Convert Solar
NABCEP-certified Class A solar contractor serving Richmond with turnkey residential and commercial solar energy solutions
16+
Years in Business
35
Customer Reviews
93 mi
Service Area
11-50
Employees
SurgePV Score
About Convert Solar
Convert Solar is a NABCEP-certified, Class A solar installation contractor with offices in Richmond, Virginia Beach, and Lynchburg, Virginia. The company provides turnkey solar energy solutions for both residential and commercial clients, handling every aspect from system design and engineering through permitting, installation, and utility interconnection. Convert Solar installs panels from REC and Qcells paired with SolarEdge or Enphase inverters and offers Tesla Powerwall battery storage for backup power.
The company’s Richmond office allows it to serve the central Virginia market while its additional locations provide statewide coverage. Convert Solar works with homeowners to evaluate roof conditions, shading, and energy usage before designing a system optimized for maximum production. The company also assists with financing options and handles all paperwork related to utility interconnection and net metering applications.
Convert Solar has earned a 4.6-star rating across review platforms with customers highlighting the company’s NABCEP certification, quality equipment selections, and efficient project timelines. The combination of professional certifications, multiple office locations, and a track record of residential and commercial projects makes Convert Solar a well-established option for Virginia solar customers.
Service Area
Convert Solar serves the following areas within a 93-mile radius:
Contact Information
Are you Convert Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.6
35 reviews
Paul M.
Convert Solar designed a system that fit our budget and roof perfectly. The NABCEP-certified team was professional and the installation was clean. Our electric bill is now a fraction of what it was.
Diane L.
We researched several companies and Convert Solar had the best combination of price and equipment quality. The SolarEdge inverter and REC panels are working great. Responsive customer service throughout the process.
Greg S.
Solid company for our commercial installation. They handled the engineering and permitting efficiently. System was up and running within eight weeks of contract signing.
Frequently Asked Questions About Convert Solar
What services does Convert Solar offer?
Convert Solar offers Solar Installation, Solar Design, Battery Storage, Maintenance, Grid Connection, financing_assistance.
Is Convert Solar NABCEP certified?
Yes, Convert Solar is NABCEP certified and also holds Class A Contractor (VA) certification. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Convert Solar serve?
Convert Solar serves Richmond, Virginia Beach, Norfolk, Hampton Roads, Lynchburg, Henrico. They are based in Richmond with a service radius of 150 km.
What warranty does Convert Solar offer?
Convert Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Convert Solar's customer reviews?
Convert Solar has a 4.6/5 rating based on 35 customer reviews. Customers consistently rate them highly.
How long has Convert Solar been in business?
Convert Solar was founded in 2010 and has been in business for 16 years. They are one of the more experienced solar installers in their area.
Similar Installers in Richmond
Get a Free Solar Quote from Convert Solar
Fill in your details and we'll connect you with Convert Solar.
Quote request sent!
Convert Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile