ARD Solar Energy
Family-run MCS solar PV installer serving Cheltenham, Gloucester, Cotswolds and surrounding counties
2026+
Years in Business
50 km
Service Area
1-10
Employees
SurgePV Score
About ARD Solar Energy
ARD Solar Energy is a family-run solar PV installer based at 41 Brunswick Road, Gloucester GL1 1JS, serving Cheltenham, the Cotswolds, and a wide area extending into Herefordshire and the Welsh Borders. The company uses qualified MCS installers and installs only MCS-approved solar panels and equipment.
The company’s service area covers Cheltenham, Gloucester, Stroud, Cirencester, Tewkesbury, Tetbury, Ross-on-Wye, Hereford, Evesham, Bristol, and Swindon, making ARD one of the wider-ranging local solar PV specialists in the region.
ARD Solar Energy installs domestic and commercial solar PV systems and battery storage. As a family business, the company operates with a small core team, which gives customers direct access to the installer throughout the project. The phone number is 01452 506801.
ARD Solar Energy is listed in ENF Solar’s UK installer directory and has a presence on Nextdoor, Yell, and the SolarLocator installer database. For customers in Cheltenham looking for a Gloucester-based operator with deep regional roots, ARD Solar Energy is a verified local option.
Service Area
ARD Solar Energy serves the following areas within a 50 km radius:
Contact Information
Are you ARD Solar Energy?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
No reviews yet.
Frequently Asked Questions About ARD Solar Energy
What services does ARD Solar Energy offer?
ARD Solar Energy offers Solar Installation, Battery Storage, Maintenance.
Is ARD Solar Energy MCS certified?
Yes, ARD Solar Energy is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does ARD Solar Energy serve?
ARD Solar Energy serves Cheltenham, Gloucester, Stroud, Cirencester, Tewkesbury, Ross-on-Wye, Hereford. They are based in Cheltenham with a service radius of 50 km.
What warranty does ARD Solar Energy offer?
ARD Solar Energy offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are ARD Solar Energy's customer reviews?
ARD Solar Energy does not have any reviews yet. Be the first to leave a review after using their services.
How long has ARD Solar Energy been in business?
ARD Solar Energy was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.
Similar Installers in Cheltenham
Get a Free Solar Quote from ARD Solar Energy
Fill in your details and we'll connect you with ARD Solar Energy.
Quote request sent!
ARD Solar Energy will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile