · State Certified Electrical Contractor · State Certified Pool/Spa Contractor · BBB A+ Rating
Ilum Solar
VerifiedC-46 Solar Contractor License · REC Certified Dealer · Enphase Certified Installer · Tesla Certified Installer
REC + Enphase
Independent Power Generation
VerifiedNABCEP · Tesla Certified Installer · EGSA Member
Tesla + Enphase
Infinity Energy
VerifiedEnergySage Installer of the Year · NYSERDA Approved
Inter Faith Electric & Solar
Inty Power
VerifiedBBB Accredited · Tesla Powerwall Authorized Installer
IronHead Solar
VerifiedBBB A+ Rating · Owens Corning Platinum Preferred Contractor · GAF Gold Elite Commercial Contractor · Oregon Contractor License
JEH Solar
VerifiedBBB A+ Rated · Louisiana Licensed Contractor
Johnson Restoration Services
VerifiedBBB A+
Kardan Solar
VerifiedBBB Accredited
King Solar
Kostoff Construction
VerifiedBBB Accredited
LightWave Solar
Melink Solar
VerifiedNABCEP Certified · SEIA Member · UL Certified · LEED Certified
Mitten Solar Consultants
VerifiedBBB A+ Rating
New England Clean Energy
VerifiedNABCEP · MassCEC Approved
REC + Enphase
Nola Solar Energy
Off Grid Enterprises
VerifiedNABCEP Certified · BBB Listed
Pacific Solar
VerifiedBBB Accredited
PacWest Solar
Perfection Solar
Photon Brothers
VerifiedTesla Powerwall Certified Installer · BBB Accredited · Colorado Contractor License
PlugPV
VerifiedNABCEP · Tesla Certified Partner · Generac Partner
Enphase
Pro Terra Solar Technologies
VerifiedBBB A+
Progressive Power Solutions
VerifiedNABCEP Certified · BBB A+
Puget Sound Solar
ReNew Solar Solutions
VerifiedEnergySage Local Installer of the Year · Top 10 Solar Technology Solutions Provider
Roof Guys
VerifiedBBB Accredited
Seal Solar
VerifiedCertified Tesla Powerwall Installer · BBB Accredited
Silfab + SolarEdge
Simple Power Solar
VerifiedNABCEP Certified PV Installer
Smart Solar Energy
VerifiedOregon Contractor License
Smart Wave Solar
VerifiedBBB Accredited
Sol Luna Solar
VerifiedNABCEP Certified · Licensed General Contractor (NM) · Licensed Electrician (NM)
Solar by CIR
VerifiedNABCEP Certified · NYSERDA Quality Installer
Enphase
Solar Penny
Magnum Dimensions
Solar Power Supply
VerifiedTesla Certified Installer
Solaria + Enphase
South Carolina Solar
South Coast Solar
VerifiedNABCEP · SunPower Master Dealer · Tesla Powerwall Certified Installer · BBB A+ Rating
SunPower
Sun Solar
VerifiedSunPower Master Dealer
SunPower + Enphase
Sun Valley Solar Solutions
VerifiedNABCEP · SunPower Authorized Dealer · SRP Preferred Solar Installer · BBB A+ Rating
SunPower
Sundance Power Systems
SunPeak
VerifiedISO 9001 · FM Global Approved
Techsico Solar
VerifiedNABCEP PVIP (x2) · Tesla Certified Installer
The Big Deal Solar
Vivo Energy
Bay Area Solar Solutions
Brilliant Harvest
Forme Solar Electric
VerifiedBBB Accredited
Infinity Solar
VerifiedTesla Certified Installer
Tesla
Ipsun Solar
VerifiedDC Green Bank Partner · Montgomery County Green Bank Partner
Sol-Up
VerifiedNABCEP Certified · Tesla Powerwall Certified Installer · Panasonic Solar Elite Installer
Panasonic
Solar Services Inc
VerifiedBBB Accredited
Tempo Solar World
VerifiedBBB Accredited
Alba Energy
VerifiedBBB Accredited · NABCEP
Qcells + Enphase
AWS Solar
VerifiedNABCEP · BBB Accredited · Tesla Certified · Panasonic Certified
CertainTeed + Enphase
Golden Solar
VerifiedNABCEP · BBB Accredited
REC + Enphase
NATiVE Solar
VerifiedNABCEP · BBB Accredited · Amicus Solar Cooperative Member
Mission Solar + Enphase
Photon Brothers
VerifiedNABCEP · SunPower Elite
SunPower + Enphase
Solar Topps
VerifiedNABCEP · Tesla Certified Installer · Enphase Gold Installer · REC Certified Solar Professional
REC + Enphase
Sun Valley Solar Solutions
VerifiedBBB A+ Accredited · NABCEP · SEIA Member · Tesla Certified Installer
SunPower + Enphase
SunPower Inc
VerifiedNABCEP · SunPower Authorized
SunPower Monolith + SunPower
Watt Masters
VerifiedROC Licensed · BBB Accredited · NABCEP
REC + Enphase
Absolute Comfort
Accord Power
VerifiedBBB Accredited
Ailey Solar Electric
VerifiedNABCEP
Enphase
Astrawatt Solar
VerifiedBBB Accredited · Inc. 5000 Honoree
Bob Heinmiller Solar
VerifiedNABCEP · State Certified Electrical Contractor
Panasonic + SolarEdge
Brightergy
VerifiedBBB Accredited · LEED Certified HQ
Capital City Solar
VerifiedNABCEP · SunPower Elite Dealer · BBB A+ · CSLB Licensed
SunPower + SunPower
Celestial Solar & Water Systems
VerifiedNV Contractor License
Convert Solar
VerifiedNABCEP · Class A Contractor (VA)
REC + SolarEdge
Energy Independent Solutions
VerifiedNABCEP · BBB Accredited
Monocrystalline Tier-1 + Enphase
EMPWR Solar
VerifiedBBB Accredited
REC + Enphase
Green Hybrid Energy Solutions
Go Solar Rhode Island
VerifiedRhode Island REP Certified
Qcells + Enphase
Green Street Solar
Greentech Renewables Indianapolis
REC + Enphase
Huston Solar
Intelligent Design Air Conditioning, Plumbing, Solar, & Electric
VerifiedBBB A+ Accredited · ROC Licensed
Jefferson Electric
VerifiedNABCEP · Master Electrician · Licensed General Contractor · OSHA Safety Certified
Enphase
Magic Solar
VerifiedLicensed Idaho Contractor
Tier-1 Solar Panels + Enphase
Neil Kelly Solar
VerifiedB Corporation · BBB Accredited
Photon Brothers
Rooftop Power
VerifiedNABCEP · EnergySage Elite Installer · BBB Accredited
Qcells + Enphase
Sol Luna Solar
VerifiedNABCEP · BBB A+ Rated
Solar Bear
VerifiedNABCEP
Solar Help Hawaii
VerifiedBBB A+ Rated
REC + Enphase
Steiner's Solar
VerifiedCSLB Licensed
Suncatcher of Atlanta
VerifiedBBB Accredited
Qcells + Enphase
Sundial Energy
VerifiedNABCEP
REC + Enphase
SunSolar Solutions
VerifiedBBB Accredited
The Green Panel
VerifiedBBB A+ Rating
Panasonic + Enphase
YellowLite
VerifiedBBB Accredited
Enphase
A&R Solar
VerifiedNABCEP · Tesla Powerwall Certified Installer · Certified B Corporation · BBB A+ Rating
SunPower + Enphase
Artisan Electric
VerifiedTesla Solar Roof Certified · Tesla Powerwall Certified · Union Labor
Bright World
VerifiedLicensed Contractor
Covenant Solar & Roofing
VerifiedBBB Accredited
Crown Roofing & Solar
VerifiedRoofing Insights Certified · Kansas Roofing License CT-20-008520
Daniels Plumbing, Heating and Air Conditioning
VerifiedLicensed Contractor (NM)
Del Sol Energy
VerifiedBBB A Rating · Nevada License (0086376) · California License (1008525)
Earthlight Technologies
VerifiedOregon Contractor License
H&H Solar Energy Services
High Peaks Solar
VerifiedNABCEP · NYSERDA Certified · REC Certified
Canadian Solar
Ideal Energy
VerifiedNABCEP · SDVOSB
Kasselman Solar
VerifiedNYSERDA Approved · BBB Accredited
Enphase
Lunex Power
Enphase
MSI Solar
VerifiedTesla Powerwall Certified Installer · CSLB #994536
National Solar Technologies
VerifiedNABCEP Certified PV Installation Professional · GSA Schedule Contract · NYS OGS Contract
Okie Solar
Progressive Energy Solutions
Redemption Solar and Roofing
VerifiedBBB Accredited
Renova Energy
Renovus Solar
ReVision Energy
VerifiedNABCEP · B Corp Certified
Enphase
Savannah Roofs
Scottsdale Solar
VerifiedBBB A+ Rating
Sol-Up
VerifiedNABCEP Certified
Meyer Burger + Enphase
Solar America
VerifiedSolar Power World #1 Residential Sales Contractor (2022-2024)
Solar Energy Solutions of America
VerifiedLicensed and Insured · Sarasota County Construction License
Solar Services Inc
VerifiedEmployee-Owned
Solar Tech
Solux Power
South Coast Solar
VerifiedSunPower Authorized Dealer
SunPower
Spokane Electric LLC
Summit Energy
Enphase
SunState Solar
VerifiedLicensed Contractor (NM)
Supreme Power
VerifiedBBB A+ Rating
Think Solar OKC
Vulcan Solar Power
VerifiedNABCEP Certified PV Installation Professional · Licensed General Contractor · Licensed Residential Homebuilder/Remodeler · BBB Accredited
Revolution Solar
VerifiedBBB Accredited · DC Licensed Solar Contractor
Solaire
Solar22
SWT Energy
VerifiedBBB Accredited · Tesla Certified Installer
IntegrateSun
VerifiedNABCEP · BBB Accredited
REC + Enphase
Longhorn Solar
VerifiedNABCEP · BBB Accredited
REC + Enphase
A1A Solar Contracting
VerifiedNABCEP Company Accredited · BBB A+ · Tesla Certified Installer · Enphase Gold Dealer
Tesla + Enphase
Akamai Energy
VerifiedBBB Accredited
Panasonic + Enphase
Alder Energy Systems
VerifiedBBB Accredited · NABCEP Certified
REC + SolarEdge
Alternate Energy Inc.
VerifiedBBB A+ Rated · BBB Accredited
Panasonic + Enphase
American Solar Energy Systems
VerifiedBBB Accredited · FL Licensed Solar Contractor
Qcells + Enphase
Arvo Solar
Aurora Power & Design
VerifiedBBB Accredited · Licensed Idaho Contractor
Tier-1 Solar Panels + Enphase
Aviara Solar Contractors
VerifiedCSLB Licensed
Aztec Solar
VerifiedNABCEP Board Member · California Solar + Storage Association · BBB Accredited
Big Dog Solar Energy
VerifiedNABCEP · BBB Accredited · UL Certified
REC + SolarEdge
Big Dog Solar
VerifiedNABCEP
Bluenergy Solar
VerifiedBBB Accredited · FL Licensed Solar Contractor
Qcells + Enphase
Bright Solar
VerifiedBBB A Rating
Brightest Solar
VerifiedBBB Accredited
Hanwha Q Cells + Enphase
Commonwealth Power
VerifiedNABCEP
Creative Solar USA
VerifiedNABCEP Certified PV Installation Professional · NABCEP Certified Technical Sales Professional · SEIA Member · GSEA Member
Dragon Scale Roofing & Solar
VerifiedSolar and Roof Dual Certification
Qcells + Enphase
EcoHouse Solar
VerifiedNABCEP
JinkoSolar + Enphase
EDGE Energy
VerifiedBBB Accredited · NABCEP
Enphase
Elek Solar
VerifiedSEIA Member
EmPower Solar
VerifiedSunPower Master Dealer · NYSERDA Certified
SunPower + SunPower
Energy Doctors
Ethical Energy Solar
VerifiedNABCEP
US-Made Solar Panels + Enphase
Freedom Solar Power
VerifiedNABCEP · Tesla Powerwall Certified · BBB A Rating
Maxeon + Enphase
Freedom Solar Power
VerifiedSunPower Master Dealer · NABCEP · Tesla Powerwall Certified
SunPower + Enphase
Freedom Solar Power
VerifiedSunPower Master Dealer · NABCEP · Tesla Powerwall Certified
SunPower + Enphase
Grid City Electric
VerifiedNABCEP · NV Master Electrician
Hannah Solar
VerifiedNABCEP · Licensed Master Electricians (GA, AL, MS, NC, SC, TN)
HSI Solar
VerifiedAMICUS Solar Cooperative Member · Solar Power World Top Contractor
Imagine Energy
Intermountain Wind & Solar
VerifiedNABCEP · BBB Accredited · Idaho Contractor License
Canadian Solar + Enphase
Kokosing Solar
VerifiedNABCEP · Authorized SunPower Dealer · BBB A+ Rating
SunPower + Enphase
Malama Solar
VerifiedBBB Accredited
REC + Enphase
NCI Solar Group
VerifiedNABCEP
Nevada Solar Group
VerifiedNABCEP
New England Clean Energy
VerifiedNABCEP
SunPower + Enphase
NRG Clean Power
VerifiedBBB Accredited · CSLB Licensed · Tesla Certified
REC + Enphase
Occidental Power
VerifiedBBB Accredited · CSLB Licensed
Solaria + SolarEdge
OE Solar
VerifiedNABCEP · BBB A+ Accredited · Tesla Certified Installer
OHM Solar Solutions
VerifiedBBB Accredited
Pittsburgh Solar
Tier-1 Solar Panels + String Inverters
PozitivEnergy
Tier-1 Solar Panels + Microinverters
PPC Solar
VerifiedNABCEP
Quixotic Systems
VerifiedNABCEP · NYSERDA Certified · NYC Licensed General Contractor
RSRV Power
VerifiedNABCEP · BBB A+ Rating
Q Cells + Enphase
RxSun
VerifiedNABCEP
Enphase
SC Solar Energy
Hanwha Q Cells + Enphase
Schoenherr Solar
VerifiedBBB Accredited (Roofing Division)
Selenium Energy
Semper Solaris
VerifiedBBB Accredited · CSLB Licensed · Tesla Certified
Qcells + Enphase
Skyline Solar
VerifiedNABCEP
Qcells + Enphase
Smart Wave Solar
VerifiedNABCEP · BBB Accredited
Hyperion + Enphase
Solar Energy Labs
VerifiedBBB Accredited · FL Certified Solar Contractor CVC56672
Qcells + Enphase
Solar Energy Services
VerifiedNABCEP · BBB Accredited
Enphase
Solar Energy Systems
VerifiedNABCEP · NYSERDA Certified
Solar Gaines
VerifiedBBB Accredited
Solar Path
VerifiedNABCEP · LEED · ROC Licensed
Solar Pros AZ
VerifiedBBB Accredited · ROC Licensed
QCell + Enphase
Solar Technologies
VerifiedSunPower Bay Area Master Dealer · SunPower National Commercial Volume Dealer
SunPower + SunPower
Solect Energy
VerifiedNABCEP
SOLENERGY
South Carolina Solar
Hanwha Q Cells + Enphase
Southern Current
VerifiedBBB Accredited
Hanwha Q Cells + SolarEdge
Stardust Solar Columbus
Stellar Solar
VerifiedBBB Accredited · CSLB Licensed
SunPower + Enphase
SunPower Builders
VerifiedNABCEP
SunPower + Enphase
Trinity Solar
VerifiedNABCEP · BBB Accredited
Qcells + Enphase
United Better Homes
VerifiedBBB Accredited
Qcells + Enphase
WCP Solar
Western Solar Solutions
WindSoleil
VerifiedNABCEP
Wolf River Electric
VerifiedNABCEP · BBB A+ Accredited
REC + Enphase
Absolute Solar
ACE LLC Solar
ACES Energy
All Energy Solar
VerifiedNABCEP
Astrawatt Solar
VerifiedNABCEP Certified PV Installation Professional · OSHA Certified · BBB A+ · SEIA Member
Barrett Solar
Blue Raven Solar
Blueprint Solar
Boston Solar
VerifiedNABCEP · MassCEC Approved
Enphase
Bright Home Energy
VerifiedLicensed and Insured Contractor
Buffalo Renewables
Carolina Solar Services
Chroma Energy Group
VerifiedNABCEP
CKR Solar
VerifiedTesla Powerwall Certified Installer
CKR Solar
VerifiedTesla Powerwall Certified Installer
Coastal Roofworks
VerifiedBBB A- Rating
Coastal Solar Power
VerifiedGeorgia Grown Member
Creative Solar USA
VerifiedNABCEP · BBB Accredited
CST Solar (Consolidated Solar Technologies)
VerifiedSunPower Elite Dealer
SunPower + SunPower
Current Renewable Efficiencies
Delta Solar
VerifiedBBB Accredited (since 2025)
Eagle Point Solar
VerifiedNABCEP · SEIA
Eagle Solar & Light
VerifiedNABCEP · Tesla Powerwall Certified Installer · AMICUS
Ecovis Solar
VerifiedNABCEP Certified Installer · NYSERDA Approved · BBB Accredited
Edison Solar
VerifiedNABCEP Certified
Canadian Solar + Enphase
Elav8 Consulting
ElectriPros
VerifiedBBB A+ Rating · Virginia Class A Solar Certified
Empire Solar & Electric
VerifiedNABCEP · NYSERDA Approved
Energy Solutions
Energy Solutions and Supplies
Feazel
VerifiedNABCEP Certified · BBB A+ · GAF Master Elite Certified · GAF Certified Green Roofer
GAF Timberline Solar
GES Solar
VerifiedNABCEP · Fronius Solutions Certified · sonnen Certified Installer
Fronius
Grape Solar
VerifiedOregon Contractor License
Grape Solar
Heartland Roofing, Siding and Solar
Hemphill Solar
Hudson Solar
Icon Solar
IES Texas Solar
J-Tech Construction & Solar
VerifiedBBB Accredited (since 2010)
JCO Solar
VerifiedLouisiana Licensed Contractor (72777) · Sol-Ark Certified Installer · Lion Energy Certified Installer · IronRidge Certified Installer
Sol-Ark
Kokosing Solar
VerifiedNABCEP Certified · BBB A+ · Authorized SunPower Dealer
SunPower
LowCo Roofing and Exteriors
VerifiedSavannah Chamber of Commerce Member
Lucent Energy
Tesla
Meraki Solar NM
Merica Solar Panels
Midsouth Solar Pros
New Energy Solutions
VerifiedBBB Listed
NOLA Solar Power
Nova West Energy
VerifiedBBB A+ · SEIA Member · CALSEIA Member · American Solar Energy Society Member
NRG Clean Power
Palm River Electric
VerifiedLicensed Electrical Contractor
PCI Renewables
Peak Power Solar
VerifiedNABCEP Certified · UL Certified · BBB Accredited
Quality Solar
Renu Energy Solutions
VerifiedSolarEdge Certified
SolarEdge
Rocket City Solar Systems
Rocky Top Solar
Savannah Solar Power
Sarasota SRQ Solar
VerifiedLicensed and Insured
Semper Solaris
VerifiedBBB Accredited · Owens Corning Platinum Preferred Contractor · Tesla Certified Installer
Tesla
Sierra Solar Systems
VerifiedNevada Licensed Contractor
SMS Energy Group
Solar Alliance Southeast
VerifiedNABCEP · 2025 Top Solar Contractor
Solar Buffalo
Solar Optimum
Solar Sarah Energy Solutions
Solar Technology Alabama
Solar Works Energy
Solargize
VerifiedColorado Contractor License
Somos Solar
VerifiedNM Electrical License (Gb 98, 410656)
Southern Exposure Solar
Southern Solar & Electrical Contracting
Southern Solar Systems
VerifiedNABCEP Certified · Licensed Electrical Contractor · Alabama Solar Industry Association Member
Southern Solar Systems
Spokane Solar Power
Sun City Solar Energy
VerifiedNABCEP Certified · Enphase Gold Installer · Generac PWR Partner · BBB A+ Rated
Enphase
Sunergy Solutions
Sunlux
SunVest Solar
Trident Solar
VerifiedNABCEP PV Installation Professional · Virginia Class A Licensed · Alternative Energy Systems Specialty License
Tri-State Electrical Contractors
VerifiedLicensed in Alabama · Licensed in Tennessee · Licensed in Georgia · Licensed in North Carolina
Trivium Solar
True Construction Omaha
U.S. Energy Solutions
US Solar Supplier
VerifiedBBB A-
Viridis Energy
Voltric Electric
VerifiedBBB Accredited
Watt Masters
VerifiedBBB Accredited
Wattson Home Solutions
VerifiedMass Save Partner
Canadian Solar
Your Home Solar
District Energy
Solaria
Solar Solution DC
VerifiedBBB Accredited · DC Licensed Contractor
Solgen Power
All Bay Solar
VerifiedBBB Accredited · CSLB Licensed
Canadian Solar + Enphase
Dovetail Solar and Wind
VerifiedBBB Accredited
Everything Solar
Geoscape Solar
Powerfully Green Solar
VerifiedNABCEP · BBB A+ Accredited
REC + Enphase
ProSolar Florida
Solar Revolution
VerifiedBBB Accredited · CSLB Licensed
Bonilla Roofing
VerifiedBBB Accredited · Owens Corning Certified
Comalli Group
VerifiedNYSERDA Approved
ESD Solar
Everlight Solar
VerifiedNABCEP
Everlight Solar
VerifiedNABCEP Certified PV Installation Professional · BBB A+
Global Solar Roofing & Construction
VerifiedBBB Accredited (since 2025)
Intermountain Wind & Solar
VerifiedEnergySage Elite Installer
Longhorn Solar
VerifiedNABCEP
Phoenix Exteriors Roofing & Solar
VerifiedGAF Certified · REC Americas Best Residential Solar Project 2024
Tesla Solar Roof
Roofing Crew Knoxville
VerifiedBBB Accredited
Semper Solaris
Solar Alternatives
VerifiedNABCEP
Strawberry Solar
VerifiedTesla Powerwall Certified · REC Certified Solar Professional · Enphase Ensemble Certified · BBB A+ Rating
Panasonic + Enphase
Sunbum Solar & Roofing
VerifiedNABCEP Certified · BBB A+ Rating
SunRenu Solar
VerifiedBBB Accredited
REC
Top Tier Solar Solutions
YellowLite
VerifiedNABCEP Certified · BBB A+ · LG Certified · SunPower Certified
Canadian Solar
Harmon Solar
VerifiedBBB A+ Accredited · NABCEP · ROC Licensed
SunPower + Enphase
Sunshine Renewable Solutions
VerifiedNABCEP · BBB Accredited
Qcells + Enphase
Intermountain Wind & Solar
VerifiedNABCEP · BBB A+
Silfab + SolarEdge
Longhorn Solar
VerifiedNABCEP · BBB A+
Longhorn Solar
VerifiedNABCEP · BBB A+
NRG Clean Power
VerifiedBBB Accredited
NuWatt Energy
VerifiedNABCEP
Qcells + Enphase
Parrot Solar
VerifiedBBB A- · Tesla Premier Installer · FL Certified Solar Contractor CVC57072
Tesla + Tesla
Rectify Solar
VerifiedNABCEP · Pearl Certification · EPA Lead Safety Certified · OSHA Safety Certified
Saguaro Solar
VerifiedBBB A+ Accredited · Tesla Certified Powerwall Installer · ROC Licensed
Solar Solution AZ
VerifiedNABCEP · BBB A+ Rated · ROC Licensed
Steel City Solar
Sunlight Solar
VerifiedState Certified Solar Contractor · State Certified Electrical Contractor
Silfab + SolarEdge
SunVest Solar
VerifiedBBB Accredited · Solar Power World Top 50 · Focus on Energy Trade Ally
AEC Solar
VerifiedNABCEP · SEIA Member · SunPower Master Dealer · NYSERDA Approved
SunPower + Enphase
Advosy Energy
VerifiedLicensed Contractor
Akino Solar
VerifiedNABCEP
SolarEdge
Alpha Omega Construction Group
VerifiedOwens Corning Certified
Baton Rouge Air
VerifiedLouisiana Licensed Contractor
Bland Company
VerifiedNABCEP Master Level · Licensed HERO Contractor · HomeAdvisor Screened & Approved
Blue Raven Solar
VerifiedNABCEP · BBB A Rating
Maxeon + Enphase
Comfort Engineered Systems
VerifiedBBB Accredited
Florida Power Services
VerifiedState Certified Solar Contractor
GenPro Energy Solutions
VerifiedTesla Certified Installer · Generac Certified Installer
ION Solar
VerifiedOklahoma License #192776
JK Renewables
Qcells + Enphase
JK Renewables
Qcells + Enphase
Joule Energy
VerifiedNABCEP · Certified B Corporation
Solar Liberty
VerifiedNABCEP Certified · NYSERDA Certified Contractor · OSHA 10 Certified · OSHA 500 Certified
Enphase
Solar Liberty
VerifiedNYSERDA Approved · NABCEP · BBB Accredited
Specialty Service Group
VerifiedLicensed Electrical Contractor
Urban Solar
VerifiedState Certified Solar Contractor · State Certified Electrical Contractor · Tesla Powerwall Certified Installer · Enphase Platinum Installer
Q Cells + Enphase
1 Sun Solar Electric
VerifiedNV Contractor License
Affordable Solar
VerifiedNABCEP · BBB A+ Accredited
Astrum Solar
VerifiedNABCEP
Everlight Solar
VerifiedNABCEP · BBB Accredited
REC + Enphase
Green Solar Systems
VerifiedNABCEP · BBB Accredited · PA Home Improvement Contractor · City of Pittsburgh Master Electrician
Tier-1 Monocrystalline + Enphase
Luminalt
VerifiedCSLB Licensed · SunPower Certified Dealer
SunPower + SunPower
Mechanical Energy Systems
Palmetto
VerifiedNABCEP · NC Licensed Electrical Contractor
Q Cells + Enphase
Palmetto
VerifiedNABCEP · NC Licensed Electrical Contractor
Q Cells + Enphase
Project Solar
VerifiedBBB Accredited
Scalo Solar Solutions
VerifiedNABCEP PV Associate · BBB Accredited
Jinko Solar + Enphase
Top Tier Solar Solutions
VerifiedBBB A+ Rating · Licensed Electrical Contractor (NC, SC, VA, OH, KY, TX)
Silfab + Enphase
Top Tier Solar Solutions
VerifiedBBB A+ Rating · Licensed Electrical Contractor (NC, SC, VA)
Silfab + Enphase
Tungsten Solar
VerifiedNABCEP Certified Installer · Licensed Electrical Contractor
Qcells + SolarEdge
YSG Solar
Albany Solar Solutions
Go Solar Power
Solar Direct
VerifiedNABCEP · BBB A+ Rating
Solgen Power
VerifiedBBB Accredited
SunnyMac Solar
VerifiedBBB A+ · 2025 BBB Torch Award for Ethics · Top 10 Residential Solar Company (Solar Power World 2025)
Watrous Associates Architects
VerifiedUSGBC Certified · NREL Award (1994)
Wilderness Trace Solar
VerifiedBBB Accredited
NeoSolar
Island Pacific Energy
REC + SolarEdge
Rethink Electric
Skytech Solar
VerifiedNABCEP · CSLB Licensed
Canadian Solar + Enphase
Solar Energy World
VerifiedNABCEP · BBB Accredited
REC + Enphase
ESD Solar
VerifiedBBB A+ Rating · Certified Building Contractor · Certified Electrical Contractor
Energy Service Partners
VerifiedBBB A+
Qcells + Enphase
Haleakala Solar & Roofing
VerifiedBBB A+ Rated · BBB Accredited
REC + Enphase
ION Solar
VerifiedBBB Accredited
Meraki Solar NM
VerifiedNABCEP
Solar.IQ
VerifiedNABCEP
Supreme Electric & Solar
VerifiedTexas Licensed Electrician
The Solar Store
VerifiedNABCEP · BBB A+ Accredited · ROC Licensed
Blue Raven Solar
VerifiedBBB A+ Rating · Colorado Electrical Contractor License
Maxeon + Enphase
Byrd on the Roof
VerifiedGAF Certified · BBB Accredited
ION Solar
VerifiedNABCEP Certified · BBB A+
Momentum Solar
Robinson Solar Solutions
VerifiedBBB Accredited
Solar Advantage
Semper Solaris
SolarMax Technology
Sun Solar Memphis
Solar 1 USA
VerifiedNABCEP
Sol-Ark
All Solar Power
VerifiedNABCEP
Luma Solar
Sun Valley Renewables
VerifiedBBB Accredited
Roberts-McNutt
VerifiedBBB Accredited
GroundUp Solar & Electrical
VerifiedLouisiana Licensed Contractor (334635) · BBB Accredited
Bell Mountain Solar
Green Light Solar
VerifiedLouisiana Licensed Contractor (305988)
Plannet Solar
SOLR Energy
VerifiedNABCEP Certified PV Professionals · BBB Accredited
Today's Power
VerifiedBBB A+ Rated · BBB Accredited (since 2019)
Wanex Electrical Services
VerifiedBBB Accredited
How We Rank Solar Installers
Our rankings combine verified customer reviews, certification status, years of experience, service range, and warranty coverage into a single SurgePV Score. Companies are ranked by this score, with featured installers shown first.
Customer Reviews
We aggregate ratings from Google, Yelp, BBB, and SolarReviews. Only companies with strong track records are listed.
Certifications
NABCEP certification is the US gold standard. We also check for state licensing, BBB accreditation, and manufacturer certifications.
Track Record
Years in business, projects completed, warranty coverage, and service range contribute to the overall score.
Why Trust the SurgePV Directory?
Every company listed here has been independently researched and verified. We check certifications against official registers, aggregate reviews from multiple platforms, and verify that every business is actively trading. Companies cannot pay to improve their ranking — placement is based on verified data only.
891
Verified Companies
93,062
Customer Reviews
How to Choose a Solar Installer in the US
Check NABCEP Certification
NABCEP (North American Board of Certified Energy Practitioners) is the gold standard for solar installer certification in the US. While not legally required in all states, it demonstrates a high level of training and competence. Also verify that the company holds the required state contractor's license.
Get Multiple Quotes
Get at least three quotes from different installers. Solar pricing varies 20-30% between companies for the same system. A good quote includes equipment specs, total cost, expected production, warranty terms, and projected savings with your specific utility rate.
Read Independent Reviews
Check Google, Yelp, BBB, and SolarReviews ratings. Look for patterns in negative reviews — repeated complaints about communication, delays, or warranty claims are red flags. Our directory aggregates reviews from all major platforms.
Understand the Warranty
A reputable installer offers separate warranties for panels (25 years), inverter/microinverters (12-25 years), and workmanship (10-25 years). Be wary of companies offering unusually short installation warranties or vague coverage terms. Ask if the company will still be around to honor the warranty.
Verify Insurance and Licensing
Confirm the installer carries general liability insurance, workers' compensation, and holds the proper state electrical/general contractor license. Ask whether they handle all permitting, utility interconnection, and incentive paperwork on your behalf.
Design Faster. Sell More.
SurgePV is the solar design platform used by installers across the US. Cut design time by 60%, generate professional proposals in minutes, and close more deals.
60%
Faster project design
10 min
Full design turnaround
Solar Installation in the US: Step by Step
Free Consultation
Contact an installer for a free site assessment. They'll evaluate your roof, shading, energy usage, and utility rate structure.
Design & Quote
Receive a detailed proposal with system size, equipment, costs, available state incentives, and projected 25-year returns.
Permitting
Your installer handles building permits, HOA approvals, and utility interconnection applications.
Installation
Panels, inverter, and wiring installed in 1-3 days. Followed by city inspection and utility meter swap.
Permission to Operate
Utility grants PTO, your system goes live, monitoring is activated, and you start saving on electricity.
Frequently Asked Questions
How much do solar panels cost in the US?
The average cost of a residential solar system in the US is $2.50-$3.50 per watt. A typical 8kW system costs $20,000-$28,000. The 30% federal residential tax credit expired on December 31, 2025, so these costs are now the full out-of-pocket price. State incentives, net metering credits, and SRECs can still reduce your effective cost. Costs vary by state, installer, equipment quality, and roof complexity.
What is the federal solar tax credit?
The 30% federal residential solar tax credit (ITC) expired on December 31, 2025, following the passage of the One Big Beautiful Bill. Homeowners installing solar in 2026 and beyond can no longer claim this credit. The ITC previously covered equipment, installation labor, permitting, and battery storage. Commercial solar projects may still qualify under transition rules if construction began before July 2026. State-level tax credits and incentives remain available in many states.
What certifications should a US solar installer have?
NABCEP (North American Board of Certified Energy Practitioners) certification is the gold standard for solar professionals in the US. While not legally required in all states, it signals advanced training and expertise. At minimum, your installer should hold the required state contractor license (electrical or general, depending on state), carry liability insurance and workers' compensation, and have manufacturer certifications for the equipment they install.
How does net metering work?
Net metering lets you send excess solar electricity to the grid and receive credits on your utility bill. When your panels produce more than you use during the day, the surplus goes to the grid. At night, you draw power back. Your bill reflects the net difference. Policies vary by state — some offer full retail rate credits, others use reduced rates or time-of-use structures. Check your state and utility's current policy, as several states have reformed net metering in recent years.
Is battery storage worth it?
Battery storage costs $10,000-$15,000 for a 10-13 kWh system. The 30% federal residential credit that previously applied to batteries expired at the end of 2025. Batteries are still worth considering if you experience frequent power outages, have time-of-use electricity rates, or live in a state without favorable net metering (like California under NEM 3.0). Some states offer their own battery incentives. Batteries increase self-consumption and provide backup power. Popular options include Tesla Powerwall, Enphase IQ Battery, and Franklin WH.
Do I need a permit for solar panels?
Yes. Solar installations in the US require building and electrical permits in most jurisdictions. Your installer typically handles all permitting on your behalf, including HOA approval if applicable and utility interconnection applications. Some jurisdictions have adopted SolarAPP+ for automated, same-day permit approvals. The permitting process typically takes 2-6 weeks depending on your local authority.
How long do solar panels last?
Modern solar panels are warrantied for 25-30 years and can continue producing electricity for 30-40 years. Most manufacturers guarantee at least 80-87% of original output after 25 years. Microinverters (Enphase) typically come with 25-year warranties, while string inverters (SolarEdge, SMA) are warrantied for 12-15 years. Solar panels require minimal maintenance — occasional cleaning and an annual inspection are sufficient.