BS

Boston Solar

Over 5,000 solar installations and a decade of experience serving homes and businesses across Massachusetts

Worcester, Massachusetts
4.5 (51 reviews)
Verified
Residential Commercial

15+

Years in Business

5,000+

Projects Completed

51

Customer Reviews

62 mi

Service Area

51-200

Employees

SurgePV Score

8.5 / 10
Customer Reviews
90%
Certifications
75%
Experience
85%
Services Range
100%
Warranty Coverage
80%
Online Presence
75%

About Boston Solar

Boston Solar is one of Massachusetts’ largest residential and commercial solar installation companies, headquartered at 12 Gill Street, Suite 5650 in Woburn, MA. Founded in 2011, the company has completed over 5,000 solar installations across the state, including a dedicated service area covering Worcester and Central Massachusetts.

The company holds NABCEP certification and is approved by the Massachusetts Clean Energy Center. Boston Solar installs systems with Enphase microinverters or SolarEdge optimizers and offers Tesla Powerwall battery storage, EV charging stations, and ongoing system monitoring and maintenance services.

Boston Solar provides free solar assessments and handles the full project lifecycle from design and engineering through permitting, installation, and utility interconnection. The company assists Worcester-area customers with Massachusetts SMART program enrollment, net metering, and available incentives. Office hours are Monday through Friday from 9 AM to 5 PM.

Service Area

Boston Solar serves the following areas within a 62-mile radius:

WorcesterBostonWoburnCambridgeFraminghamLowell

Are you Boston Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Solar Design
Monitoring
Maintenance

Certifications & Accreditations

NABCEP MassCEC Approved

Partner Manufacturers

Inverters

EnphaseSolarEdge

Batteries

Tesla Powerwall

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.5

51 reviews

Kevin R.

22 September 2025
Verified Customer

Boston Solar installed our panels in Worcester and the experience was top-notch. They handled all the paperwork and the system has been generating more than projected.

Diana G.

15 June 2025
Verified Customer

Professional installation and good customer service. The crew was efficient and respectful of our property. Only minor delay was waiting for the utility inspection.

John M.

5 March 2025
Verified Customer

With over 5,000 installs under their belt, the Boston Solar team clearly knows what they are doing. Our Worcester home solar system was installed in one day.

Frequently Asked Questions About Boston Solar

What services does Boston Solar offer?

Boston Solar offers Solar Installation, Battery Storage, EV Charging, Solar Design, Monitoring, Maintenance.

Is Boston Solar NABCEP certified?

Yes, Boston Solar is NABCEP certified and also holds MassCEC Approved certification. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Boston Solar serve?

Boston Solar serves Worcester, Boston, Woburn, Cambridge, Framingham, Lowell. They are based in Worcester with a service radius of 100 km.

What warranty does Boston Solar offer?

Boston Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Boston Solar's customer reviews?

Boston Solar has a 4.5/5 rating based on 51 customer reviews. Customers consistently rate them highly.

How long has Boston Solar been in business?

Boston Solar was founded in 2011 and has been in business for 15 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Boston Solar

Fill in your details and we'll connect you with Boston Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote