CS

CMI Solar & Electric

Delaware electrical and solar contractor serving the region since 1998

Wilmington, Delaware
4.9 (58 reviews)
Verified
Residential Commercial

28+

Years in Business

0

58

Customer Reviews

37 mi

Service Area

11-50

Employees

SurgePV Score

8.1 / 10
Customer Reviews
98%
Certifications
60%
Experience
100%
Services Range
75%
Warranty Coverage
80%
Online Presence
50%

About CMI Solar & Electric

CMI Solar & Electric is a full-service electrical and solar installation contractor located at 83A Albe Drive, Newark, DE 19702, serving the greater Wilmington area and all of New Castle County. The company has been in business since 1998, providing both electrical and solar energy services to residential and commercial customers.

CMI is BBB accredited and offers comprehensive solar installation services alongside their established electrical contracting business. The company is also a Generac authorized dealer, providing generator and battery backup solutions that integrate with solar installations.

With over 25 years of electrical expertise, CMI brings deep technical knowledge to every solar project, ensuring proper electrical integration and code compliance for installations throughout Delaware and the surrounding region.

Service Area

CMI Solar & Electric serves the following areas within a 37-mile radius:

NewarkWilmingtonNew CastleBearMiddletownHockessin

Are you CMI Solar & Electric?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

BBB Accredited

Partner Manufacturers

Inverters

Generac

Batteries

Generac

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.9

58 reviews

Verified Customer

5 July 2025
Verified Customer

CMI has been our electrician for years and they did an excellent job with our solar installation. Having a licensed electrical contractor handle the entire project gave us peace of mind.

Verified Customer

18 March 2025
Verified Customer

Professional and reliable. CMI handled both the electrical upgrade and solar panel installation efficiently. The Generac backup system works great during outages.

Frequently Asked Questions About CMI Solar & Electric

What services does CMI Solar & Electric offer?

CMI Solar & Electric offers Solar Installation, Battery Storage, Maintenance.

Is CMI Solar & Electric NABCEP certified?

CMI Solar & Electric holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.

What areas does CMI Solar & Electric serve?

CMI Solar & Electric serves Newark, Wilmington, New Castle, Bear, Middletown, Hockessin. They are based in Wilmington with a service radius of 60 km.

What warranty does CMI Solar & Electric offer?

CMI Solar & Electric offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are CMI Solar & Electric's customer reviews?

CMI Solar & Electric has a 4.9/5 rating based on 58 customer reviews. Customers consistently rate them highly.

How long has CMI Solar & Electric been in business?

CMI Solar & Electric was founded in 1998 and has been in business for 28 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from CMI Solar & Electric

Fill in your details and we'll connect you with CMI Solar & Electric.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote