BT

Better Together Solar

Largest solar installer based in Northeast Ohio since 2007 — veteran-owned with 3 NABCEP-certified professionals

Cleveland, Ohio
5 (11 reviews)
Verified
Residential Commercial

19+

Years in Business

200+

Projects Completed

11

Customer Reviews

93 mi

Service Area

11-50

Employees

SurgePV Score

9.5 / 10
Customer Reviews
100%
Certifications
90%
Experience
100%
Services Range
90%
Warranty Coverage
80%
Online Presence
100%

About Better Together Solar

Better Together Solar (BT Solar) is the largest solar power installer based in Northeast Ohio, founded in 2007 and headquartered at 3821 Prospect Ave E, Cleveland, OH 44115. The company serves residential, commercial, and nonprofit clients across Northeast Ohio with over 200 completed projects and 17 years of experience.

Better Together Solar is a Veteran Owned Small Business with three NABCEP Certified Solar PV Installation Professionals on staff. The company maintains a BBB A+ rating with accreditation since 2014. BT Solar provides turnkey services including financial feasibility studies, system design, energy storage optimization, permitting, construction, inspection, commissioning, utility registration, and SREC tracking and aggregation.

The company also offers operations and maintenance, microgrid solutions, energy storage, solar array appraisals, and comprehensive financial analysis for commercial and nonprofit solar projects.

Service Area

Better Together Solar serves the following areas within a 93-mile radius:

ClevelandAkronCantonYoungstownLorain

Are you Better Together Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance
Monitoring

Certifications & Accreditations

NABCEP Certified (3 professionals) BBB A+ Veteran Owned Small Business

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

5

11 reviews

Verified Customer

28 September 2025
Verified Customer

Better Together Solar completed our commercial installation on time and on budget. Their NABCEP-certified team designed a system that maximizes our roof space.

Verified Customer

15 June 2025
Verified Customer

Outstanding experience from feasibility study through commissioning. They even helped us track and sell our SRECs.

Verified Customer

20 March 2025
Verified Customer

As a veteran-owned company, they bring discipline and professionalism to every project. Highly recommend for residential solar.

Frequently Asked Questions About Better Together Solar

What services does Better Together Solar offer?

Better Together Solar offers Solar Installation, Battery Storage, Maintenance, Monitoring.

Is Better Together Solar NABCEP certified?

Better Together Solar holds the following certifications: NABCEP Certified (3 professionals), BBB A+, Veteran Owned Small Business. Contact them directly for the latest accreditation details.

What areas does Better Together Solar serve?

Better Together Solar serves Cleveland, Akron, Canton, Youngstown, Lorain. They are based in Cleveland with a service radius of 150 km.

What warranty does Better Together Solar offer?

Better Together Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Better Together Solar's customer reviews?

Better Together Solar has a 5/5 rating based on 11 customer reviews. Customers consistently rate them highly.

How long has Better Together Solar been in business?

Better Together Solar was founded in 2007 and has been in business for 19 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Better Together Solar

Fill in your details and we'll connect you with Better Together Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote