AES Solar
Scotland's longest-established solar company, founded in 1979, with an Edinburgh office and Queen's Award for Enterprise
47+
Years in Business
21
Customer Reviews
100 km
Service Area
SurgePV Score
About AES Solar
AES Solar is Scotland’s longest-established solar company, founded in 1979 in Forres, Moray. The company operates an Edinburgh office and serves customers across the whole of Scotland. AES Solar holds MCS and RECC certifications and was awarded The Queen’s Award for Enterprise in 2019 for Sustainable Development, recognising their commitment to renewable energy over four decades.
The company is the only manufacturer of flat plate solar thermal collectors in the UK, alongside their solar PV installation business. AES Solar installs residential and commercial solar PV systems, battery storage, and solar thermal panels. Their Edinburgh office gives central Scotland customers a local point of contact backed by the resources and manufacturing capability of the wider business.
AES Solar has completed notable projects including a solar PV installation at Edinburgh Castle, demonstrating their capability to work on sensitive and heritage buildings. The company serves customers across Edinburgh, Glasgow, Dundee, Perth, Inverness, and the rest of mainland Scotland. Their 45-year track record makes them one of the most experienced solar businesses in the UK.
Service Area
AES Solar serves the following areas within a 100 km radius:
Contact Information
Are you AES Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Warranty Coverage
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
4
21 reviews
Edinburgh Homeowner
AES stood out for the thoroughness of their approach and the excellent advice they offer prospective clients. Everything was arranged at a convenient time and done quickly with minimum fuss.
Scottish Customer
The installers were friendly and efficient. All documentation was in place afterwards. A well-run operation with decades of experience behind them.
Frequently Asked Questions About AES Solar
What services does AES Solar offer?
AES Solar offers Solar Installation, Battery Storage, Maintenance.
Is AES Solar MCS certified?
Yes, AES Solar is MCS certified and also holds RECC, Queen's Award for Enterprise certifications. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does AES Solar serve?
AES Solar serves Edinburgh, Glasgow, Dundee, Perth, Inverness. They are based in Edinburgh with a service radius of 100 km.
What warranty does AES Solar offer?
AES Solar offers 25-year panel warranty, and 10-year installation/workmanship warranty.
How are AES Solar's customer reviews?
AES Solar has a 4/5 rating based on 21 customer reviews. They are well-regarded by their customers.
How long has AES Solar been in business?
AES Solar was founded in 1979 and has been in business for 47 years. They are one of the more experienced solar installers in their area.
Similar Installers in Edinburgh
Get a Free Solar Quote from AES Solar
Fill in your details and we'll connect you with AES Solar.
Quote request sent!
AES Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile