Alba Heat and Power
Family-run MCS, RECC, and TrustMark-accredited solar and battery specialist serving Edinburgh and Central Scotland
16+
Years in Business
30
Customer Reviews
80 km
Service Area
SurgePV Score
About Alba Heat and Power
Alba Heat and Power is a family-run solar PV and battery storage installer based at 4 East Albert Road in Kirkcaldy, Fife. Founded in 2010, the company serves homeowners across Edinburgh, Fife, and Central Scotland. Alba Heat and Power holds MCS (certificate NAP25481), RECC, and TrustMark accreditations, ensuring installations meet the highest industry standards.
The company specialises in residential solar PV systems and battery storage, providing tailored solutions designed to reduce energy costs and maximise self-consumption. As a family business, Alba Heat and Power focuses on personal service and clear communication throughout the installation process. Their team handles every stage from initial survey and system design through to installation and commissioning.
Alba Heat and Power serves customers across Edinburgh, Kirkcaldy, Dunfermline, and the wider Fife and Central Scotland region. As an MCS-certified installer, their solar systems qualify for the Smart Export Guarantee and 0% VAT on domestic solar installations. The company also advises on available Scottish Government grants and Home Energy Scotland funding options.
Service Area
Alba Heat and Power serves the following areas within a 80 km radius:
Contact Information
Are you Alba Heat and Power?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Warranty Coverage
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
4.8
30 reviews
Edinburgh Homeowner
Alba Heat and Power provided excellent service from initial consultation to final installation. The team were friendly, professional, and left everything tidy. Very happy with our solar system.
Fife Customer
Great experience with a genuine family business. Wayne was helpful and knowledgeable. The installation was completed quickly and the system is performing well.
Frequently Asked Questions About Alba Heat and Power
What services does Alba Heat and Power offer?
Alba Heat and Power offers Solar Installation, Battery Storage.
Is Alba Heat and Power MCS certified?
Yes, Alba Heat and Power is MCS certified and also holds RECC, TrustMark certifications. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Alba Heat and Power serve?
Alba Heat and Power serves Edinburgh, Kirkcaldy, Dunfermline, Fife, Falkirk. They are based in Edinburgh with a service radius of 80 km.
What warranty does Alba Heat and Power offer?
Alba Heat and Power offers 25-year panel warranty, and 10-year installation/workmanship warranty.
How are Alba Heat and Power's customer reviews?
Alba Heat and Power has a 4.8/5 rating based on 30 customer reviews. Customers consistently rate them highly.
How long has Alba Heat and Power been in business?
Alba Heat and Power was founded in 2010 and has been in business for 16 years. They are one of the more experienced solar installers in their area.
Similar Installers in Edinburgh
Get a Free Solar Quote from Alba Heat and Power
Fill in your details and we'll connect you with Alba Heat and Power.
Quote request sent!
Alba Heat and Power will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile