Atlantic Renewables
Family-run solar specialists with 5-star Google reviews serving Greater Manchester and Cheshire since 2011
15+
Years in Business
28
Customer Reviews
60 km
Service Area
2-10
Employees
SurgePV Score
About Atlantic Renewables
Atlantic Renewables is a family-run solar PV design and installation company based at 34 Brindley Road, Stretford, Manchester M16 9HQ. Founded in 2011, the company has built a strong reputation across Greater Manchester and Cheshire, serving homeowners and businesses in Sale, Stockport, Altrincham, Trafford and the wider North West. The company also maintains an office at 51 Hillcroft Road, Altrincham, Cheshire WA14 4JE.
The company is fully MCS accredited, which means customers can access the Smart Export Guarantee for payments on exported electricity. Atlantic Renewables also holds Health and Safety Construction Site certifications including IPAF, CSCS cards, and Working at Height qualifications. They are a Which? Trusted Trader, adding an extra layer of independent verification to their service quality.
On Trustpilot, Atlantic Renewables holds a 4.0-star rating from 28 reviews, while maintaining a consistent 5-star Google review rating. Customers frequently praise the no-pressure quotation process, professional installation teams, and willingness to accommodate specific siting requests. The company installs GivEnergy battery storage alongside solar PV systems and EV charging solutions for both residential and commercial customers.
Service Area
Atlantic Renewables serves the following areas within a 60 km radius:
Contact Information
Are you Atlantic Renewables?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Batteries
Warranty Coverage
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
4
28 reviews
Verified Customer
The installation team arrived on time and could not have been more considerate, professional and helpful. All of our requests for siting equipment were accommodated and the work was completed to a very high standard.
Verified Customer
Atlantic Renewables service was exemplary from initial contact through to the provision of the quotation. There were no hard sell techniques and they took time to listen to my requirements and provide advice before providing a very detailed report and quotation.
Verified Customer
Atlantic Renewables did an amazing job fitting my EV charger. Customer service was spot on, and they routed the wires exactly how I wanted, even overcoming a few tricky challenges without any fuss.
Frequently Asked Questions About Atlantic Renewables
What services does Atlantic Renewables offer?
Atlantic Renewables offers Solar Installation, Battery Storage, EV Charging, Maintenance.
Is Atlantic Renewables MCS certified?
Yes, Atlantic Renewables is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Atlantic Renewables serve?
Atlantic Renewables serves Manchester, Stretford, Sale, Stockport, Altrincham, Trafford. They are based in Manchester with a service radius of 60 km.
What warranty does Atlantic Renewables offer?
Atlantic Renewables offers 25-year panel warranty, and 10-year installation/workmanship warranty.
How are Atlantic Renewables's customer reviews?
Atlantic Renewables has a 4/5 rating based on 28 customer reviews. They are well-regarded by their customers.
How long has Atlantic Renewables been in business?
Atlantic Renewables was founded in 2011 and has been in business for 15 years. They are one of the more experienced solar installers in their area.
Similar Installers in Manchester
Get a Free Solar Quote from Atlantic Renewables
Fill in your details and we'll connect you with Atlantic Renewables.
Quote request sent!
Atlantic Renewables will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile