BKJ Solar
NABCEP-certified local St. Louis solar installer offering a wide range of panel brands and Enphase microinverters
9+
Years in Business
35
Customer Reviews
62 mi
Service Area
1-10
Employees
SurgePV Score
About BKJ Solar
BKJ Solar is a locally owned solar installation company serving the St. Louis metropolitan area. Co-owned by Joseph Schorman, Kyle Barber, and Brian Link, the company brings NABCEP-certified expertise to residential solar projects across the region. BKJ Solar is also Enphase certified and serves as a Generac dealer, providing backup power solutions alongside solar installations.
The company works with a wide range of solar panel manufacturers including SunPower, Panasonic, Jinko, Canadian Solar, Trina, and Silfab, allowing customers to choose equipment that fits their performance goals and budget. Inverter systems are built around Enphase microinverters, and battery storage options include Generac PWRcell and Enphase IQ systems. BKJ Solar handles design, permitting, installation, and utility interconnection for every project.
BKJ Solar operates from its location at 907 Harbor Oaks Court in the St. Louis area and serves customers across St. Louis City, St. Louis County, and surrounding communities. The company offers free solar consultations and provides detailed production estimates before installation begins.
Service Area
BKJ Solar serves the following areas within a 62-mile radius:
Contact Information
Are you BKJ Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.9
35 reviews
Steve R.
BKJ Solar was straightforward and professional from the first call. They helped us choose the right panels for our budget and the installation was completed in one day. The system has been performing above their estimates.
Martha L.
Small local company with big expertise. Joseph and the team took the time to explain every option and never pushed us toward more expensive equipment than we needed. The Enphase monitoring system works great.
Chris W.
We got three quotes and BKJ Solar offered the best price with quality equipment. The crew was efficient and respectful of our property. Our electricity bill has dropped by about 75% since the install.
Frequently Asked Questions About BKJ Solar
What services does BKJ Solar offer?
BKJ Solar offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Grid Connection.
Is BKJ Solar NABCEP certified?
Yes, BKJ Solar is NABCEP certified and also holds Enphase Certified, Generac Dealer certifications. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does BKJ Solar serve?
BKJ Solar serves St. Louis, Florissant, Hazelwood, Ladue, Clayton, Kirkwood, Webster Groves. They are based in St. Louis with a service radius of 100 km.
What warranty does BKJ Solar offer?
BKJ Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are BKJ Solar's customer reviews?
BKJ Solar has a 4.9/5 rating based on 35 customer reviews. Customers consistently rate them highly.
How long has BKJ Solar been in business?
BKJ Solar was founded in 2017 and has been in business for 9 years. They have solid experience in the solar industry.
Similar Installers in St. Louis
Get a Free Solar Quote from BKJ Solar
Fill in your details and we'll connect you with BKJ Solar.
Quote request sent!
BKJ Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile