Ailey Solar Electric
Chicagoland's premier solar installer for residential and commercial projects since 2007
19+
Years in Business
50
Customer Reviews
50 mi
Service Area
11-50
Employees
SurgePV Score
About Ailey Solar Electric
Ailey Solar Electric is a solar installation company founded in 2007 by two environmental activists, headquartered at 1965 W Pershing Rd in Chicago. The company serves the entire Chicagoland area, providing residential and commercial solar panel design and installation services. They are one of the longest-operating local solar companies in the Chicago market.
Ailey Solar holds an A+ rating with the BBB, where they have been accredited since April 2023. The company handles full-service solar installations including site assessment, system design, permitting, installation, and utility interconnection. They are listed among the top solar installers in Chicago on multiple review platforms.
The company maintains a 4.6-star rating on TrustAnalytica and positive reviews across Yelp, Angi, and Facebook. Ailey Solar is known for their consultative approach, with customers consistently praising the team’s professionalism, transparency, and knowledge of Illinois solar incentive programs including Illinois Shines.
Service Area
Ailey Solar Electric serves the following areas within a 50-mile radius:
Contact Information
Are you Ailey Solar Electric?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Inverters
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.6
50 reviews
Maria G.
Ailey Solar was professional, knowledgeable, and transparent at every step of our project. The installation crew was efficient and the system has been performing great.
Carlos R.
Excellent experience from consultation to installation. They took the time to explain everything and helped us navigate Illinois solar incentives. Highly recommend.
Sandra K.
Good company with knowledgeable staff. The installation was done well and on schedule. Customer service has been responsive to our questions after installation.
Frequently Asked Questions About Ailey Solar Electric
What services does Ailey Solar Electric offer?
Ailey Solar Electric offers Solar Installation, Battery Storage.
Is Ailey Solar Electric NABCEP certified?
Yes, Ailey Solar Electric is NABCEP certified. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Ailey Solar Electric serve?
Ailey Solar Electric serves Chicago, Evanston, Oak Park, Naperville, Schaumburg, Aurora. They are based in Chicago with a service radius of 80 km.
What warranty does Ailey Solar Electric offer?
Ailey Solar Electric offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Ailey Solar Electric's customer reviews?
Ailey Solar Electric has a 4.6/5 rating based on 50 customer reviews. Customers consistently rate them highly.
How long has Ailey Solar Electric been in business?
Ailey Solar Electric was founded in 2007 and has been in business for 19 years. They are one of the more experienced solar installers in their area.
Similar Installers in Chicago
Get a Free Solar Quote from Ailey Solar Electric
Fill in your details and we'll connect you with Ailey Solar Electric.
Quote request sent!
Ailey Solar Electric will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile