CR

Cambridge Renewables

MCS and RECC accredited solar, battery storage, and solar panel supply specialist serving Cambridge and East Anglia

Cambridge, UK
0 (1 reviews)
Verified
Residential Commercial

4+

Years in Business

0

1

Customer Reviews

60 km

Service Area

1-10

Employees

SurgePV Score

5.6 / 10
Customer Reviews
0%
Certifications
75%
Experience
70%
Services Range
90%
Warranty Coverage
63%
Online Presence
75%

About Cambridge Renewables

Cambridge Renewables Limited is a renewable energy company registered in England and Wales (company number 14459645), founded in 2022 and headquartered in Cambridge. The company is fully accredited by MCS and RECC for both battery storage and solar PV technologies, providing customers with consumer protection and insurance-backed workmanship warranties.

Cambridge Renewables serves residential and commercial clients across Cambridge, Newmarket, Bury St Edmunds, and the wider East Anglian region. The company’s solar panel installer team has over 25 years of collective experience and only installs products from established brands with local technical support and long manufacturer warranties.

The company started as a specialist distributor of battery energy storage systems before expanding to offer a full service: consultation, bespoke system design, installation, and ongoing maintenance for homes and SMEs. Customer feedback highlights competitive pricing, high installation quality, and a knowledgeable team that takes time to explain system options in detail.

Services include solar PV installation, battery storage, system monitoring, and maintenance. Cambridge Renewables can be contacted by phone at 01638 750660 or by email at [email protected].

Service Area

Cambridge Renewables serves the following areas within a 60 km radius:

CambridgeNewmarketBury St EdmundsPeterboroughNorwich

Are you Cambridge Renewables?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance
Monitoring

Certifications & Accreditations

MCS RECC

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

0

1 reviews

East Anglia Customer

10 February 2024
Verified Customer

Professional and timely throughout. Very competitive on price and the installation quality was extremely high. Knowledgeable team who took time to explain everything.

Frequently Asked Questions About Cambridge Renewables

What services does Cambridge Renewables offer?

Cambridge Renewables offers Solar Installation, Battery Storage, Maintenance, Monitoring.

Is Cambridge Renewables MCS certified?

Yes, Cambridge Renewables is MCS certified and also holds RECC certification. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Cambridge Renewables serve?

Cambridge Renewables serves Cambridge, Newmarket, Bury St Edmunds, Peterborough, Norwich. They are based in Cambridge with a service radius of 60 km.

What warranty does Cambridge Renewables offer?

Cambridge Renewables offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Cambridge Renewables's customer reviews?

Cambridge Renewables has a 0/5 rating based on 1 customer review. See individual reviews on this page for more detail.

How long has Cambridge Renewables been in business?

Cambridge Renewables was founded in 2022 and has been in business for 4 years. They are a newer entrant in the solar installation market.

Get a Free Solar Quote from Cambridge Renewables

Fill in your details and we'll connect you with Cambridge Renewables.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote