Big Dog Solar
Southern Colorado's experienced solar installer with over 6,000 completed projects and NABCEP-certified professionals since 2008
18+
Years in Business
6,000+
Projects Completed
180
Customer Reviews
75 mi
Service Area
51-200
Employees
SurgePV Score
About Big Dog Solar
Big Dog Solar is a solar installation company with a Southern Colorado office at 168 N Aspen Ski Way in Pueblo West, serving the Colorado Springs metro area and communities throughout Southern and Western Colorado. Founded in 2008, the company has completed over 6,000 solar projects and employs NABCEP Certified Solar PV Installers. Big Dog Solar’s business hours are Monday through Friday 8:00 AM to 6:00 PM, with Saturday hours from 10:00 AM to 4:00 PM.
The company provides residential and commercial solar panel installations, battery storage systems, and ongoing maintenance and monitoring services. Big Dog Solar’s extensive project history across Colorado gives the team deep experience with the state’s varied terrain, elevation, and climate conditions. The company designs systems optimized for Colorado’s high-altitude solar resource, which produces some of the strongest solar yields in the country.
Big Dog Solar holds a 4.5-star rating across review platforms with over 180 customer reviews. The company is recognized by EcoWatch and other industry reviewers as a top solar installer in Colorado. Customers frequently cite the company’s experience, NABCEP-certified staff, and reliable post-installation support as key reasons for their satisfaction. For Colorado Springs homeowners looking for a proven installer with thousands of completed projects, Big Dog Solar offers an experienced team backed by nearly two decades of Colorado solar work.
Service Area
Big Dog Solar serves the following areas within a 75-mile radius:
Contact Information
Are you Big Dog Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
180 reviews
Steve H.
Big Dog Solar installed a large residential system on our property near Colorado Springs. The NABCEP-certified team designed a layout that avoids the afternoon shading from our trees. Production has been excellent year-round.
Karen J.
We chose Big Dog based on their 6,000+ completed projects and it was the right call. The installation was smooth, the crew was experienced, and the system started producing power the same week it was turned on.
Timothy R.
Solid company with a long track record in Colorado. The sales process was thorough and the equipment quality is top-notch. Permitting took a bit longer than expected but Big Dog handled all the paperwork.
Frequently Asked Questions About Big Dog Solar
What services does Big Dog Solar offer?
Big Dog Solar offers Solar Installation, Battery Storage, Solar Design, Maintenance, Monitoring.
Is Big Dog Solar NABCEP certified?
Yes, Big Dog Solar is NABCEP certified. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Big Dog Solar serve?
Big Dog Solar serves Colorado Springs, Pueblo, Pueblo West, Grand Junction, Canon City, Montrose, Durango. They are based in Colorado Springs with a service radius of 120 km.
What warranty does Big Dog Solar offer?
Big Dog Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Big Dog Solar's customer reviews?
Big Dog Solar has a 4.5/5 rating based on 180 customer reviews. Customers consistently rate them highly.
How long has Big Dog Solar been in business?
Big Dog Solar was founded in 2008 and has been in business for 18 years. They are one of the more experienced solar installers in their area.
Similar Installers in Colorado Springs
Get a Free Solar Quote from Big Dog Solar
Fill in your details and we'll connect you with Big Dog Solar.
Quote request sent!
Big Dog Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile