AS

Absolute Solar

Full-service Michigan solar installer with offices across the state providing residential, commercial, and agricultural solutions

Grand Rapids, Michigan
4.5 (40 reviews)
Residential Commercial

6+

Years in Business

40

Customer Reviews

124 mi

Service Area

11-50

Employees

SurgePV Score

6.8 / 10
Customer Reviews
90%
Certifications
0%
Experience
70%
Services Range
90%
Warranty Coverage
80%
Online Presence
100%

About Absolute Solar

Absolute Solar is a Michigan-based solar energy company with its main office at 4063 Grand Oak Drive A-107 in Lansing, Michigan, and additional offices serving Grand Rapids, Troy, and Ann Arbor. The company provides residential, commercial, and agricultural solar energy solutions across the state.

Absolute Solar offers full-service solar installation including system design, permitting, installation, and ongoing maintenance. The company handles projects from initial consultation and energy audit through final interconnection, providing turnkey solar solutions for homeowners and businesses throughout Michigan.

The Grand Rapids office can be reached at (616) 226-3398. The company has built a presence across Michigan with a focus on quality installations and competitive pricing. Absolute Solar serves the greater Grand Rapids area along with communities across the lower peninsula of Michigan.

Service Area

Absolute Solar serves the following areas within a 124-mile radius:

Grand RapidsLansingTroyAnn ArborKalamazooHolland

Are you Absolute Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Energy Audit
Maintenance

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.5

40 reviews

Paul M.

1 September 2025
Verified Customer

Absolute Solar handled our Grand Rapids residential install efficiently. The design maximized our roof space and the system has been producing more than projected. Very satisfied.

Diane R.

10 June 2025
Verified Customer

Good company with multiple Michigan offices. They were responsive and the installation crew was professional. System is working well after several months.

Greg T.

5 March 2025
Verified Customer

Chose Absolute Solar after comparing several quotes. They offered competitive pricing and followed through on everything promised. The Grand Rapids team was great to work with.

Frequently Asked Questions About Absolute Solar

What services does Absolute Solar offer?

Absolute Solar offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Maintenance.

Is Absolute Solar NABCEP certified?

Absolute Solar holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does Absolute Solar serve?

Absolute Solar serves Grand Rapids, Lansing, Troy, Ann Arbor, Kalamazoo, Holland. They are based in Grand Rapids with a service radius of 200 km.

What warranty does Absolute Solar offer?

Absolute Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Absolute Solar's customer reviews?

Absolute Solar has a 4.5/5 rating based on 40 customer reviews. Customers consistently rate them highly.

How long has Absolute Solar been in business?

Absolute Solar was founded in 2020 and has been in business for 6 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Absolute Solar

Fill in your details and we'll connect you with Absolute Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote