Cerretti Electrical
Award-winning certified electricians and solar panel specialists across Aberdeenshire and Angus
2026+
Years in Business
80 km
Service Area
1-10
Employees
SurgePV Score
About Cerretti Electrical
Cerretti Electrical is based at Hillfoot Terrace, Gourdon, Montrose, DD10 0LF, and provides solar panel installation and electrical services across Aberdeenshire, Angus, and Dundee. The company is certified by NICEIC and MCS, and also holds Tesla and ChargePoint certifications for EV charging installation.
The team installs solar PV systems for domestic and commercial properties and offers battery storage integration, EV charge point installation, and ongoing maintenance. Their service area spans a wide corridor from Aberdeen southward through Stonehaven, Montrose, and Brechin into Angus and Dundee.
In 2025, Cerretti Electrical was named Best Small Trades Business at the Trades Awards, an independent recognition of the company’s quality of work and customer service. Customer reviews consistently rate the team highly, with homeowners reporting seamless installations, excellent communication throughout the process, and competitive pricing. One reviewer described their solar installation as “completely over the moon” with the work.
Cerretti Electrical’s NICEIC and MCS accreditations mean all solar installations qualify for the Smart Export Guarantee tariff and meet UK safety standards. The team handles everything from initial roof survey and system design through to grid connection and commissioning. Customers can contact Cerretti Electrical on 07590 266272 to arrange a free survey.
Service Area
Cerretti Electrical serves the following areas within a 80 km radius:
Contact Information
Are you Cerretti Electrical?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Inverters
Batteries
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
0
0 reviews
Local Customer
Frazer and his team are 5 star in terms of communication, workmanship and price.
Local Customer
Cerretti Electrical provided the best quote for our needs, came when they said, extremely tidy job with no hidden costs.
Frequently Asked Questions About Cerretti Electrical
What services does Cerretti Electrical offer?
Cerretti Electrical offers Solar Installation, Battery Storage, EV Charging, Maintenance.
Is Cerretti Electrical MCS certified?
Yes, Cerretti Electrical is MCS certified and also holds NICEIC certification. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Cerretti Electrical serve?
Cerretti Electrical serves Aberdeen, Aberdeenshire, Montrose, Brechin, Dundee, Angus. They are based in Aberdeen with a service radius of 80 km.
What warranty does Cerretti Electrical offer?
Cerretti Electrical offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Cerretti Electrical's customer reviews?
Cerretti Electrical does not have any reviews yet. Be the first to leave a review after using their services.
How long has Cerretti Electrical been in business?
Cerretti Electrical was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.
Similar Installers in Aberdeen
Get a Free Solar Quote from Cerretti Electrical
Fill in your details and we'll connect you with Cerretti Electrical.
Quote request sent!
Cerretti Electrical will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile