Solar Installers in the United Kingdom

Compare MCS-certified solar companies across England, Scotland, Wales, and Northern Ireland. Read verified reviews and request free quotes.

503 Companies 50 Cities 125,148 Reviews

UK Solar Energy: Market Overview

16.6 GW

Installed Capacity

1.3M+

Solar Installations

70 GW

2035 Target

0% VAT

On Residential Solar

The UK Solar Market in 2026

The UK has over 16.6 GW of installed solar capacity spread across more than 1.3 million installations. Despite its reputation for cloudy weather, the UK receives enough solar irradiance to make residential and commercial solar systems financially viable in every region. Southern England receives around 1,100 kWh/m² per year, while Scotland and Northern England still receive 900–1,000 kWh/m².

The government's target of 70 GW of solar capacity by 2035 — more than four times current capacity — signals strong long-term demand for qualified installers. The solar industry employs over 12,000 people and is growing at roughly 15% per year.

Since April 2022, residential solar installations are VAT-exempt at 0%, reducing the upfront cost of a typical 4kW system to between £5,000 and £8,000. Payback periods now sit between 6 and 8 years depending on location, energy usage, and export rates.

Key Incentives and Policies

Smart Export Guarantee (SEG)

Licensed energy suppliers must pay households for surplus electricity exported to the grid. Rates range from 4–6p/kWh, with some suppliers offering fixed rates above 12p/kWh. Your system must be MCS-certified to qualify.

0% VAT on Solar

Since April 2022, homeowners pay zero VAT on solar panel and battery storage installations. This applies to all domestic properties across the UK and saves roughly £1,000–£1,500 on a typical system.

ECO4 Scheme

The Energy Company Obligation (ECO4) provides free or subsidised solar panels to low-income households. Eligibility is based on property EPC rating and household income.

Permitted Development

Most domestic solar installations don't require planning permission under permitted development rights. Exceptions include listed buildings, conservation areas, and panels protruding more than 200mm from the roof.

Solar Panel Costs and Returns in the UK

Typical costs and expected returns for residential and commercial solar panel systems in the UK (2026 data).

System Size Typical Cost Annual Generation Annual Savings Payback Period
3 kW (small home) £4,000 – £6,000 2,500 – 3,000 kWh £500 – £700 7 – 9 years
4 kW (avg home) £5,000 – £8,000 3,400 – 4,000 kWh £700 – £950 6 – 8 years
6 kW (large home) £7,000 – £11,000 5,100 – 6,000 kWh £1,000 – £1,400 6 – 8 years
10 kW (small commercial) £10,000 – £16,000 8,500 – 10,000 kWh £1,700 – £2,400 5 – 7 years
50 kW (commercial) £35,000 – £55,000 42,500 – 50,000 kWh £8,500 – £12,000 4 – 6 years

Savings assume 24p/kWh electricity cost and 50% self-consumption. Actual returns vary by location, roof orientation, and energy usage.

All Solar Installers

503 solar companies across the United Kingdom

AL

A. Lloyd Electrical & Solar

Verified
5.0 (1 reviews)
Swansea · 25yr warranty
SolarBatteryMaintenance

MCS · NICEIC · RECC · TrustMark

AG

A1 Group Edinburgh

Verified
5.0 (61 reviews)
Est. 2004 · Edinburgh · 25yr warranty
SolarBatteryEV Charging

MCS · NICEIC

AR

ACC Renewable Energy

Verified
5.0 (112 reviews)
Est. 2020 · Liverpool · 25yr warranty
SolarBatteryEV Charging

MCS · RECC · TrustMark · OZEV

AS

ACS Solar

Verified
5.0 (10 reviews)
Est. 2008 · Norwich · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

A

Actismart

Verified
5.0 (175 reviews)
Est. 2023 · Wolverhampton · 10yr warranty
SolarBatteryEV ChargingMaintenance

MCS · RECC · TrustMark

AS

AEC Solar Division

Verified
5.0 (39 reviews)
Est. 2008 · York · 25yr warranty
SolarBatteryMaintenance

MCS · NAPIT · RECC

AE

ALPS Electrical

Verified
5.0 (375 reviews)
Est. 2022 · Newcastle · 25yr warranty
SolarBatteryEV Charging

MCS · RECC · NICEIC

AE

Alps Electrical

Verified
5.0 (250 reviews)
York · 25yr warranty
SolarBatteryMaintenance

MCS · RECC · NAPIT

AP

AR Power

Verified
5.0 (30 reviews)
Est. 2011 · Newcastle · 25yr warranty
SolarBatteryMaintenanceEnergy Audit

MCS · ISO 9001 · ISO 14001 · ISO 45001

BS

B Solar Energy

Verified
5.0 (41 reviews)
Colchester · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

BA

Baird and Brown Ltd

Verified
5.0 (70 reviews)
Maidstone · 25yr warranty
SolarBatteryEV Charging

MCS · RECC · NICEIC

B

BeeSOLAR

Verified
5.0 (10 reviews)
Belfast · 25yr warranty
SolarBatteryMaintenanceMonitoring

MCS · RECC

Aiko + SolaX

BE

Bell Electrical & Renewables

Verified
5.0 (41 reviews)
Est. 2018 · Aberdeen · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

BE

Bliss Eco Energy

Verified
5.0 (39 reviews)
Colchester · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NAPIT · HIES · TrustMark

BT

Blue Tech Electrical

Verified
5.0 (30 reviews)
Peterborough · 25yr warranty
SolarBatteryEV Charging

MCS · HIES · NAPIT

CR

Cahill Renewables

Verified
5.0 (47 reviews)
Est. 2013 · Maidstone · 25yr warranty
SolarBatteryMaintenanceEnergy Audit

MCS · HIES · TrustMark · RECC

CG

Celtic Green Energy

Verified
5.0 (15 reviews)
Est. 2013 · Swansea · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

CS

Chiltern Solar

Verified
5.0 (5 reviews)
Est. 2011 · Luton · 25yr warranty
SolarBatteryMaintenanceMonitoring

MCS · NICEIC

SolarEdge

CS

Chiltern Solar

Verified
5.0 (150 reviews)
Est. 2011 · Reading · 25yr warranty
SolarBatteryMaintenanceMonitoring

MCS · NICEIC

Various MCS-certified + SolarEdge

C

Cinergi

Verified
5.0 (107 reviews)
Bath · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · RECC

CE

Connect Electric

Verified
5.0 (30 reviews)
Est. 2009 · Manchester · 25yr warranty
SolarBatteryMaintenance

MCS · NAPIT · TrustMark

CE

Croft Electrical and Solar

Verified
5.0 (29 reviews)
Eastbourne · 25yr warranty
SolarBattery

MCS · NICEIC · RECC

DE

D Electrics

Verified
5.0 (100 reviews)
Est. 2017 · Northampton · 25yr warranty
SolarBattery

MCS · NAPIT

DO

Depth of Light

Verified
5.0 (16 reviews)
Oxford · 25yr warranty
SolarBatteryEV Charging

MCS · RECC

DR

DES Renewable Energy

Verified
5.0 (220 reviews)
Est. 2016 · Salisbury · 25yr warranty
SolarBatteryEV Charging

MCS · NAPIT · RECC

DR

DES Renewable Energy Wiltshire

Verified
5.0 (220 reviews)
Est. 2016 · Salisbury · 25yr warranty
SolarBatteryEV Charging

MCS · NAPIT

D&

Devon & Cornwall Electrical

Verified
5.0 (5 reviews)
Est. 2022 · Plymouth · 25yr warranty
SolarBattery

MCS · RECC

DR

Devon Renewables

Verified
5.0 (58 reviews)
Exeter · 25yr warranty
SolarBatteryEV ChargingMonitoring

MCS · RECC · OZEV

DS

Dorset Solar Solutions

Verified
5.0 (46 reviews)
Bournemouth · 25yr warranty
SolarBatteryMaintenance

MCS

ES

Eco Switch Improvements

Verified
5.0 (37 reviews)
Derby · 25yr warranty
SolarBattery

MCS · TrustMark · RECC

E

Ecocetera

Verified
5.0 (28 reviews)
Est. 2001 · Bristol · 25yr warranty
SolarBatteryMaintenanceMonitoring

MCS · NICEIC

Canadian Solar + Anker Solix

E

EcoFuture

Verified
5.0 (45 reviews)
Est. 2021 · Newcastle · 25yr warranty
SolarBatteryEV ChargingMonitoring

MCS · RECC · TrustMark

EE

EcoSphere Energy

Verified
5.0 (8 reviews)
Est. 2022 · Exeter · 25yr warranty
SolarBatteryMaintenance

MCS

ES

Ecostar Solar

Verified
5.0 (20 reviews)
Northampton · 25yr warranty
SolarBattery

MCS · HIES

ER

EE Renewables Oxford

Verified
5.0 (231 reviews)
Oxford · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NICEIC · RECC · TrustMark

ER

EE Renewables

Verified
5.0 (231 reviews)
Est. 2015 · Salisbury · 25yr warranty
SolarBatteryEV ChargingMonitoring

MCS · NICEIC · RECC · TrustMark

ER

EE Renewables

Verified
5.0 (125 reviews)
Est. 2015 · Cardiff · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NICEIC · NAPIT · TrustMark

EE

Eleck Energy

Verified
5.0 (25 reviews)
Est. 2023 · Liverpool · 25yr warranty
SolarBatteryEV ChargingEnergy Audit

MCS

EE

Encom Energy

Verified
5.0 (49 reviews)
Est. 2021 · Belfast · 25yr warranty
SolarBatteryMonitoring

MCS · RECC

EC

Energy Concerns

Verified
5.0 (104 reviews)
Est. 2022 · Leicester
SolarBatteryEV ChargingMaintenance

MCS · NAPIT · TrustMark

ER

Entire Renewables

Verified
5.0 (74 reviews)
Chester · 25yr warranty
SolarBatteryEV Charging

MCS · NICEIC

EL

EV-PV Ltd

Verified
5.0 (30 reviews)
Est. 2009 · Birmingham · 25yr warranty
SolarBatteryEV Charging

MCS · RECC · TrustMark

FC

First Class Solar

Verified
5.0 (15 reviews)
Belfast · 25yr warranty
SolarBatteryMaintenance

MCS · RECC

JA Solar + Growatt

GS

GE Solutions UK

Verified
5.0 (88 reviews)
Est. 2008 · Birmingham · 10yr warranty
SolarBatteryEV Charging

MCS · NICEIC · RECC · ISO 9001

GS

GE Solutions UK

Verified
5.0 (88 reviews)
Worcester · 25yr warranty
SolarBatteryEV Charging

MCS · HIES · NAPIT

G&

Generate & Store

Verified
5.0 (74 reviews)
Chelmsford · 25yr warranty
SolarBatteryMaintenance

MCS · NICEIC · RECC

G&

Generate & Store

Verified
5.0 (74 reviews)
Est. 2000 · Colchester · 25yr warranty
SolarBatteryMaintenance

MCS · NICEIC

GG

Geo Green Power

Verified
5.0 (169 reviews)
Est. 2010 · Derby · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

GG

Geo Green Power

Verified
5.0 (139 reviews)
Est. 2009 · Leicester
SolarBatteryEV ChargingMaintenance

MCS · NAPIT · TrustMark · RECC

GG

Geo Green Power

Verified
5.0 (139 reviews)
Est. 2009 · Stoke-on-Trent
SolarBatteryEV ChargingMaintenance

MCS · NAPIT · TrustMark · RECC

GG

Geo Green Power

Verified
5.0 (172 reviews)
Est. 2010 · Wolverhampton · 15yr warranty
SolarBatteryEV ChargingMaintenance

MCS

GG

Geo Green Power

Verified
5.0 (139 reviews)
Est. 2009 · Nottingham
SolarBatteryEV ChargingMaintenance

MCS · NAPIT · TrustMark · RECC

GG

Glow Green

Verified
5.0 (920 reviews)
Est. 2013 · Cardiff · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NICEIC · HIES

GG

Glow Green

Verified
5.0 (920 reviews)
Est. 2011 · Manchester · 30yr warranty
SolarBatteryEV Charging

MCS · NICEIC · HIES

JA Solar + SolarEdge

GE

Goodwin Electrical & Solar

Verified
5.0 (93 reviews)
Est. 2012 · Chester · 25yr warranty
SolarBatteryEV Charging

MCS · NICEIC · RECC · REFCOM

GE

Green Earth Sussex

Verified
5.0 (11 reviews)
Est. 2021 · Brighton
SolarBatteryEV ChargingMaintenance

MCS · Checkatrade · NAPIT

GE

Green Energy Electrical

Verified
5.0 (103 reviews)
Basildon · 25yr warranty
SolarBatteryMaintenance

MCS · HIES

GE

Green Energy Electrical

Verified
5.0 (103 reviews)
Colchester · 25yr warranty
SolarBatteryMaintenance

MCS · NICEIC · HIES

GR

Green Revolution

Verified
5.0 (16 reviews)
Est. 2023 · Northampton · 25yr warranty
SolarBatteryEV Charging

MCS · RECC

GS

Green Solar Footprint

Verified
5.0 (20 reviews)
Norwich · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NICEIC · RECC

GR

Greenlinc Renewables

Verified
5.0 (31 reviews)
Est. 2020 · Lincoln · 25yr warranty
SolarBatteryMaintenance

MCS · TrustMark

GE

GreenTech EV & Solar

Verified
5.0 (35 reviews)
Est. 2022 · Basildon · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

GR

Greentech Renewables

Verified
5.0 (112 reviews)
Est. 2020 · Liverpool · 25yr warranty
SolarBattery

MCS · NAPIT · HIES · TrustMark

GN

Grid Neutral

Verified
5.0 (45 reviews)
Est. 2019 · Sheffield · 25yr warranty
SolarBatteryMaintenance

MCS

HR

Halo Renewables

Verified
5.0 (261 reviews)
Est. 2015 · Peterborough · 25yr warranty
SolarBatteryEV Charging

MCS · HIES · NAPIT

HE

Hassie Electrical

Verified
5.0 (12 reviews)
Swansea · 25yr warranty
SolarBatteryMaintenance

MCS · NAPIT

HR

House Rescue Electrical

Verified
5.0 (200 reviews)
Est. 2020 · London
SolarBatteryEV Charging

MCS · RECC · NICEIC

IH

IMS Heat Pumps

Verified
5.0 (3 reviews)
Est. 1997 · York · 25yr warranty
SolarBatteryMaintenance

MCS · HIES

IS

In2gr8ted Solutions

Verified
5.0 (193 reviews)
Est. 2007 · Birmingham · 25yr warranty
SolarBatteryEV ChargingMonitoring

MCS · NAPIT · HIES

IH

Infinite Heating and Energy

Verified
5.0 (32 reviews)
Cambridge · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

Eurener

IE

Intellec Electrical Services

Verified
5.0 (6 reviews)
Chester · 25yr warranty
SolarBatteryEV Charging

MCS · NICEIC · TrustMark

IR

Ipsum Renewables

Verified
5.0 (142 reviews)
Est. 2017 · Derby · 25yr warranty
SolarBatteryMaintenance

MCS · RECC

JC

JCE Contracting

Verified
5.0 (2 reviews)
Est. 1999 · Bath · 25yr warranty
SolarBatteryEV Charging

MCS · NICEIC

JR

JPS Renewable Energy

Verified
5.0 (144 reviews)
Est. 2011 · Eastbourne · 25yr warranty
SolarBatteryEV Charging

MCS · RECC

JS

JTD Solar

Verified
5.0 (70 reviews)
Est. 2024 · Bristol · 25yr warranty
SolarBatteryEV Charging

MCS · NICEIC · RECC

K

Kembla

Verified
5.0 (39 reviews)
Est. 2019 · Portsmouth
SolarBatteryMaintenanceMonitoring

MCS

KS

Kimble Solar

Verified
5.0 (80 reviews)
Est. 2011 · Reading · 10yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NICEIC · RECC · ECA

LE

LA Electrical & Solar

Verified
5.0 (35 reviews)
Est. 1997 · Bristol · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NICEIC

LS

Lanman Solar

Verified
5.0 (61 reviews)
Est. 2022 · Ipswich · 25yr warranty
SolarBatteryMaintenanceMonitoring

MCS · CSCS

LG

Lincs Green Energy

Verified
5.0 (8 reviews)
Lincoln · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NICEIC

MR

Manchester Renewables

Verified
5.0 (2 reviews)
Manchester · 25yr warranty
SolarBatteryMaintenance

MCS · RECC · TrustMark

NG

Next Generation Renewable Energy

Verified
5.0 (86 reviews)
Est. 2013 · Oxford · 25yr warranty
SolarBatteryEV ChargingMonitoring

MCS · RECC

N

Net-Eco

Verified
5.0 (32 reviews)
Swindon · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NAPIT

NE

Now EV

Verified
5.0 (156 reviews)
Milton Keynes · 25yr warranty
SolarBatteryEV Charging

MCS · NAPIT · HIES · TrustMark

OS

Oxford Solar PV

Verified
5.0 (2 reviews)
Oxford · 25yr warranty
SolarBatteryMaintenance

MCS · RECC · NICEIC

SunPower + SolarEdge

PS

P4 Solar

Verified
5.0 (227 reviews)
Est. 2022 · Sheffield · 30yr warranty
SolarBatteryEV ChargingMaintenance

MCS · RECC

PR

PWS Renewables

Verified
5.0 (500 reviews)
Est. 2013 · Glasgow · 25yr warranty
SolarBatteryEV Charging

MCS · RECC · TrustMark · NAPIT

RS

Rawson Solar

Verified
5.0 (30 reviews)
Chester · 25yr warranty
SolarBatteryEV Charging

MCS

RS

Redhill Services

Verified
5.0 (28 reviews)
Est. 2005 · Norwich · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

RR

Rollings Renewables

Verified
5.0 (121 reviews)
Est. 2002 · Worcester · 25yr warranty
SolarBatteryEV Charging

MCS · TrustMark

RR

Rollings Renewables

Verified
5.0 (162 reviews)
Est. 2002 · Cheltenham · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · RECC

RR

Rollings Renewables

Verified
5.0 (162 reviews)
Est. 2002 · Wolverhampton · 10yr warranty
SolarBatteryEV ChargingMaintenance

MCS · RECC

RS

RT Solar

Verified
5.0 (56 reviews)
Est. 2021 · Milton Keynes · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NAPIT · RECC · TrustMark

RR

Rutland Renewables

Verified
5.0 (2 reviews)
Peterborough · 25yr warranty
SolarBatteryEV Charging

MCS · NAPIT · TrustMark

SS

Savent Solar

Verified
5.0 (14 reviews)
Est. 2010 · Brighton
SolarBatteryMaintenanceMonitoring

MCS · Octopus Energy Trusted Partner · TrustMark

SE

SCJ Electrical & Renewables

Verified
5.0 (79 reviews)
Est. 2018 · Newcastle · 25yr warranty
SolarBatteryMaintenanceEnergy Audit

MCS · CHAS · ISO 9001

SR

Simcott Renewables

Verified
5.0 (13 reviews)
Est. 2022 · Basildon · 25yr warranty
SolarBatteryMaintenance

MCS · NAPIT · CHAS

SS

Simple Solar

Verified
5.0 (42 reviews)
Est. 2015 · Plymouth · 25yr warranty
SolarBatteryEV Charging

MCS · NICEIC · RECC · CHAS

SB

S&J Bath Solar Energy

Verified
5.0 (1 reviews)
Bath · 25yr warranty
Solar

MCS

SG

Solar Green Solutions

Verified
5.0 (25 reviews)
Est. 2022 · Leeds · 25yr warranty
SolarBatteryEV Charging

RECC

SP

Solar Panels Essex

Verified
5.0 (250 reviews)
Basildon · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NICEIC · RECC

SS

Solar Star Power

Verified
5.0 (93 reviews)
Est. 2011 · Stoke-on-Trent
SolarBatteryEV ChargingMaintenance

MCS · NAPIT · TrustMark

SS

Solar Solutions Oxford

Verified
5.0 (3 reviews)
Oxford · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

S

SolarGain

Verified
5.0 (36 reviews)
Plymouth · 25yr warranty
SolarBatteryMaintenance

MCS · HIES · TrustMark · NAPIT

Jinko

SE

Solec Electrical Services

Verified
5.0 (40 reviews)
Est. 2022 · Newcastle · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NAPIT · HIES · TrustMark

SR

Solec Renewables

Verified
5.0 (15 reviews)
Belfast · 25yr warranty
SolarBatteryMaintenanceMonitoring

MCS

S

Sopoco

Verified
5.0 (8 reviews)
Est. 2020 · Brighton · 2yr warranty
SolarBatteryEV ChargingMaintenance

MCS · RECC · TrustMark

SE

South East Solar Cambridge

Verified
5.0 (61 reviews)
Cambridge · 25yr warranty
SolarEV ChargingMaintenance

MCS · NICEIC · NAPIT

SL

South Lincs Solar

Verified
5.0 (101 reviews)
Lincoln · 25yr warranty
SolarBatteryEV Charging

MCS

SS

South Scotland Solar

Verified
5.0 (27 reviews)
Est. 2021 · Edinburgh · 25yr warranty
SolarBattery

MCS · NAPIT · TrustMark

SS

Spectra Solar

Verified
5.0 (15 reviews)
Chester · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · HIES · NAPIT · TrustMark

SI

Square1 Installations

Verified
5.0 (107 reviews)
Est. 2021 · Norwich · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

SR

SSU Renewables

Verified
5.0 (71 reviews)
Luton · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NICEIC · RECC

SS

Stag Solar Solutions

Verified
5.0 (6 reviews)
Est. 2020 · Chelmsford · 25yr warranty
SolarBatteryMaintenance

MCS · ISO 9001 · RECC

SE

Stellar Electrical & Energy Solutions

Verified
5.0 (16 reviews)
Dundee · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · RECC · NAPIT

SS

Suffolk Solar & Electrical

Verified
5.0 (12 reviews)
Est. 2024 · Ipswich · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

SE

Story Electrical

Verified
5.0 (35 reviews)
Est. 2018 · Peterborough · 25yr warranty
SolarBatteryEV Charging

NAPIT

SE

Sunbright Energy

Verified
5.0 (153 reviews)
Est. 2014 · London
SolarBatteryEV Charging

NAPIT

Eurener + Solis

SF

Sunlight Future

Verified
5.0 (282 reviews)
Est. 2011 · Bristol · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NICEIC · RECC

SunPower + SolarEdge

SS

SunPro Solar

Verified
5.0 (8 reviews)
Est. 2023 · Norwich · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

TS

Tarven Solar Energy

Verified
5.0 (182 reviews)
Maidstone · 25yr warranty
SolarBatteryEV Charging

MCS · TrustMark

TE

Tethys Energy

Verified
5.0 (19 reviews)
Est. 2013 · Reading · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · RECC · NICEIC

REC + SolarEdge

UE

UK Eco Energy Solutions

Verified
5.0 (59 reviews)
Lincoln · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NAPIT · TrustMark · RECC

WY

West Yorkshire Electrical

Verified
5.0 (56 reviews)
Est. 2015 · Leeds · 25yr warranty
SolarBatteryEV ChargingMaintenance

NAPIT

WE

Wiltshire Energy

Verified
5.0 (2 reviews)
Est. 2016 · Swindon · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · TrustMark

WE

WH Electrical & Solar

Verified
5.0 (10 reviews)
Ipswich · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NAPIT · RECC · TrustMark

WG

Wise Green Energy

Verified
5.0 (98 reviews)
Est. 2013 · Norwich · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

AR

Adept Renewables

Verified
4.9 (6 reviews)
Est. 2010 · Bournemouth · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · HIES · NAPIT

Jinko Solar

AE

Absolute Electrical Lincoln

Verified
4.9 (22 reviews)
Lincoln · 25yr warranty
SolarBatteryEV Charging

NICEIC · MCS

AS

Ace Solar Energy

Verified
4.9 (84 reviews)
Est. 2010 · Wolverhampton · 10yr warranty
SolarBatteryEV ChargingMaintenance

MCS · Solar Trade Association

AI

Arctic Improvements

Verified
4.9 (457 reviews)
Est. 2022 · Glasgow · 25yr warranty
SolarBattery

MCS · RECC · TrustMark

BS

B Solar Energy

Verified
4.9 (41 reviews)
Basildon · 25yr warranty
SolarBatteryEV Charging

MCS · NICEIC

BE

BJC Electrical & Solar

Verified
4.9 (32 reviews)
Est. 2015 · Peterborough · 25yr warranty
SolarBatteryEV Charging

MCS

CR

Cahill Renewables

Verified
4.9 (47 reviews)
Est. 2014 · Brighton
SolarBatteryMaintenanceEnergy Audit

MCS · HIES · TrustMark · RECC

CR

Cambridge Renewables

Verified
4.9 (15 reviews)
Est. 2022 · Norwich · 25yr warranty
SolarBatteryMaintenance

MCS · RECC

CS

Cambridge Solar

Verified
4.9 (27 reviews)
Est. 2009 · Chelmsford · 25yr warranty
SolarBatteryMaintenance

MCS

CS

Contact Solar

Verified
4.9 (1120 reviews)
Est. 2014 · Leicester
SolarBatteryEV ChargingMaintenance

MCS · TrustMark · RECC · NAPIT

CS

Contact Solar

Verified
4.9 (1120 reviews)
Est. 2014 · Nottingham
SolarBatteryEV ChargingMaintenance

MCS · TrustMark · RECC · NAPIT

CS

Contact Solar

Verified
4.9 (1120 reviews)
Est. 2014 · Stoke-on-Trent
SolarBatteryEV ChargingMaintenance

MCS · TrustMark · RECC · NAPIT

DR

DES Renewables

Verified
4.9 (244 reviews)
Swindon · 25yr warranty
SolarBatteryMaintenance

MCS · NAPIT

DE

Doyle Electrical Services

Verified
4.9 (30 reviews)
Est. 1990 · Ipswich · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NICEIC · RECC

EE

E-Verve Energy

Verified
4.9 (151 reviews)
Chester · 25yr warranty
SolarBatteryEV Charging

MCS · NAPIT · RECC · OZEV

ER

EE Renewables

Verified
4.9 (218 reviews)
Est. 2015 · Portsmouth
SolarBatteryEV ChargingMaintenance

MCS · NICEIC · RECC · TrustMark

EE

EECO Energy

Verified
4.9 (103 reviews)
Belfast · 25yr warranty
SolarBatteryMaintenance

MCS

EE

Exeo Energy

Verified
4.9 (30 reviews)
Est. 2013 · Oxford · 25yr warranty
SolarBatteryEV Charging

MCS

GE

Gallagher Electrical

Verified
4.9 (40 reviews)
Est. 1990 · Birmingham · 25yr warranty
SolarBatteryEV Charging

MCS · NICEIC

GS

Generate Solar EV

Verified
4.9 (20 reviews)
Est. 2020 · Nottingham
SolarBatteryEV ChargingMaintenance

MCS · NAPIT · TrustMark

GG

Geo Green Power (Bath)

Verified
4.9 (169 reviews)
Est. 2013 · Bath · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

GG

Geo Green Power

Verified
4.9 (172 reviews)
Est. 2010 · Leeds · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

GG

Geo Green Power

Verified
4.9 (172 reviews)
Est. 2010 · Swindon · 25yr warranty
SolarBatteryMonitoringMaintenance

MCS · ISO9001

GG

Geo Green Power

Verified
4.9 (169 reviews)
Est. 2013 · York · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

GB

Green Building Renewables - Newcastle

Verified
4.9 (305 reviews)
Est. 2021 · Newcastle · 25yr warranty
SolarBattery

MCS · RECC · TrustMark · NICEIC

GE

Green Energy Solar

Verified
4.9 (122 reviews)
Est. 2014 · Swansea · 25yr warranty
SolarBatteryMaintenanceMonitoring

MCS · HIES · NAPIT

GE

Green Energy Solar

Verified
4.9 (122 reviews)
Est. 2014 · Cardiff · 25yr warranty
SolarBatteryMaintenanceMonitoring

MCS · HIES · NAPIT

GS

GreenCloud Solar

Verified
4.9 (20 reviews)
Est. 2022 · Coventry · 25yr warranty
SolarBatteryMonitoringMaintenance

RECC

GF

Greener Future Ltd

Verified
4.9 (32 reviews)
Est. 2019 · Southampton
SolarBatteryEV ChargingMaintenance

MCS

IS

Impact Services

Verified
4.9 (648 reviews)
Est. 2009 · Norwich · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

J

Jorro

Verified
4.9 (90 reviews)
Est. 2014 · Glasgow · 25yr warranty
SolarBatteryEV Charging

MCS

JB

Justin Bucknell Electrical

Verified
4.9 (237 reviews)
Oxford · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NICEIC

SolarEdge

KC

KS Connexions

Verified
4.9 (110 reviews)
Est. 2017 · Coventry · 25yr warranty
SolarBatteryEV ChargingMonitoring

MCS · NAPIT

LE

Limitless Energy

Verified
4.9 (47 reviews)
Swansea · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

SolarEdge

LE

Lincoln Electrical

Verified
4.9 (139 reviews)
Lincoln · 25yr warranty
SolarBatteryMaintenance

MCS

LR

Lincs Renewables

Verified
4.9 (10 reviews)
Lincoln · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NICEIC · RECC

LS

LJM Solutions

Verified
4.9 (15 reviews)
Est. 2023 · Derby · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · TrustMark · RECC

LS

LJM Solutions

Verified
4.9 (15 reviews)
Est. 2023 · Nottingham
SolarBatteryEV ChargingMaintenance

MCS · TrustMark · RECC

MS

Mr Solar PV

Verified
4.9 (69 reviews)
Est. 2022 · Norwich · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

NE

Needham Electrical Ltd

Verified
4.9 (15 reviews)
Ipswich · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NICEIC · RECC

OE

OHM Energy

Verified
4.9 (573 reviews)
Est. 2009 · Brighton
SolarBatteryMaintenanceMonitoring

MCS · RECC · TrustMark

PE

Potentia Engineering

Verified
4.9 (15 reviews)
Gloucester · 25yr warranty
SolarBatteryEV Charging

MCS

PT

Prime Time Solar

Verified
4.9 (3484 reviews)
Chelmsford · 25yr warranty
SolarBatteryMaintenance

MCS · Gas Safe

RN

Refresh NI

Verified
4.9 (136 reviews)
Belfast · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

RS

Renegade Solar

Verified
4.9 (80 reviews)
Est. 2022 · Manchester · 25yr warranty
SolarBatteryEV Charging

MCS · TrustMark · NAPIT

DMEGC

RE

Resistance Electrical

Verified
4.9 (254 reviews)
Est. 2014 · Brighton
SolarBatteryEV ChargingMaintenance

NAPIT · MCS · TrustMark · Checkatrade

RG

RM Green Energy

Verified
4.9 (35 reviews)
Plymouth · 25yr warranty
SolarBattery

RECC

SE

Save Energy UK

Verified
4.9 (500 reviews)
Est. 2005 · Southampton
SolarBatteryMaintenanceEnergy Audit

MCS · NAPIT · RECC · CHAS

SR

Sheffield Renewable Services

Verified
4.9 (38 reviews)
Est. 2023 · Sheffield · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NAPIT · TrustMark · RECC

S

Solar-Rise

Verified
4.9 (224 reviews)
Est. 2011 · Brighton
SolarMaintenanceMonitoring

MCS · NAPIT · RECC

S

Solar4Good

Verified
4.9 (670 reviews)
Est. 2020 · London · 25yr warranty
SolarBatteryEV ChargingEnergy Audit

MCS

Canadian Solar + Enphase

SV

Solar Voltaics

Verified
4.9 (52 reviews)
Est. 2010 · Southampton
SolarBatteryEV ChargingMaintenance

MCS

SN

Solarfix NI Ltd

Verified
4.9 (260 reviews)
Est. 2015 · Belfast · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · RECC · ISO 9001 · ISO 14001

Trina Solar + SolarEdge

SU

SolarTherm UK

Verified
4.9 (493 reviews)
Basildon · 25yr warranty
SolarBatteryMaintenance

MCS · HIES · EPVS

SG

Solum GB

Verified
4.9 (56 reviews)
Est. 2007 · Bournemouth · 30yr warranty
SolarBatteryEV ChargingMaintenance

MCS

Perlight Delta

SE

Spirit Energy

Verified
4.9 (90 reviews)
Est. 2010 · Reading · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NICEIC · CHAS

Aiko + Enphase

SE

Sustainable Energy Engineering

Verified
4.9 (300 reviews)
Est. 2006 · Newcastle · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · RECC · TrustMark · Which? Trusted Traders

SE

SWH Electrical Solutions

Verified
4.9 (50 reviews)
Est. 2015 · Newcastle · 25yr warranty
SolarBatteryEV ChargingEnergy Audit

MCS · TrustMark · NICEIC · HIES

TE

The Edinburgh Boiler Company

Verified
4.9 (2247 reviews)
Est. 2015 · Edinburgh · 25yr warranty
SolarBattery

MCS

TG

The Glasgow Boiler Company

Verified
4.9 (2200 reviews)
Est. 2018 · Glasgow · 10yr warranty
SolarBatteryMaintenance

MCS · NICEIC · RECC · Gas Safe

TL

The Little Green Energy Company

Verified
4.9 (250 reviews)
Est. 2010 · Brighton
SolarBatteryEV ChargingMaintenance

MCS · Which? Trusted Trader · Checkatrade · Tesla Certified

TS

The Solar Co.

Verified
4.9 (92 reviews)
Est. 2020 · London · 25yr warranty
SolarBatteryEV Charging

MCS

Canadian Solar + SolarEdge

TL

The Little Green Energy Company

Verified
4.9 (250 reviews)
Est. 2010 · Maidstone · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · Which? Trusted Trader · Checkatrade · Tesla Certified

SunPower

TH

TLC Home Group

Verified
4.9 (50 reviews)
Est. 2015 · Colchester · 25yr warranty
SolarBatteryMaintenance

MCS

UA

UK Alternative Energy

Verified
4.9 (80 reviews)
Est. 2009 · Lincoln · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

US

UPS Solar

Verified
4.9 (439 reviews)
Est. 2015 · Cardiff · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · RECC

WE

Wing Energy

Verified
4.9 (15 reviews)
Est. 1999 · Nottingham
SolarBatteryEV ChargingMaintenance

MCS · RECC · NAPIT · Octopus Energy Trusted Partner

AT

AJ Taylor Electrical Contractors

Verified
4.8 (119 reviews)
Est. 1983 · Brighton
SolarBatteryEV ChargingMaintenance

MCS · NICEIC · Tesla Certified

AH

Alba Heat and Power

Verified
4.8 (30 reviews)
Est. 2010 · Edinburgh · 25yr warranty
SolarBattery

MCS · RECC · TrustMark

CC

Capital City Electrical Services

Verified
4.8 (25 reviews)
Est. 2008 · Edinburgh · 25yr warranty
SolarBatteryEV Charging

MCS · NICEIC · Which? Trusted Traders

C

Cinergi

Verified
4.8 (107 reviews)
Est. 2020 · Southampton
SolarBatteryEV ChargingMaintenance

MCS

CW

CM Ward Ltd

Verified
4.8 (30 reviews)
Est. 2015 · Nottingham
SolarBatteryEV ChargingMaintenance

MCS · RECC · NAPIT · TrustMark

CS

Contact Solar

Verified
4.8 (1120 reviews)
Est. 2012 · Coventry · 25yr warranty
SolarBatteryMonitoringMaintenance

MCS · HIES · Which? Trusted Trader

C

Core7

Verified
4.8 (66 reviews)
Swindon · 25yr warranty
SolarBatteryEV Charging

MCS · NICEIC · RECC

CD

CRG Direct

Verified
4.8 (77 reviews)
Est. 2017 · Southampton
SolarBatteryMaintenance

MCS · NICEIC · TrustMark

DR

DES Renewable Energy

Verified
4.8 (220 reviews)
Est. 2016 · Southampton
SolarBatteryEV ChargingMaintenance

MCS · NAPIT · RECC

EE

E-Verve Energy

Verified
4.8 (64 reviews)
Est. 2018 · Liverpool · 25yr warranty
SolarBatteryEV Charging

MCS · NAPIT · RECC · OZEV

EW

Eco Warrior Solar

Verified
4.8 (24 reviews)
Est. 2025 · Liverpool · 25yr warranty
SolarBattery

MCS

ER

Ecowise Renewables

Verified
4.8 (81 reviews)
Colchester · 25yr warranty
SolarBatteryMaintenance

MCS · NICEIC · HIES · TrustMark

EP

Edan Power

Verified
4.8 (28 reviews)
Est. 2010 · Birmingham · 25yr warranty
SolarBatteryMaintenanceEnergy Audit

MCS · NICEIC · HIES

EU

ElectroPoint UK

Verified
4.8 (53 reviews)
Est. 2021 · Glasgow · 25yr warranty
SolarBatteryEV Charging

MCS · TrustMark

ES

Elektra Smart Energy

Verified
4.8 (30 reviews)
Est. 2023 · Coventry · 25yr warranty
SolarBatteryEV ChargingEnergy Audit

MCS · NAPIT · TrustMark

EL

EVR Ltd

Verified
4.8 (58 reviews)
Est. 2008 · Southampton
SolarBatteryEV ChargingMaintenance

MCS · RECC

FI

Feed it Green

Verified
4.8 (52 reviews)
Est. 2011 · Liverpool · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · OLEV · WPS · CHAS

GS

GHE Solar

Verified
4.8 (88 reviews)
Est. 2009 · Salisbury · 25yr warranty
SolarBatteryEV Charging

MCS

GG

Glow Green

Verified
4.8 (2355 reviews)
Chelmsford · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · TrustMark

GG

Glow Green Oxford

Verified
4.8 (917 reviews)
Oxford · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · TrustMark

GG

Going Green Renewables

Verified
4.8 (25 reviews)
Est. 2020 · Portsmouth
SolarBatteryEV ChargingMaintenance

MCS · GivEnergy Advanced Installer · TrustMark

GF

Green Flare

Verified
4.8 (87 reviews)
Est. 2009 · Bristol · 25yr warranty
SolarBatteryMaintenance

MCS · NICEIC · RECC

GR

Greenstorm Renewables

Verified
4.8 (150 reviews)
Est. 2020 · Birmingham · 25yr warranty
SolarBattery

MCS · RECC · TrustMark

HE

HC Electrical Yorkshire

Verified
4.8 (32 reviews)
Est. 2021 · Leeds · 25yr warranty
SolarBatteryEV Charging

MCS

IE

Ideal Electrical Solutions

Verified
4.8 (36 reviews)
Est. 2013 · Edinburgh · 25yr warranty
SolarBatteryEV Charging

MCS · NAPIT · RECC · TrustMark

MG

My Green Electricity

Verified
4.8 (45 reviews)
Est. 2021 · Leeds · 25yr warranty
SolarBatteryEV Charging

MCS · NAPIT · RECC · Trading Standards

NS

NJR Solar

Verified
4.8 (15 reviews)
Est. 2017 · Leicester
SolarBatteryEV ChargingMaintenance

MCS · NAPIT · TrustMark

NE

North East Solar

Verified
4.8 (20 reviews)
Est. 2022 · Newcastle · 25yr warranty
SolarBatteryEV Charging

MCS · HIES · Which? Trusted Traders

NE

NXTGEN Energy

Verified
4.8 (47 reviews)
Ipswich · 25yr warranty
SolarBatteryMaintenance

MCS · HIES · NAPIT · TrustMark

PE

Pearl Energy

Verified
4.8 (15 reviews)
Lincoln · 25yr warranty
SolarBatteryEV Charging

MCS · NAPIT · RECC

PS

Perfect Sense Energy

Verified
4.8 (35 reviews)
Est. 2010 · Sheffield · 25yr warranty
SolarBatteryEnergy AuditMonitoring

MCS · Carbon Trust

PE

Prometheus Electrical & Solar

Verified
4.8 (5 reviews)
Swansea · 25yr warranty
SolarBatteryMaintenance

MCS · NICEIC

RG

R.B. Grant Electrical Contractors

Verified
4.8 (50 reviews)
Est. 1974 · Edinburgh · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · RECC

RR

Redwood Renewables

Verified
4.8 (30 reviews)
Est. 2023 · Chelmsford · 25yr warranty
SolarBatteryMaintenance

MCS · NAPIT · RECC · HIES

RR

Redwood Renewables

Verified
4.8 (43 reviews)
Est. 2023 · Ipswich · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NAPIT

RS

Renew-Able Solutions

Verified
4.8 (52 reviews)
Est. 2018 · Edinburgh · 25yr warranty
SolarBatteryMaintenance

MCS · RECC · TrustMark

SI

Send It Solar

Verified
4.8 (21 reviews)
Est. 2021 · Portsmouth
SolarBatteryEV ChargingMaintenance

MCS · TrustMark · NAPIT

SE

SiWeCo Energy

Verified
4.8 (59 reviews)
Swansea · 25yr warranty
SolarBatteryMaintenance

MCS · NICEIC · RECC

SU

Sola UK

Verified
4.8 (45 reviews)
London · 25yr warranty
SolarBatteryEV Charging

MCS · TrustMark

SS

Solar Simplicity

Verified
4.8 (42 reviews)
Est. 2021 · Basildon · 25yr warranty
SolarBatteryMaintenance

MCS · NAPIT · HIES

S(

Solar4Good (Northampton)

Verified
4.8 (550 reviews)
Est. 2020 · Northampton · 25yr warranty
SolarBatteryEV Charging

MCS · NAPIT · HIES · TrustMark

ST

Solar Tops

Verified
4.8 (25 reviews)
Est. 2023 · Coventry · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

SE

South East Solar & Electrical

Verified
4.8 (70 reviews)
Est. 2014 · London
SolarBatteryEV ChargingMaintenance

MCS · NAPIT · NICEIC

SE

SPJ Electrical

Verified
4.8 (20 reviews)
Est. 2016 · Reading · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NAPIT · HIES · TrustMark

Various MCS-certified + SolarEdge

SS

Staffs Smart Energy

Verified
4.8 (15 reviews)
Est. 2022 · Stoke-on-Trent
SolarBatteryEV ChargingMaintenance

MCS · TrustMark · NAPIT

SG

Sunlite Group

Verified
4.8 (60 reviews)
Est. 2018 · Ipswich · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · OZEV

TR

Team Renewables

Verified
4.8 (20 reviews)
Est. 2019 · Leeds · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NICEIC · RECC

TE

TEC Electrical & Solar

Verified
4.8 (45 reviews)
Est. 2004 · Brighton
SolarBatteryEV ChargingMaintenance

NAPIT · City & Guilds · TrustMark

TE

TechFix Electric

Verified
4.8 (45 reviews)
Est. 2009 · Birmingham · 25yr warranty
SolarBatteryEV Charging

MCS · NAPIT

TE

The Energy Box

Verified
4.8 (25 reviews)
Est. 2010 · Stoke-on-Trent
SolarBatteryEV ChargingMaintenance

MCS · TrustMark · NAPIT

US

UPS Solar

Verified
4.8 (407 reviews)
Est. 2019 · Bath · 25yr warranty
SolarBatteryMaintenance

MCS · RECC · TrustMark

US

UPS Solar

Verified
4.8 (439 reviews)
Est. 2022 · Dundee · 25yr warranty
SolarBatteryMonitoring

MCS · RECC

US

Urban Solar

Verified
4.8 (15 reviews)
Est. 2011 · Cardiff · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

US

UPS Solar

Verified
4.8 (459 reviews)
Chester · 25yr warranty
SolarBatteryEV Charging

MCS

VE

Volt Energy Southern

Verified
4.8 (15 reviews)
Est. 2022 · Portsmouth
SolarBatteryEV ChargingMaintenance

MCS · TrustMark · NAPIT · HIES

WL

Wayne Lawrence Electrical Contractors

Verified
4.8 (28 reviews)
Est. 1992 · Derby · 25yr warranty
SolarBattery

MCS · TrustMark

BE

Bright Electrical Engineering

Verified
4.7 (20 reviews)
Est. 2004 · Leicester
SolarBatteryEV ChargingMaintenance

MCS · NAPIT · RECC · TrustMark

BS

Bright Spark Energy

Verified
4.7 (30 reviews)
Est. 2019 · Portsmouth
SolarBatteryEV ChargingMonitoring

MCS · NAPIT · TrustMark

BR

Brookfield Renewable Energies Leeds

Verified
4.7 (30 reviews)
Est. 2016 · Leeds · 25yr warranty
SolarBatteryMaintenanceMonitoring

MCS · NICEIC · HIES

BR

Brookfield Renewable Energies

Verified
4.7 (30 reviews)
Est. 2016 · Sheffield · 25yr warranty
SolarBatteryMaintenanceMonitoring

MCS · NICEIC · HIES

EP

Edan Power

Verified
4.7 (22 reviews)
Est. 2012 · Leicester
SolarBatteryEV ChargingMaintenance

MCS · NAPIT · TrustMark

ES

ESE Solar

Verified
4.7 (2800 reviews)
Exeter · 25yr warranty
SolarBatteryMaintenanceMonitoring

MCS

ES

ESE Solar

Verified
4.7 (2800 reviews)
Est. 2017 · Stoke-on-Trent
SolarBatteryEV ChargingMaintenance

MCS · NAPIT · TrustMark · RECC

ES

ESE Solar

Verified
4.7 (2800 reviews)
Est. 2015 · York · 25yr warranty
SolarBatteryMaintenance

MCS

GG

Geo Green Power

Verified
4.7 (172 reviews)
Ipswich · 25yr warranty
SolarBatteryMaintenanceMonitoring

MCS · NICEIC · CHAS · RECC

GG

Glow Green

Verified
4.7 (9000 reviews)
Est. 2011 · Stoke-on-Trent
SolarBatteryEV ChargingMaintenance

MCS · NAPIT · TrustMark · RECC

GS

GLSR Solutions

Verified
4.7 (25 reviews)
Est. 1998 · Stoke-on-Trent
SolarBatteryEV ChargingMaintenance

MCS · TrustMark

GS

GLSR Solutions

Verified
4.7 (25 reviews)
Est. 1998 · Nottingham
SolarBatteryEV ChargingMaintenance

MCS · TrustMark

GS

Greenshop Solar

Verified
4.7 (23 reviews)
Est. 1994 · Gloucester · 25yr warranty
SolarBatteryMaintenance

MCS

HR

Home Renewables Scotland

Verified
4.7 (48 reviews)
Est. 2013 · Glasgow · 25yr warranty
SolarBattery

MCS

IS

Insolation Solar

Verified
4.7 (20 reviews)
Est. 2020 · Stoke-on-Trent
SolarBatteryMaintenanceMonitoring

MCS · NAPIT · TrustMark

KE

Kennett Electrics

Verified
4.7 (15 reviews)
Est. 2018 · Reading · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NAPIT · RECC · TrustMark

Various MCS-certified + Various

NS

Naked Solar

Verified
4.7 (34 reviews)
Est. 2010 · Bristol · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · RECC · NICEIC

SunPower + SolaX

OS

Orange Solar Systems

Verified
4.7 (56 reviews)
Est. 2010 · Southampton
SolarBatteryMaintenance

MCS · NAPIT

PR

Premier Roofing Solutions

Verified
4.7 (52 reviews)
Est. 2019 · Nottingham
SolarBatteryMaintenance

NFRC · TrustMark

PS

Project Solar UK

Verified
4.7 (5300 reviews)
Est. 2011 · Derby · 25yr warranty
SolarBattery

MCS

SunPower

PS

Project Solar UK

Verified
4.7 (5300 reviews)
Est. 2011 · Manchester · 25yr warranty
SolarBatteryEV Charging

MCS · NAPIT · HIES · TrustMark

RS

Renergy Solutions

Verified
4.7 (27 reviews)
Est. 2012 · Leicester
SolarBatteryEV ChargingMaintenance

MCS · RECC · NAPIT

RM

R&B Mechanical & Electrical

Verified
4.7 (28 reviews)
Est. 2015 · Leeds · 25yr warranty
SolarBatteryMaintenanceMonitoring

MCS · RECC · NICEIC

SD

Senergy Direct

Verified
4.7 (27 reviews)
Est. 2014 · Basildon · 25yr warranty
SolarBatteryMaintenance

MCS · Tesla Certified

S

Sunsave

Verified
4.7 (200 reviews)
Est. 2020 · Portsmouth
SolarBatteryMonitoringMaintenance

MCS · Flexi-Orb · HIES · EPVS

UT

Use the Sun Ltd

Verified
4.7 (143 reviews)
Est. 2009 · Basildon · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

WS

Westinghouse Solar

Verified
4.7 (25 reviews)
Est. 2012 · Birmingham · 25yr warranty
SolarBatteryEV Charging

NICEIC · City & Guilds

AS

All Seasons Energy

Verified
4.6 (750 reviews)
Est. 2017 · Sheffield · 25yr warranty
SolarBatteryEV ChargingEnergy Audit

MCS · NAPIT · TrustMark · NICEIC

BE

BlueBuild Energy

Verified
4.6 (156 reviews)
Est. 2011 · Belfast · 25yr warranty
SolarBatteryMaintenance

MCS · RECC · ISO 9001 · ISO 14001

BR

Brookfield Renewable Energies

Verified
4.6 (30 reviews)
Est. 2016 · Lincoln · 25yr warranty
SolarBatteryMaintenance

MCS · NICEIC · HIES

CS

Cambridge Solar

Verified
4.6 (5 reviews)
Est. 2009 · Peterborough · 25yr warranty
SolarBatteryEV Charging

MCS

CS

Cymru Solar

Verified
4.6 (27 reviews)
Est. 2015 · Cardiff · 25yr warranty
SolarBatteryMaintenanceMonitoring

MCS · NICEIC

E

Eco-ESS

Verified
4.6 (50 reviews)
Est. 2020 · Leicester
SolarBatteryEV ChargingMaintenance

MCS · TrustMark · NAPIT

E

Eco-ESS

Verified
4.6 (50 reviews)
Est. 2020 · Nottingham
SolarBatteryEV ChargingMaintenance

MCS · TrustMark · NAPIT

E

Eco-ESS

Verified
4.6 (50 reviews)
Est. 2020 · Stoke-on-Trent
SolarBatteryEV ChargingMaintenance

MCS · TrustMark · NAPIT

ES

Ecostar Solar

Verified
4.6 (20 reviews)
Est. 2022 · Leicester
SolarBatteryMaintenanceMonitoring

MCS · HIES

EG

Energy Gain UK

Verified
4.6 (50 reviews)
Est. 2008 · Manchester · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · RECC · NICEIC

FP

Future Power Team

Verified
4.6 (34 reviews)
Est. 2019 · Leeds · 25yr warranty
SolarBatteryEV Charging

MCS · NAPIT · RECC

GE

Greener Energy Group

Verified
4.6 (1725 reviews)
Est. 2017 · Glasgow · 25yr warranty
SolarBatteryEV Charging

MCS · RECC

LI

Logan Installations

Verified
4.6 (43 reviews)
Est. 2016 · Glasgow · 25yr warranty
SolarBattery

MCS · NICEIC · RECC

NS

Northern Solar

Verified
4.6 (28 reviews)
Est. 2006 · Liverpool · 25yr warranty
SolarBatteryMaintenance

MCS

NR

Nova Renewables

Verified
4.6 (9 reviews)
Est. 2011 · Eastbourne · 25yr warranty
SolarBattery

MCS · NICEIC

SH

SGS Heating and Electrical

Verified
4.6 (418 reviews)
Salisbury · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · WHICH? Trusted Trader

S

SolarPowerful

Verified
4.6 (18 reviews)
Est. 2010 · Portsmouth
SolarBatteryEV ChargingMaintenance

MCS · NICEIC · RECC · NAPIT

SE

Solec Energy Solutions

Verified
4.6 (85 reviews)
Est. 2010 · Leeds · 25yr warranty
SolarBatteryEV ChargingMaintenance

NAPIT · TrustMark · REAL

SS

SunGift Solar

Verified
4.6 (81 reviews)
Est. 2005 · Exeter · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NICEIC · TrustMark

BR

Brookfield Renewable Energies

Verified
4.5 (20 reviews)
Est. 2016 · Nottingham
SolarBatteryEV ChargingMaintenance

MCS · NAPIT · TrustMark

BR

Brookfield Renewable Energies

Verified
4.5 (30 reviews)
York · 25yr warranty
SolarBatteryMaintenance

MCS · NICEIC · HIES

Hyundai

CE

Cotswold Energy Group

Verified
4.5 (42 reviews)
Est. 2018 · Cheltenham · 25yr warranty
SolarBatteryEnergy AuditMaintenance

MCS

E

Eco2Solar

Verified
4.5 (30 reviews)
Est. 2007 · Worcester · 25yr warranty
SolarBatteryMaintenanceEnergy Audit

MCS · NICEIC · ISO 9001

E

Eco2Solar

Verified
4.5 (30 reviews)
Est. 2007 · Birmingham · 25yr warranty
SolarBatteryMaintenanceEnergy Audit

MCS · NICEIC · ISO 9001

E

EcoSheffield

Verified
4.5 (30 reviews)
Est. 2025 · Sheffield · 25yr warranty
SolarBatteryEV Charging

MCS · NAPIT · RECC

FG

Forever Green Energy

Verified
4.5 (20 reviews)
Est. 2012 · Cheltenham · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · RECC

SunPower + SolarEdge

GL

Gechnology Limited

Verified
4.5 (32 reviews)
Est. 2015 · Luton · 25yr warranty
SolarBatteryMaintenanceMonitoring

MCS · NAPIT · RECC · TrustMark

JA Solar + SolarEdge

GG

Glow Green

Verified
4.5 (9000 reviews)
Est. 2011 · Bath · 25yr warranty
SolarBatteryMaintenance

MCS

GG

Glow Green

Verified
4.5 (14077 reviews)
Est. 2011 · Newcastle · 25yr warranty
SolarBatteryEV Charging

MCS · RECC · NICEIC

H

Heatforce

Verified
4.5 (786 reviews)
Est. 1981 · Cardiff · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

IE

Infinity Energy Services

Verified
4.5 (181 reviews)
Est. 2011 · Southampton
SolarBatteryEV ChargingMaintenance

MCS · RECC · TrustMark

MS

Mack Solar

Verified
4.5 (26 reviews)
Est. 2020 · Sheffield · 25yr warranty
SolarBatteryMaintenance

MCS · NAPIT · TrustMark · RECC

TN

The Natural Energy Company

Verified
4.5 (41 reviews)
Est. 2006 · Dundee · 25yr warranty
SolarBatteryEnergy Audit

MCS

OS

Orbit Solar

Verified
4.5 (15 reviews)
Est. 2004 · Stoke-on-Trent
SolarBatteryMaintenanceMonitoring

MCS · NAPIT

PE

Photon Energy

Verified
4.5 (25 reviews)
Est. 2006 · Reading · 25yr warranty
SolarBatteryMaintenanceMonitoring

MCS · NICEIC · RECC · CHAS

Various commercial-grade + Various commercial-grade

RB

Run By The Sun

Verified
4.5 (15 reviews)
Est. 2007 · Leicester
SolarBatteryMaintenanceMonitoring

MCS

SD

Senergy Direct

Verified
4.5 (93 reviews)
Est. 2014 · Chelmsford · 25yr warranty
SolarBatteryMaintenance

MCS · Tesla Certified

SS

Solar Sun & Air

Verified
4.5 (30 reviews)
Est. 2013 · Bristol · 25yr warranty
SolarBattery

MCS

SU

SolarTherm UK

Verified
4.5 (96 reviews)
Est. 2010 · Colchester · 25yr warranty
SolarBatteryMaintenance

MCS · HIES · TrustMark · CHAS

SE

Solarus Energy

Verified
4.5 (16 reviews)
Est. 2017 · Manchester · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NAPIT · TrustMark · NICEIC

SE

Soly Energy

Verified
4.5 (981 reviews)
Est. 2018 · Bath · 25yr warranty
SolarBatteryMaintenance

MCS · HIES · TrustMark

SR

Solent Renewables

Verified
4.5 (15 reviews)
Est. 2022 · Portsmouth
SolarBatteryEV ChargingMaintenance

MCS · NAPIT · Checkatrade

SE

Source Energy Solutions

Verified
4.5 (22 reviews)
Est. 2021 · Sheffield · 25yr warranty
SolarBatteryEV Charging

MCS · RECC · Trading Standards

SE

Suntec Energy

Verified
4.5 (15 reviews)
Est. 2024 · Birmingham · 25yr warranty
SolarBatteryEV Charging

MCS · RECC · TrustMark · Gas Safe

S

Swifftex

Verified
4.5 (42 reviews)
Est. 2019 · Glasgow · 25yr warranty
SolarBatteryEV Charging

MCS · NICEIC · RECC

SP

Synergy Power Ltd

Verified
4.5 (34 reviews)
Est. 2012 · Coventry · 25yr warranty
SolarBatteryMonitoring

MCS

TR

Trust Renewables

Verified
4.5 (16 reviews)
Est. 2015 · Manchester · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · RECC

JR

JAL Roofing & Solar

Verified
4.4 (14 reviews)
Derby · 25yr warranty
Solar

MCS · TrustMark

S

Solarsense

Verified
4.4 (21 reviews)
Est. 1995 · Bristol · 25yr warranty
SolarBatteryMaintenance

MCS

CR

Cahill Renewables Cambridge

Verified
4.3 (50 reviews)
Est. 2013 · Cambridge · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · TrustMark · HIES · NICEIC

CS

CTE Services

Verified
4.3 (9 reviews)
Peterborough · 25yr warranty
SolarBatteryEV ChargingEnergy Audit

MCS · NICEIC

DS

Deege Solar

Verified
4.3 (193 reviews)
Est. 2017 · Chelmsford · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · EPVS · NICEIC · TrustMark

EE

Eco Energy Ltd

Verified
4.3 (286 reviews)
Est. 2019 · Edinburgh · 25yr warranty
SolarBatteryMaintenance

MCS · RECC

GB

Green Building Renewables Colchester

Verified
4.3 (305 reviews)
Est. 2009 · Colchester · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NICEIC · RECC

HE

Homeco Energy

Verified
4.3 (31 reviews)
Est. 2008 · Sheffield · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · RECC

SunPower + SolarEdge

RE

Roxon Electrical

Verified
4.3 (25 reviews)
Gloucester · 25yr warranty
SolarBatteryMaintenance

MCS · NICEIC · REAL

SE

Scottish Energy Saving

Verified
4.3 (20 reviews)
Aberdeen · 25yr warranty
SolarBatteryMaintenance

MCS

V

Vision2030

Verified
4.3 (40 reviews)
Bristol · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

EE

Eco Energy Ltd

Verified
4.2 (286 reviews)
Est. 2019 · Glasgow · 25yr warranty
SolarBatteryMaintenance

MCS · TrustMark

GG

Glow Green

Verified
4.2 (2355 reviews)
Est. 2013 · Salisbury · 25yr warranty
SolarBattery

MCS · NICEIC · HIES · TrustMark

MC

MK City Plumbing & Heating

Verified
4.2 (75 reviews)
Milton Keynes · 25yr warranty
SolarBattery

MCS

R&

Rural & Country Energy

Verified
4.2 (63 reviews)
Chester · 25yr warranty
SolarBatteryEnergy Audit

MCS

SE

Samso Energy

Verified
4.2 (27 reviews)
Est. 2022 · Coventry · 25yr warranty
SolarBatteryEV ChargingEnergy Audit

MCS · Solar Energy UK

GG

Glow Green

Verified
4.1 (14115 reviews)
Est. 2011 · Coventry · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NICEIC · HIES

2D

21 Degrees (York)

Verified
4.0 (305 reviews)
Est. 2003 · York · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · RECC · NICEIC · TrustMark

AS

AES Solar

Verified
4.0 (21 reviews)
Est. 1979 · Edinburgh · 25yr warranty
SolarBatteryMaintenance

MCS · RECC · Queen's Award for Enterprise

AE

Applegarth Engineering

Verified
4.0 (17 reviews)
Est. 2010 · Liverpool · 25yr warranty
SolarBatteryEV Charging

MCS

AR

Atlantic Renewables

Verified
4.0 (28 reviews)
Est. 2011 · Manchester · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

CZ

Carbon Zero Renewables

Verified
4.0 (65 reviews)
Est. 2009 · Liverpool · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · RECC · TrustMark · NAPIT

CE

Carter Electrical Installation

Verified
4.0 (12 reviews)
Est. 2008 · Reading · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NICEIC

Various MCS-certified + SolarEdge

CG

Celtic Green Energy

Verified
4.0 (26 reviews)
Est. 2013 · Cardiff · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

CE

Conscious Energy

Verified
4.0 (28 reviews)
Est. 2019 · Liverpool · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · HIES · TrustMark

CH

Cozy Home Solutions

Verified
4.0 (70 reviews)
Est. 2019 · Oxford · 20yr warranty
SolarBatteryEnergy Audit

MCS · TrustMark

EN

Eco NRG Ltd

Verified
4.0 (33 reviews)
Est. 2010 · Plymouth · 25yr warranty
SolarBatteryEV Charging

MCS

SunPower

ER

Ecowise Renewables

Verified
4.0 (81 reviews)
Est. 2005 · Chelmsford · 25yr warranty
SolarBatteryMaintenance

MCS · NICEIC · HIES · TrustMark

ES

Evergen Solar

Verified
4.0 (1349 reviews)
Est. 2010 · Reading · 25yr warranty
SolarBatteryMonitoringMaintenance

MCS · HIES · EPVS

Various MCS-certified + Various

EP

Evergreen Power UK

Verified
4.0 (654 reviews)
Est. 2013 · London
SolarBattery

MCS · NAPIT · HIES · TrustMark

FE

Fresh Electrical Solar

Verified
4.0 (549 reviews)
Est. 2016 · Basildon · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · RECC

QCells

GB

Green Building Renewables (Daventry)

Verified
4.0 (305 reviews)
Est. 2016 · Northampton · 25yr warranty
SolarBatteryEV Charging

MCS · RECC · NICEIC · TrustMark

GB

Green Building Renewables

Verified
4.0 (305 reviews)
Est. 2016 · Portsmouth
SolarBatteryEV ChargingMaintenance

MCS · NAPIT · TrustMark · RECC

GH

Green Home Energy Solutions

Verified
4.0 (45 reviews)
Est. 2008 · Norwich · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

GH

Green Home Systems

Verified
4.0 (345 reviews)
Est. 2014 · Dundee · 25yr warranty
SolarBatteryEV ChargingEnergy Audit

MCS · ISO 9001 · ISO 14001 · TrustMark

GE

Greenscape Energy

Verified
4.0 (204 reviews)
Est. 2012 · Ipswich · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · RECC

Viridian Solar

H

Heatforce

Verified
4.0 (786 reviews)
Est. 1984 · Coventry · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NICEIC · TrustMark

HE

Helios Electrical & Solar

Verified
4.0 (22 reviews)
Milton Keynes · 25yr warranty
SolarBattery

MCS · TrustMark

I

InspireGreen

Verified
4.0 (29 reviews)
Est. 2022 · Cardiff · 25yr warranty
SolarBatteryEV ChargingEnergy Audit

MCS · NAPIT · TrustMark

JS

Joju Solar Oxford

Verified
4.0 (59 reviews)
Est. 2006 · Oxford · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · RECC · NICEIC

Aiko + SolarEdge

JS

Joju Solar

Verified
4.0 (60 reviews)
Est. 2006 · London · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · RECC · NICEIC

SunPower + SolarEdge

MR

MJ Renewables

Verified
4.0 (37 reviews)
Est. 2009 · Luton · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NAPIT · RECC · TrustMark

NS

Naked Solar Exeter

Verified
4.0 (34 reviews)
Est. 2010 · Exeter · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · RECC · NICEIC · B Corp

SunPower + SolarEdge

SF

Solar Fast (Wickes Solar)

Verified
4.0 (2304 reviews)
Est. 2007 · Coventry · 25yr warranty
SolarBatteryEV ChargingMonitoring

MCS · NAPIT · TrustMark · HIES

SS

Spectra Solar

Verified
4.0 (15 reviews)
Est. 2014 · Manchester · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · HIES · NAPIT · TrustMark

SE

Scottish Energy Efficiency

Verified
3.7 (1 reviews)
Dundee · 25yr warranty
SolarBatteryMonitoring

MCS

RR

Redwood Renewables

Verified
3.5 (6 reviews)
Luton · 25yr warranty
SolarBattery

MCS · TrustMark · HIES

RR

Redwood Renewables

Verified
3.5 (6 reviews)
Northampton · 25yr warranty
SolarBatteryEV Charging

MCS · HIES

RR

Redwood Renewables (Peterborough)

Verified
3.5 (6 reviews)
Peterborough · 25yr warranty
SolarBatteryEV Charging

MCS · HIES

2S

2020 Solar PV

Verified
0.0 (0 reviews)
Est. 2010 · Worcester · 25yr warranty
SolarBattery

MCS · RECC

3N

3S Northampton Ltd

Verified
0.0 (0 reviews)
Northampton · 25yr warranty
SolarMaintenance

MCS

AS

Aberdeen Solar

Verified
0.0 (0 reviews)
Aberdeen · 25yr warranty
SolarMaintenance

MCS · NICEIC

3E

365 Energy Ltd

Verified
0.0 (38 reviews)
Exeter · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · TrustATrader

A

Absolar

Verified
0.0 (0 reviews)
Est. 2018 · Bournemouth · 25yr warranty
SolarMonitoringEnergy Audit

MCS

AE

Acorn Electrical & Mechanical

Verified
0.0 (0 reviews)
Plymouth · 25yr warranty
SolarBattery

MCS

AI

ACRS Installations

Verified
0.0 (0 reviews)
Worcester · 25yr warranty
SolarBattery

MCS

AE

Aissac Electrical & Solar

0.0 (0 reviews)
Est. 2006 · Aberdeen · 25yr warranty
SolarEV ChargingMaintenance
AS

AK Systems

Verified
0.0 (0 reviews)
Gloucester · 25yr warranty
SolarBatteryMaintenance

MCS · FGAS

AP

All Powered Up

Verified
0.0 (0 reviews)
Exeter · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

AS

ARD Solar Energy

Verified
0.0 (0 reviews)
Gloucester · 25yr warranty
SolarMaintenance

MCS · NAPIT · REAL

AS

ARD Solar Energy

Verified
0.0 (0 reviews)
Cheltenham · 25yr warranty
SolarBatteryMaintenance

MCS

AG

Aspire Green

Verified
0.0 (23 reviews)
Peterborough · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

AL

AuroraPV Ltd

Verified
0.0 (0 reviews)
Est. 2011 · Luton · 25yr warranty
SolarBattery

MCS

BS

Bath Solar Panel Installation

Verified
0.0 (0 reviews)
Bath · 25yr warranty
SolarBatteryMaintenance

MCS · RECC

BR

Bournemouth Renewables

Verified
0.0 (0 reviews)
Bournemouth · 25yr warranty
SolarBatteryMaintenance

MCS · RECC

BR

Brookfield Renewable Energies

Verified
0.0 (0 reviews)
Est. 2016 · Derby · 25yr warranty
SolarBatteryMaintenance

MCS · HIES

CR

Cambridge Renewables

Verified
0.0 (1 reviews)
Est. 2022 · Cambridge · 25yr warranty
SolarBatteryMaintenanceMonitoring

MCS · RECC

CS

Cambridge Solar

Verified
0.0 (5 reviews)
Est. 2009 · Cambridge · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

CE

Cerretti Electrical

Verified
0.0 (0 reviews)
Aberdeen · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NICEIC

SolarEdge

CS

C&G Solar

Verified
0.0 (0 reviews)
Cheltenham · 25yr warranty
SolarBatteryMaintenance

MCS · NAPIT · RECC

CW

CM Ward

Verified
0.0 (0 reviews)
Est. 2020 · Derby · 25yr warranty
SolarBatteryEV Charging

MCS · RECC

CE

Complete Energy UK

Verified
0.0 (0 reviews)
Est. 2011 · Bournemouth · 25yr warranty
SolarBatteryMaintenance

MCS · RECC · QANW

CC

CME Contractors Ltd

Verified
0.0 (0 reviews)
Cheltenham · 25yr warranty
SolarBatteryEV Charging

MCS · RECC · NAPIT

CS

Cotswold Solar Solutions

Verified
0.0 (0 reviews)
Cheltenham · 25yr warranty
SolarBattery

MCS

CE

County Electrical

Verified
0.0 (0 reviews)
Worcester · 25yr warranty
SolarBatteryEV Charging

MCS

CE

CS Electrical Contracting (UK)

Verified
0.0 (0 reviews)
Swindon · 25yr warranty
SolarBatteryMaintenance

MCS · NICEIC

CS

Custom Solar MK

Verified
0.0 (0 reviews)
Milton Keynes · 25yr warranty
SolarBatteryEV Charging

MCS

D

Dec-Elec

Verified
0.0 (0 reviews)
Est. 2020 · Cardiff · 25yr warranty
SolarBattery

MCS

DO

Depth of Light

Verified
0.0 (0 reviews)
Luton · 25yr warranty
SolarBatteryMaintenance

MCS

D

Dec-Elec

Verified
0.0 (0 reviews)
Swansea · 25yr warranty
SolarBatteryMaintenance

MCS

DS

DLB Solar & Renewables

Verified
0.0 (0 reviews)
Gloucester · 25yr warranty
SolarBatteryEV ChargingMaintenance

NICEIC · BPEC

DS

DLB Solar & Renewables

Verified
0.0 (0 reviews)
Est. 2013 · Cheltenham · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NICEIC

DE

D&R Energy

Verified
0.0 (0 reviews)
Swindon · 25yr warranty
SolarBattery

MCS · RECC · NAPIT

Jinko Solar

DS

Dunstable Solar

Verified
0.0 (0 reviews)
Luton · 25yr warranty
SolarBatteryMaintenance

MCS

EE

Eastbourne Energy

Verified
0.0 (0 reviews)
Eastbourne · 25yr warranty
SolarBatteryEV Charging

MCS

EH

Eco H2O Services

Verified
0.0 (0 reviews)
Aberdeen · 25yr warranty
SolarMaintenanceEnergy Audit

MCS

ES

Eco Solutions Group

Verified
0.0 (0 reviews)
Est. 2023 · Chelmsford · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

ES

Eco-Sun Solutions

Verified
0.0 (0 reviews)
Est. 2023 · Salisbury · 25yr warranty
SolarBattery

MCS · TrustMark

ER

EcoHome Renewables

Verified
0.0 (0 reviews)
Bournemouth · 25yr warranty
SolarBatteryMaintenance

MCS

EE

EcoSphere Energy

Verified
0.0 (0 reviews)
Plymouth · 25yr warranty
SolarBattery

MCS

E

Electrasolar

Verified
0.0 (0 reviews)
Est. 2011 · Cambridge · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

SolarEdge

EC

Electro Contractors Ltd

Verified
0.0 (0 reviews)
Luton · 25yr warranty
SolarBattery

MCS

EP

Electrotec Power Solutions

Verified
0.0 (0 reviews)
Est. 2011 · Eastbourne · 25yr warranty
SolarBatteryMaintenance

MCS

ER

Elements Renewables

Verified
0.0 (0 reviews)
Aberdeen · 25yr warranty
SolarBatteryMaintenance

MCS

E

Energy-tec

Verified
0.0 (0 reviews)
Est. 2013 · Salisbury · 25yr warranty
SolarBatteryMaintenanceEnergy Audit

MCS

E

EVPV

Verified
0.0 (0 reviews)
Wolverhampton
SolarBatteryEV ChargingMaintenance

MCS

FS

Fiesta Solar

Verified
0.0 (0 reviews)
Est. 2023 · Belfast · 25yr warranty
SolarBattery

MCS · RECC

FG

Forever Green Energy

Verified
0.0 (0 reviews)
Est. 2012 · Gloucester · 25yr warranty
SolarBatteryMaintenance

MCS

GG

Geo Green Power

Verified
0.0 (0 reviews)
Bournemouth · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NICEIC · CHAS · RECC

GG

Geo Green Power

Verified
0.0 (0 reviews)
Est. 2010 · Eastbourne · 25yr warranty
SolarBatteryEV ChargingMonitoring

MCS

GG

Geo Green Power

Verified
0.0 (0 reviews)
Est. 2010 · Exeter · 25yr warranty
SolarBatteryMonitoringMaintenance

MCS

GG

Geo Green Power

Verified
0.0 (0 reviews)
Est. 2010 · Northampton · 25yr warranty
SolarBatteryMaintenance

MCS

GB

Green Building Renewables Cambridge

Verified
0.0 (0 reviews)
Est. 2023 · Cambridge · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · RECC · TrustMark

GF

Green Fox Energy

Verified
0.0 (0 reviews)
Dundee · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · RECC

GE

Green Energy Solutions

Verified
0.0 (0 reviews)
Est. 2013 · Plymouth · 25yr warranty
SolarBattery

MCS · RECC

LG

GT

Green Team One

Verified
0.0 (42 reviews)
Est. 2022 · Cheltenham · 25yr warranty
SolarBatteryEV ChargingEnergy Audit

MCS · RECC · TrustMark

GH

Greener Home Renewables

Verified
0.0 (0 reviews)
Est. 2005 · Wolverhampton
SolarBatteryEV ChargingMaintenance

MCS · NICEIC

GE

Greystone Energy (Scotland)

Verified
0.0 (4 reviews)
Est. 2017 · Dundee · 25yr warranty
SolarBatteryEnergy Audit

MCS · RECC · NAPIT

H

Heatology

Verified
0.0 (0 reviews)
Luton · 25yr warranty
SolarBattery

MCS

HE

Hosie Electrical

Verified
0.0 (0 reviews)
Est. 1988 · Aberdeen · 25yr warranty
SolarBatteryMaintenanceMonitoring

MCS · NICEIC · SELECT

HE

HV Electrical Services

Verified
0.0 (0 reviews)
Belfast · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NICEIC · NAP

IT

i-Protech Technology

Verified
0.0 (0 reviews)
Aberdeen · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · RECC

IS

Insolation Solar

Verified
0.0 (0 reviews)
Est. 2020 · Wolverhampton · 10yr warranty
SolarBatteryMaintenanceMonitoring

MCS · RECC · TrustMark · Tesla Certified

IS

Insolation Solar

Verified
0.0 (0 reviews)
Worcester · 25yr warranty
SolarBatteryEV Charging

MCS · RECC

JR

JM Renewable Solutions

Verified
0.0 (18 reviews)
Chester · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NAPIT · RECC · TrustMark

JR

JPS Renewable Energy

Verified
0.0 (0 reviews)
Est. 2010 · Maidstone · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · Which? Trusted Trader

KE

Kind Energy

Verified
0.0 (0 reviews)
Est. 2017 · Milton Keynes · 25yr warranty
SolarBatteryEV Charging

MCS · NAPIT · TrustMark

LR

LC Roofing Contractors

Verified
0.0 (0 reviews)
Est. 2010 · Eastbourne · 25yr warranty
Solar

FENSA

LL

Lectec Ltd

Verified
0.0 (0 reviews)
Colchester · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NAPIT · RECC

LR

Light Renewables

Verified
0.0 (0 reviews)
Est. 2015 · Maidstone · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NAPIT · HIES

ME

MH Electrical & Solar Installations

Verified
0.0 (0 reviews)
Derby · 25yr warranty
SolarBatteryEV Charging

MCS · RECC

MS

Midland Solar

Verified
0.0 (0 reviews)
Wolverhampton
SolarBatteryMaintenance

MCS

MS

Midlands Solar Installations

Verified
0.0 (0 reviews)
Est. 2022 · Wolverhampton · 10yr warranty
SolarBatteryMaintenance

MCS · RECC

MR

MJ Renewables

Verified
0.0 (0 reviews)
Milton Keynes · 25yr warranty
SolarBatteryEV Charging

MCS · NAPIT · RECC

MS

MK Solar Energy

Verified
0.0 (0 reviews)
Milton Keynes · 25yr warranty
SolarBattery

MCS

MS

MK Solar Installers

Verified
0.0 (0 reviews)
Milton Keynes · 25yr warranty
SolarBatteryMaintenance

MCS

MH

Mollison HPR

Verified
0.0 (0 reviews)
Dundee · 25yr warranty
SolarBatteryMaintenance

MCS · RECC

MS

Moulton Solar

Verified
0.0 (0 reviews)
Northampton · 25yr warranty
SolarBatteryEV Charging

MCS · RECC

ME

MRG Electrical Services

Verified
0.0 (0 reviews)
Aberdeen · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NICEIC

M

Mypower

Verified
0.0 (0 reviews)
Est. 2010 · Gloucester · 25yr warranty
SolarBatteryMonitoringMaintenance

MCS

M

Mypower

Verified
0.0 (0 reviews)
Est. 2010 · Swindon · 25yr warranty
SolarMonitoringMaintenance

MCS

NE

Norcroft Energy

Verified
0.0 (0 reviews)
York · 25yr warranty
SolarBatteryMaintenance

MCS · RECC

NE

NXTGEN Energy

Verified
0.0 (0 reviews)
Cambridge · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · TrustMark · HIES · NAPIT

OE

Octopus Energy Services

Verified
0.0 (0 reviews)
Est. 2016 · London · 25yr warranty
SolarBatteryEV ChargingMonitoring

MCS · RECC · TrustMark · NAPIT

JA Solar + Enphase

OE

Optimum Electrics

Verified
0.0 (0 reviews)
Cambridge · 25yr warranty
SolarBatteryEV Charging

MCS

PR

Powerforce Renewables

Verified
0.0 (0 reviews)
Est. 2023 · Southampton · 25yr warranty
SolarBatteryEV Charging

MCS · RECC · TrustMark · NICEIC

PG

Precision Green Energy

Verified
0.0 (0 reviews)
Gloucester · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

PR

Premier Renewables Wiltshire

Verified
0.0 (0 reviews)
Est. 2022 · Swindon · 25yr warranty
SolarBatteryEV Charging

MCS · NAPIT · RECC

PS

Prestige Solar Energy

Verified
0.0 (0 reviews)
Milton Keynes · 25yr warranty
SolarBattery

MCS

PT

Prime Time Solar

Verified
0.0 (0 reviews)
Est. 2010 · Northampton · 25yr warranty
SolarBatteryEV Charging

MCS · HIES · EPVS

PI

PV Install

Verified
0.0 (0 reviews)
Salisbury · 25yr warranty
Solar

MCS · RECC

PR

Pure Renewables

Verified
0.0 (0 reviews)
Est. 2007 · York · 25yr warranty
SolarBatteryMaintenanceMonitoring

MCS · RECC

RS

Reading Solar Panel Installation Experts

Verified
0.0 (0 reviews)
Reading
SolarBatteryMaintenanceMonitoring

MCS

RR

Recharge Renewable

Verified
0.0 (0 reviews)
Bristol · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · RECC · TrustMark · NICEIC

RR

Redwood Renewables

Verified
0.0 (0 reviews)
Est. 2023 · Eastbourne · 25yr warranty
SolarBatteryEV Charging

MCS · NAPIT

RR

Redwood Renewables

Verified
0.0 (0 reviews)
Est. 2023 · Maidstone · 25yr warranty
SolarBatteryMaintenance

MCS · NAPIT · RECC · HIES

RJ

RG Johnson Group

Verified
0.0 (0 reviews)
Bath · 25yr warranty
SolarMaintenance

MCS · RECC · NAPIT

RE

Rudge Energy

Verified
0.0 (0 reviews)
Est. 2010 · Plymouth · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

SR

Scallan Renewables

Verified
0.0 (13 reviews)
Est. 2006 · Dundee · 25yr warranty
SolarBatteryMaintenance

MCS

Canadian Solar + SolarEdge

SS

SLC Solutions

Verified
0.0 (0 reviews)
Est. 2017 · Bournemouth · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NICEIC · RECC

PE

ProSolar Electrical

Verified
0.0 (0 reviews)
Est. 2019 · Worcester · 25yr warranty
SolarBattery

MCS · NICEIC · TrustMark

SA

Solar and Electrics Ltd

Verified
0.0 (0 reviews)
Worcester · 25yr warranty
SolarBattery

MCS

SP

Solar Plus Yorkshire

Verified
0.0 (0 reviews)
Est. 2010 · York · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

SolarWorld

SP

Solar PV Colchester

Verified
0.0 (0 reviews)
Colchester · 25yr warranty
SolarBatteryMaintenance

MCS

S

SOLAROSE

Verified
0.0 (0 reviews)
Maidstone · 25yr warranty
SolarMaintenance

MCS

S

Solarsense

Verified
0.0 (3 reviews)
Est. 1995 · Bath · 25yr warranty
SolarBatteryMaintenanceMonitoring

MCS · RECC · NICEIC

S

Solarsmith

Verified
0.0 (0 reviews)
Est. 2009 · London · 25yr warranty
SolarBatteryMaintenance

MCS · NAPIT

SS

Solec SW Ltd

Verified
0.0 (0 reviews)
Exeter · 25yr warranty
SolarBatteryEV Charging

MCS

SE

South East Solar & Electrical

Verified
0.0 (0 reviews)
Est. 2014 · Maidstone · 25yr warranty
SolarBatteryEV ChargingMaintenance

NAPIT · NICEIC

SE

South East Solar and Storage

Verified
0.0 (0 reviews)
Eastbourne · 25yr warranty
SolarBattery

MCS

SW

South West Eco Energy

Verified
0.0 (0 reviews)
Est. 2010 · Plymouth · 25yr warranty
SolarBattery

MCS

SR

SP Renewables

Verified
0.0 (0 reviews)
Gloucester · 25yr warranty
SolarBatteryMaintenance

MCS

SO

Spot On Solar

Verified
0.0 (0 reviews)
Derby · 25yr warranty
SolarBatteryMaintenance

MCS

SR

SR2 Renewables

Verified
0.0 (0 reviews)
Chester · 25yr warranty
SolarBatteryEV Charging

MCS

SolarEdge

SE

Summit Energies

Verified
0.0 (22 reviews)
Cheltenham · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · NAPIT · RECC · TrustMark

S2

Sun 2 Power

Verified
0.0 (0 reviews)
Bournemouth · 25yr warranty
SolarBattery

MCS

SE

Sussex Energy Advisors

Verified
0.0 (0 reviews)
Eastbourne · 25yr warranty
SolarBattery

MCS · ELECSA

SS

Swansea Solar Energy

Verified
0.0 (0 reviews)
Swansea · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS · RECC

T

TargetCO2

Verified
0.0 (0 reviews)
Exeter · 25yr warranty
SolarEnergy Audit

MCS · TrustMark

TS

Tayside Solar

Verified
0.0 (0 reviews)
Dundee · 25yr warranty
SolarBatteryMaintenance

MCS

TR

TFM Renewables

Verified
0.0 (0 reviews)
Est. 2024 · Cambridge · 25yr warranty
SolarBattery

MCS

TR

TFM Renewables

0.0 (0 reviews)
Est. 2024 · Peterborough · 25yr warranty
SolarBattery
TE

Tile Energy

Verified
0.0 (4 reviews)
Swindon · 25yr warranty
SolarBatteryEV ChargingMaintenance

MCS

SolarEdge

TE

TPS Eco

Verified
0.0 (0 reviews)
Est. 2022 · Maidstone · 25yr warranty
SolarBatteryMaintenance

MCS · Gas Safe · RECC · F-Gas

WG

WDS Green Energy

Verified
0.0 (0 reviews)
Swansea · 25yr warranty
SolarBatteryMaintenance

MCS

WM

West Mids Solar Panels

Verified
0.0 (0 reviews)
Wolverhampton
SolarBatteryMaintenance

MCS

WS

Wiltshire Solar

Verified
0.0 (0 reviews)
Salisbury · 25yr warranty
SolarBatteryMaintenanceMonitoring

MCS

WR

Worcester Renewables Ltd

Verified
0.0 (0 reviews)
Est. 1990 · Worcester · 25yr warranty
SolarBatteryEnergy Audit

MCS

YR

Yarmer Renewables

Verified
0.0 (0 reviews)
Est. 2022 · Plymouth · 25yr warranty
SolarBattery

MCS · Checkatrade

How We Rank Solar Installers

Our rankings combine verified customer reviews, certification status, years of experience, service range, and warranty coverage into a single SurgePV Score. Companies are ranked by this score, with featured installers shown first.

Customer Reviews

We aggregate ratings from Google, Trustpilot, and Checkatrade. Only companies with 4.0+ ratings and verified reviews are listed.

Certifications

MCS certification is the UK standard. We also check for RECC, TrustMark, NAPIT, NICEIC, and ISO 9001 accreditations.

Track Record

Years in business, projects completed, warranty coverage, and service range contribute to the overall score.

Why Trust the SurgePV Directory?

Every company listed here has been independently researched and verified. We check certifications against official registers, aggregate reviews from multiple platforms, and verify that every business is actively trading. Companies cannot pay to improve their ranking — placement is based on verified data only.

503

Verified Companies

125,148

Customer Reviews

How to Choose a Solar Installer in the UK

1

Check MCS Certification

MCS certification is non-negotiable. Without it, you can't access the Smart Export Guarantee or any government-backed financing. Verify the installer's MCS number on the official register at mcscertified.com.

2

Get Multiple Quotes

Get at least three quotes from different installers. Prices for the same system size can vary by 30–40%. A good quote includes a full breakdown of panels, inverter, labour, scaffolding, and any additional work like roof reinforcement.

3

Read Independent Reviews

Check Google, Trustpilot, and Checkatrade reviews. Look for patterns in negative reviews — repeated complaints about communication or after-sales service are red flags. Our directory aggregates reviews from all major platforms.

4

Ask About Warranties

A reputable installer offers separate warranties for panels (25 years), inverter (10–15 years), and workmanship (5–10 years). Be wary of companies offering unusually short installation warranties or vague terms.

5

Verify Insurance and Aftercare

Confirm the installer carries public liability insurance and offers ongoing maintenance. Ask whether they handle DNO notifications and MCS registration on your behalf — most reputable companies do.

For Solar Installers

Design Faster. Sell More.

SurgePV is the solar design platform used by installers across the UK. Cut design time by 60%, generate professional proposals in minutes, and close more deals.

Solar Installation in the UK: Step by Step

1

Free Consultation

Contact an installer for a free site survey. They'll assess your roof, shading, and energy usage.

2

Design & Quote

Receive a detailed proposal with system size, expected generation, costs, and projected savings.

3

Installation

Scaffolding goes up, panels and inverter are installed. Most residential systems take 1–3 days.

4

Inspection

Building control sign-off, DNO notification, and MCS certificate issued for SEG eligibility.

5

Go Live

System is commissioned, monitoring is set up, and you start generating clean energy and saving money.

Frequently Asked Questions

How much do solar panels cost in the UK?

A typical 4kW residential solar panel system in the UK costs between £5,000 and £8,000 including installation. Larger systems for commercial properties range from £10,000 to £50,000+ depending on capacity and complexity. Since April 2022, residential solar installations are VAT-exempt at 0%, reducing the overall cost.

What certifications should a UK solar installer have?

UK solar installers should hold MCS (Microgeneration Certification Scheme) certification, which is mandatory for customers to access the Smart Export Guarantee. RECC (Renewable Energy Consumer Code) membership and TrustMark registration are also strong indicators of quality and consumer protection.

What is the Smart Export Guarantee (SEG)?

The Smart Export Guarantee (SEG) is a UK government scheme requiring licensed energy suppliers to pay small-scale generators for surplus electricity exported to the grid. Rates typically range from 4–6p per kWh, though some suppliers offer higher fixed rates. Your system must be MCS-certified to qualify.

Is battery storage worth it with solar panels in the UK?

Battery storage can increase solar self-consumption from around 40% to 80% or more. With typical battery costs of £2,500–£6,000 and rising electricity prices, most UK homeowners see a return on battery investment within 6–10 years. Batteries also provide backup power during grid outages.

When is the best time to install solar panels in the UK?

Solar panels can be installed year-round in the UK. Spring and autumn tend to have shorter wait times as demand peaks in summer. Installing before April allows you to benefit from a full summer of high solar generation. Panels actually perform slightly better in cooler temperatures, so winter installations are perfectly viable.

Do I need planning permission for solar panels in the UK?

Most domestic solar panel installations in the UK fall under permitted development rights, so planning permission is not required. Exceptions include listed buildings, conservation areas, flats, and systems that protrude more than 200mm from the roof surface. Ground-mounted systems must not exceed 9m² in area. Always check with your local planning authority if you're unsure.

How long do solar panels last in the UK climate?

Modern solar panels are designed to last 25–30 years and come with performance warranties guaranteeing at least 80% output after 25 years. The UK climate — including rain, wind, and temperature variation — does not significantly reduce panel lifespan. Inverters typically last 10–15 years and may need replacing once during the panel lifetime.