AS

Ace Solar Energy

Which? Trusted Trader and Solar Trade Association member providing award-winning solar installations in Wolverhampton since 2010

Wolverhampton, UK
4.9 (84 reviews)
Verified
Residential Commercial

16+

Years in Business

0

84

Customer Reviews

50 km

Service Area

11-50

Employees

SurgePV Score

8 / 10
Customer Reviews
98%
Certifications
75%
Experience
100%
Services Range
90%
Warranty Coverage
40%
Online Presence
25%

About Ace Solar Energy

Ace Solar Energy, the trading name of Ace Electrical (Wolverhampton) Ltd, is based at Unit 18 Hollies Industrial Estate, Graiseley Row, Wolverhampton, West Midlands WV2 4HE. The company specialises in solar PV installations, battery storage systems, EV charging, and energy efficiency consultations for residential and commercial customers across Wolverhampton and the wider West Midlands.

Originally established as an electrical contractor, Ace Electrical transitioned to focus on solar PV approximately thirteen years ago as demand for renewable energy grew across the region. The company is MCS accredited and a member of the Solar Trade Association. It is also endorsed by Which? Trusted Traders, which requires businesses to pass regular checks before displaying the endorsement.

Ace Solar Energy has won the Renewable Energy Awards for Best Solar Installation Company and received recognition at the Solar Power Portal Awards for Excellence in Sustainability. With a 4.9-star rating from 84 Which? Trusted Trader reviews, the company earns consistent praise for its transparent sales approach, professional installation teams, and responsive aftercare. Office staff members Lucy, Alicia, and Tracey are frequently named by reviewers for their attentive and knowledgeable customer service throughout the quotation and installation process.

The company manages the full project lifecycle in-house, from initial site survey and system design through to installation, commissioning, MCS certificate issue, and Smart Export Guarantee registration.

Service Area

Ace Solar Energy serves the following areas within a 50 km radius:

WolverhamptonWalsallDudleyBilstonWest BromwichStourbridgeTipton

Are you Ace Solar Energy?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Maintenance
Energy Audit

Certifications & Accreditations

MCS Solar Trade Association

Warranty Coverage

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

4.9

84 reviews

Karen W.

14 October 2025
Verified Customer

I would highly recommend Ace Solar — this is probably the best experience I have had with any major work to my house. No pushy selling, faultless installation, and professional teams throughout.

David H.

22 July 2025
Verified Customer

Lucy, Alicia, and Tracey were all friendly, professional, knowledgeable, and timely with looking at the different options available and answering all of my questions throughout the process.

Mark P.

9 April 2025
Verified Customer

Good friendly crew with a good experience from start to finish. Competitive pricing and the installation was completed to a very high standard.

Frequently Asked Questions About Ace Solar Energy

What services does Ace Solar Energy offer?

Ace Solar Energy offers Solar Installation, Battery Storage, EV Charging, Maintenance, Energy Audit.

Is Ace Solar Energy MCS certified?

Yes, Ace Solar Energy is MCS certified and also holds Solar Trade Association certification. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Ace Solar Energy serve?

Ace Solar Energy serves Wolverhampton, Walsall, Dudley, Bilston, West Bromwich, Stourbridge, Tipton. They are based in Wolverhampton with a service radius of 50 km.

What warranty does Ace Solar Energy offer?

Ace Solar Energy offers 10-year installation/workmanship warranty.

How are Ace Solar Energy's customer reviews?

Ace Solar Energy has a 4.9/5 rating based on 84 customer reviews. Customers consistently rate them highly.

How long has Ace Solar Energy been in business?

Ace Solar Energy was founded in 2010 and has been in business for 16 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Ace Solar Energy

Fill in your details and we'll connect you with Ace Solar Energy.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote