American Dream Solar
NABCEP-certified solar panel specialists with 25-year workmanship warranty
5+
Years in Business
51
Customer Reviews
50 mi
Service Area
1-10
Employees
SurgePV Score
About American Dream Solar
American Dream Solar LLC is a residential solar installation company based at 12324 Tree Line Dr, Crowley, TX 76036, serving the Fort Worth and broader DFW metropolitan area. Founded in 2021, the company specializes in solar panel installation, removal and reinstallation for roof replacements, EV charger installation, and battery backup systems.
The company employs NABCEP-Certified PV Professional installers and offers a 25-year workmanship warranty on installations. American Dream Solar is BBB Accredited and maintains a 5.0-star rating across review platforms. The company serves residential customers throughout the Dallas-Fort Worth, Houston, and Central Texas regions.
American Dream Solar operates Monday through Friday from 8 AM to 5 PM. The company focuses on providing affordable, high-quality solar solutions with an emphasis on customer service and professional craftsmanship backed by industry-recognized certifications.
Service Area
American Dream Solar serves the following areas within a 50-mile radius:
Contact Information
Are you American Dream Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
25 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
5
51 reviews
Patricia G.
American Dream Solar removed and reinstalled our panels for a roof replacement. Fast, professional, and affordable. The crew was careful with every panel.
Daniel F.
Great company to work with. They completed the job ahead of schedule and their pricing was very competitive compared to other quotes we received.
Maria L.
NABCEP-certified installers who clearly know what they are doing. The entire process from consultation to final inspection was smooth and well-organized.
Frequently Asked Questions About American Dream Solar
What services does American Dream Solar offer?
American Dream Solar offers Solar Installation, Battery Storage, EV Charging.
Is American Dream Solar NABCEP certified?
Yes, American Dream Solar is NABCEP certified. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does American Dream Solar serve?
American Dream Solar serves Fort Worth, Crowley, Dallas, Arlington. They are based in Fort Worth with a service radius of 80 km.
What warranty does American Dream Solar offer?
American Dream Solar offers 25-year panel warranty, 12-year inverter warranty, and 25-year installation/workmanship warranty.
How are American Dream Solar's customer reviews?
American Dream Solar has a 5/5 rating based on 51 customer reviews. Customers consistently rate them highly.
How long has American Dream Solar been in business?
American Dream Solar was founded in 2021 and has been in business for 5 years. They have solid experience in the solar industry.
Similar Installers in Fort Worth
Get a Free Solar Quote from American Dream Solar
Fill in your details and we'll connect you with American Dream Solar.
Quote request sent!
American Dream Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile