Bright Spark Energy
Renewable energy specialists serving Portsmouth with solar panel, battery storage, and EV charging installations
7+
Years in Business
30
Customer Reviews
100 km
Service Area
11-50
Employees
SurgePV Score
About Bright Spark Energy
Bright Spark Energy is a renewable energy specialist based at Office 62 Courtwick Lane, Wick, Littlehampton, BN17 7TL. The company serves Portsmouth and the wider south of England including Brighton, Southampton, and surrounding areas. Bright Spark provides comprehensive renewable energy solutions covering solar panel installation, battery storage, EV charging points, and LED lighting for both residential and commercial customers.
The company holds MCS, NAPIT, and TrustMark accreditations, and all installations are completed by their own certified engineers. Bright Spark focuses on delivering tailored solutions, starting with a free solar site survey to assess each property before recommending the optimal system design. They work with leading manufacturers to supply quality panels and inverters.
Bright Spark Energy has earned strong reviews from customers across Hampshire and West Sussex, with particular praise for their detailed planning, professional installation teams, and responsive aftercare. The company offers a 5-year workmanship warranty alongside manufacturer product warranties, and provides ongoing monitoring support to help customers maximise their energy generation.
Service Area
Bright Spark Energy serves the following areas within a 100 km radius:
Contact Information
Are you Bright Spark Energy?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
4.7
30 reviews
Verified Customer
A fantastic company with fantastic results. I couldn't have had a better experience with the team at Bright Spark. The plans were very detailed, the fitting and handover were very impressive.
Verified Customer
Very professional from the initial consultation through to installation. The team answered all my questions and the system is working brilliantly.
Verified Customer
Excellent service from start to finish. The installation was quick, clean, and the team were very knowledgeable about the best setup for our home.
Frequently Asked Questions About Bright Spark Energy
What services does Bright Spark Energy offer?
Bright Spark Energy offers Solar Installation, Battery Storage, EV Charging, Monitoring.
Is Bright Spark Energy MCS certified?
Yes, Bright Spark Energy is MCS certified and also holds NAPIT, TrustMark certifications. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Bright Spark Energy serve?
Bright Spark Energy serves Portsmouth, Southampton, Brighton, Chichester, Hampshire, West Sussex. They are based in Portsmouth with a service radius of 100 km.
What warranty does Bright Spark Energy offer?
Contact Bright Spark Energy directly for their current warranty terms.
How are Bright Spark Energy's customer reviews?
Bright Spark Energy has a 4.7/5 rating based on 30 customer reviews. Customers consistently rate them highly.
How long has Bright Spark Energy been in business?
Bright Spark Energy was founded in 2019 and has been in business for 7 years. They have solid experience in the solar industry.
Similar Installers in Portsmouth
Get a Free Solar Quote from Bright Spark Energy
Fill in your details and we'll connect you with Bright Spark Energy.
Quote request sent!
Bright Spark Energy will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile