Bob Heinmiller Solar
NABCEP-certified Orlando solar and electrical contractor with over 30 years of experience
15+
Years in Business
80
Customer Reviews
50 mi
Service Area
2-10
Employees
SurgePV Score
About Bob Heinmiller Solar
Bob Heinmiller Solar Solutions is a licensed solar and electrical contractor based at 1519 W. Smith Street, Building 1 in Orlando, Florida. The Heinmiller family has served Central Florida families and businesses for over 60 years in air conditioning and electrical services, and Bob Heinmiller Solar was incorporated in 2011 to bring affordable solar power to the region.
The company holds NABCEP Certified PV Installation Professional credentials and NABCEP Accredited PV Installation Company status, along with state-certified electrical contractor licensing. Bob Heinmiller Solar installs Panasonic panels, SolarEdge and Enphase inverters, and Generac PWRCell battery storage systems. The company is also an OUC Preferred Contractor.
Bob Heinmiller Solar maintains a 4.6-star rating across review platforms and an A+ BBB rating. The company offers a full range of solar services including PV panel installation, solar air conditioners, solar water heaters, solar attic fans, and battery backup systems for residential and commercial properties throughout the greater Orlando area.
Service Area
Bob Heinmiller Solar serves the following areas within a 50-mile radius:
Contact Information
Are you Bob Heinmiller Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.6
80 reviews
Verified Customer
Bob and his team were extremely professional and knowledgeable. They explained every aspect of the solar installation and the system is performing great.
Verified Customer
Excellent customer service from start to finish. The Heinmiller team handled everything including permits and inspections with no hassle on our end.
Verified Customer
Quality installation and fair pricing. The team was courteous and cleaned up thoroughly after completing the work.
Frequently Asked Questions About Bob Heinmiller Solar
What services does Bob Heinmiller Solar offer?
Bob Heinmiller Solar offers Solar Installation, Battery Storage, Maintenance, system_design.
Is Bob Heinmiller Solar NABCEP certified?
Yes, Bob Heinmiller Solar is NABCEP certified and also holds State Certified Electrical Contractor certification. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Bob Heinmiller Solar serve?
Bob Heinmiller Solar serves Orlando, Winter Park, Altamonte Springs, Kissimmee, Clermont. They are based in Orlando with a service radius of 80 km.
What warranty does Bob Heinmiller Solar offer?
Bob Heinmiller Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Bob Heinmiller Solar's customer reviews?
Bob Heinmiller Solar has a 4.6/5 rating based on 80 customer reviews. Customers consistently rate them highly.
How long has Bob Heinmiller Solar been in business?
Bob Heinmiller Solar was founded in 2011 and has been in business for 15 years. They are one of the more experienced solar installers in their area.
Similar Installers in Orlando
Get a Free Solar Quote from Bob Heinmiller Solar
Fill in your details and we'll connect you with Bob Heinmiller Solar.
Quote request sent!
Bob Heinmiller Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile