Bone Dry Solar
Indianapolis's most reputable local solar company, backed by 30+ years of home improvement excellence from the Bone Dry family
4+
Years in Business
40
Customer Reviews
75 mi
Service Area
51-200
Employees
SurgePV Score
About Bone Dry Solar
Bone Dry Solar is the solar division of Bone Dry Roofing Inc, a trusted Indianapolis home improvement company with over 30 years of experience. Located at 7735 Winton Dr in Indianapolis, Bone Dry Solar provides roof-mounted and ground-mounted solar array installations, off-grid solar systems, battery storage, solar repair, and ongoing maintenance services for homes and businesses across Indiana.
The company leverages its deep roofing expertise to deliver solar installations with a strong emphasis on roof integrity and long-term system performance. Bone Dry Solar is Tesla Battery Certified, Tesla Solar Roof Certified, and one of the few solar contractors approved by Owens Corning. Every project includes a property inspection, customized system design, professional panel installation, and ongoing system monitoring support.
Bone Dry Solar holds a 4.9-star rating on EnergySage and is consistently ranked among the top solar installers in Indianapolis. The company became BBB Accredited in 2023 and offers comprehensive warranties on all installations. Bone Dry Solar benefits from the established customer service infrastructure and reputation of the broader Bone Dry family of companies, which serves multiple locations across Indiana.
Service Area
Bone Dry Solar serves the following areas within a 75-mile radius:
Contact Information
Are you Bone Dry Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.9
40 reviews
Jennifer H.
Bone Dry Solar exceeded our expectations. They already had our trust from a previous roofing project, and the solar installation was just as smooth. System has been running perfectly for three months now.
Robert M.
The team designed a custom system for our home that fits perfectly with our existing roof. Very professional from the initial consultation through final inspection. They handled all the permitting and utility coordination.
Lisa K.
We went with Bone Dry because they know roofs inside and out, which gave us confidence in the solar installation. Fair pricing, excellent communication, and the crew was respectful of our property.
Frequently Asked Questions About Bone Dry Solar
What services does Bone Dry Solar offer?
Bone Dry Solar offers Solar Installation, Battery Storage, Solar Design, Maintenance, Roof Assessment.
Is Bone Dry Solar NABCEP certified?
Bone Dry Solar holds the following certifications: Tesla Battery Certified, Tesla Solar Roof Certified, Owens Corning Approved. Contact them directly for the latest accreditation details.
What areas does Bone Dry Solar serve?
Bone Dry Solar serves Indianapolis, Carmel, Fishers, Noblesville, Greenwood, Lafayette, Fort Wayne, Evansville. They are based in Indianapolis with a service radius of 120 km.
What warranty does Bone Dry Solar offer?
Bone Dry Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Bone Dry Solar's customer reviews?
Bone Dry Solar has a 4.9/5 rating based on 40 customer reviews. Customers consistently rate them highly.
How long has Bone Dry Solar been in business?
Bone Dry Solar was founded in 2022 and has been in business for 4 years. They are a newer entrant in the solar installation market.
Similar Installers in Indianapolis
Get a Free Solar Quote from Bone Dry Solar
Fill in your details and we'll connect you with Bone Dry Solar.
Quote request sent!
Bone Dry Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile