Brilliant Harvest
NABCEP-certified and Tesla Energy Certified solar installer serving Southwest Florida since 2009
17+
Years in Business
15
Customer Reviews
62 mi
Service Area
11-50
Employees
SurgePV Score
About Brilliant Harvest
Brilliant Harvest is a locally owned and operated solar energy company headquartered at 1718 Independence Blvd D, Sarasota, FL 34234. Founded in 2009 by William B. Johnson, who has lived in Sarasota for nearly 40 years, the company is state certified, NABCEP certified, and a Tesla Energy Certified Installer.
The company designs, develops, constructs, and operates solar PV and battery storage systems for residential and commercial customers across Southwest Florida. Brilliant Harvest installs Tesla Solar Roof tiles and Tesla Powerwall battery systems, and the company’s president was elected president of the Florida Solar Energy Industries Association (FlaSEIA) in 2024. Since mid-2022, Brilliant Harvest has collaborated with Roofing by Curry on Tesla Solar Tile Roof installations, completing nine projects including 36 Powerwalls totaling 231 kW.
Brilliant Harvest holds a 5.0-star rating from 15 reviews on the Chamber of Commerce and an A+ BBB rating. The company has been in business for over 16 years and serves Sarasota, Bradenton, Venice, North Port, Palmetto, Nokomis, Osprey, Englewood, and Port Charlotte.
Service Area
Brilliant Harvest serves the following areas within a 62-mile radius:
Contact Information
Are you Brilliant Harvest?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
5
15 reviews
Verified Customer
Brilliant Harvest is probably the most professional and satisfying company I have ever dealt with in the State of Florida. The entire process was seamless from start to finish.
Verified Customer
Excellent work by Bill and the crew. The Tesla Powerwall installation was clean and the system has been performing above expectations since day one.
Verified Customer
From the initial consultation to the final inspection, Brilliant Harvest delivered on every promise. Professional, knowledgeable, and genuinely committed to quality.
Frequently Asked Questions About Brilliant Harvest
What services does Brilliant Harvest offer?
Brilliant Harvest offers Solar Installation, Battery Storage, EV Charging.
Is Brilliant Harvest NABCEP certified?
Yes, Brilliant Harvest is NABCEP certified and also holds Tesla Energy Certified Installer, State Certified Solar Contractor, BBB A+ Rating certifications. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Brilliant Harvest serve?
Brilliant Harvest serves Sarasota, Bradenton, Venice, North Port, Palmetto, Nokomis, Osprey, Englewood and 1 other areas. They are based in Sarasota with a service radius of 100 km.
What warranty does Brilliant Harvest offer?
Brilliant Harvest offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Brilliant Harvest's customer reviews?
Brilliant Harvest has a 5/5 rating based on 15 customer reviews. Customers consistently rate them highly.
How long has Brilliant Harvest been in business?
Brilliant Harvest was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.
Similar Installers in Sarasota
Get a Free Solar Quote from Brilliant Harvest
Fill in your details and we'll connect you with Brilliant Harvest.
Quote request sent!
Brilliant Harvest will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile