Add Solar & Electrical
BBB A+ rated Miami electricians and solar installers specializing in residential and commercial projects
5+
Years in Business
20
Customer Reviews
37 mi
Service Area
2-10
Employees
SurgePV Score
About Add Solar & Electrical
Add Solar & Electrical is a Miami-based company founded in 2021 that combines licensed electrical contracting with solar energy installation. The company serves residential and commercial clients throughout Miami-Dade County, offering solar panel installations, EV charger setups, electrical panel upgrades, and parking lot lighting installations. Their dual expertise in electrical work and solar allows them to handle projects that require electrical infrastructure upgrades before solar can be installed.
The company holds an A+ rating with the Better Business Bureau, where they have been accredited since November 2024. Add Solar & Electrical also maintains both a state-certified electrical contractor license and a solar contractor license. Their service scope is broader than many pure-play solar installers, covering general electrical work, EV charging infrastructure, and commercial lighting alongside residential and commercial solar PV systems.
Add Solar & Electrical has earned 20 reviews on Yelp with 94 photos documenting their work, and maintains a strong presence on Google reviews. The company’s BBB A+ rating reflects their commitment to resolving customer concerns and maintaining high service standards. Customers highlight the company’s responsiveness, honest assessments of what work is needed, and the quality of both their electrical and solar installations.
Service Area
Add Solar & Electrical serves the following areas within a 37-mile radius:
Contact Information
Are you Add Solar & Electrical?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.9
20 reviews
Oscar M.
Add Solar handled our solar panel installation and electrical panel upgrade as one project. Their electricians are top-notch and the solar system has been performing great since day one.
Rebecca J.
Fast, responsive, and professional. They installed an EV charger alongside our solar panels and made sure everything was properly integrated. Very happy with the result.
Daniel F.
I needed a full electrical panel upgrade before going solar and Add Solar took care of both. They were honest about what was needed and the pricing was fair. Highly recommend.
Frequently Asked Questions About Add Solar & Electrical
What services does Add Solar & Electrical offer?
Add Solar & Electrical offers Solar Installation, Battery Storage, EV Charging, Solar Design, Energy Audit, Grid Connection, Maintenance.
Is Add Solar & Electrical NABCEP certified?
Add Solar & Electrical holds the following certifications: BBB Accredited, State Certified Electrical Contractor, State Certified Solar Contractor. Contact them directly for the latest accreditation details.
What areas does Add Solar & Electrical serve?
Add Solar & Electrical serves Miami, Miami Beach, Coral Gables, Doral, Hialeah, Kendall, Homestead. They are based in Miami with a service radius of 60 km.
What warranty does Add Solar & Electrical offer?
Add Solar & Electrical offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Add Solar & Electrical's customer reviews?
Add Solar & Electrical has a 4.9/5 rating based on 20 customer reviews. Customers consistently rate them highly.
How long has Add Solar & Electrical been in business?
Add Solar & Electrical was founded in 2021 and has been in business for 5 years. They have solid experience in the solar industry.
Similar Installers in Miami
Get a Free Solar Quote from Add Solar & Electrical
Fill in your details and we'll connect you with Add Solar & Electrical.
Quote request sent!
Add Solar & Electrical will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile