AE

Aissac Electrical & Solar

Aberdeenshire's pioneering solar PV and EV charging specialists, established 2006

Aberdeen, UK
0 (0 reviews)
Residential Commercial

20+

Years in Business

0

60 km

Service Area

1-10

Employees

SurgePV Score

4 / 10
Customer Reviews
0%
Certifications
0%
Experience
100%
Services Range
75%
Warranty Coverage
60%
Online Presence
25%

About Aissac Electrical & Solar

Aissac Electrical & Solar is based at 40 Morrison’s Croft Crescent, Bridge of Don, Aberdeen, AB23 8FG. The company was established in 2006 and achieved a significant milestone in January 2008 when it became the first MCS-accredited solar PV installer in Scotland — a distinction that reflects the founders’ early commitment to the renewable energy sector when the industry was still in its infancy.

The company offers solar PV installation for residential and commercial customers across Aberdeen and Aberdeenshire, alongside EV charging point installation. As fully qualified electricians, the Aissac team brings a strong electrical foundation to every solar project, covering system design, roof mounting, inverter installation, grid connection, and commissioning.

Aissac’s long track record in the Aberdeen market — spanning nearly two decades — means the team has experience with a wide range of property types, roof configurations, and system sizes. The company’s roots as an electrical contractor mean they handle all aspects of the installation without subcontracting the electrical work.

Customer reviews on the company website highlight consistently positive experiences, with homeowners praising the quality of the installation work and the knowledge of the team. Aissac represents a locally grounded option for Aberdeen and Aberdeenshire residents who want an experienced, established specialist rather than a national franchise.

The company can be contacted on 01224 701362 to arrange a site visit and quotation.

Service Area

Aissac Electrical & Solar serves the following areas within a 60 km radius:

AberdeenBridge of DonAberdeenshireInverurieEllon

Are you Aissac Electrical & Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
EV Charging
Maintenance

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

10 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About Aissac Electrical & Solar

What services does Aissac Electrical & Solar offer?

Aissac Electrical & Solar offers Solar Installation, EV Charging, Maintenance.

Is Aissac Electrical & Solar MCS certified?

Aissac Electrical & Solar holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does Aissac Electrical & Solar serve?

Aissac Electrical & Solar serves Aberdeen, Bridge of Don, Aberdeenshire, Inverurie, Ellon. They are based in Aberdeen with a service radius of 60 km.

What warranty does Aissac Electrical & Solar offer?

Aissac Electrical & Solar offers 25-year panel warranty, 10-year inverter warranty, and 10-year installation/workmanship warranty.

How are Aissac Electrical & Solar's customer reviews?

Aissac Electrical & Solar does not have any reviews yet. Be the first to leave a review after using their services.

How long has Aissac Electrical & Solar been in business?

Aissac Electrical & Solar was founded in 2006 and has been in business for 20 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Aissac Electrical & Solar

Fill in your details and we'll connect you with Aissac Electrical & Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote