AE

Apollo Energy

Colorado's first B Corp certified solar company, woman-owned and operated, serving the Front Range since 2015

Colorado Springs, Colorado
4.7 (34 reviews)
Residential Commercial

11+

Years in Business

0

34

Customer Reviews

75 mi

Service Area

11-50

Employees

SurgePV Score

7.2 / 10
Customer Reviews
94%
Certifications
0%
Experience
85%
Services Range
90%
Warranty Coverage
80%
Online Presence
100%

About Apollo Energy

Apollo Energy is a locally owned and operated solar installation company headquartered at 1400 E 66th Avenue, Unit B, in Denver, Colorado, serving the full Colorado Front Range including Colorado Springs. Founded in 2015, Apollo Energy is Denver’s first B Corp Certified solar company and Colorado’s only majority female-owned solar installer. The company markets, sells, warrants, and installs all of its own solar systems using in-house electricians and installation teams.

Apollo Energy provides comprehensive solar services including residential and commercial panel installation, battery storage, EV chargers, generators, main panel upgrades, sub-panel installations, solar system service and maintenance, and solar panel removal and reinstallation. The company is a SolarEdge certified installer and handles all aspects of the project from consultation and custom design through financing, permitting, and installation. Business hours are Monday through Friday 8:00 AM to 6:00 PM and Saturday 9:00 AM to 2:00 PM.

Apollo Energy maintains a 4.7-star rating on Yelp from 34 reviews and holds a BBB-accredited profile. The company’s B Corp certification reflects its commitment to environmental and social responsibility beyond standard business practices. For Colorado Springs homeowners who value working with a locally owned, values-driven company that uses in-house installation crews, Apollo Energy offers a differentiated approach to residential solar.

Service Area

Apollo Energy serves the following areas within a 75-mile radius:

Colorado SpringsDenverBoulderFort CollinsLovelandCastle RockMonument

Are you Apollo Energy?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Maintenance
Solar Design

Partner Manufacturers

Inverters

SolarEdge

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.7

34 reviews

Jessica M.

15 November 2025
Verified Customer

Apollo Energy designed a system perfectly sized for our Colorado Springs home. As a B Corp company, they clearly care about doing things right. The in-house installation team was professional and the system is performing great.

Nathan C.

22 August 2025
Verified Customer

We appreciated that Apollo uses their own employees for installation rather than subcontractors. The quality shows. Everything was completed on schedule and the system started producing power immediately after utility approval.

Rachel D.

30 May 2025
Verified Customer

Good experience with Apollo Energy. They were transparent about costs and realistic about production estimates for our north-side-of-town location. The battery installation adds peace of mind during storm season.

Frequently Asked Questions About Apollo Energy

What services does Apollo Energy offer?

Apollo Energy offers Solar Installation, Battery Storage, EV Charging, Maintenance, Solar Design.

Is Apollo Energy NABCEP certified?

Apollo Energy holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does Apollo Energy serve?

Apollo Energy serves Colorado Springs, Denver, Boulder, Fort Collins, Loveland, Castle Rock, Monument. They are based in Colorado Springs with a service radius of 120 km.

What warranty does Apollo Energy offer?

Apollo Energy offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Apollo Energy's customer reviews?

Apollo Energy has a 4.7/5 rating based on 34 customer reviews. Customers consistently rate them highly.

How long has Apollo Energy been in business?

Apollo Energy was founded in 2015 and has been in business for 11 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Apollo Energy

Fill in your details and we'll connect you with Apollo Energy.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote