CE

Creative Energies

Certified B Corporation and NABCEP-certified solar installer serving Utah and Wyoming since 2000

Salt Lake City, Utah
4.7 (120 reviews)
Verified
Residential Commercial

26+

Years in Business

0

120

Customer Reviews

93 mi

Service Area

11-50

Employees

SurgePV Score

9.5 / 10
Customer Reviews
94%
Certifications
90%
Experience
100%
Services Range
100%
Warranty Coverage
80%
Online Presence
100%

About Creative Energies

Creative Energies is a solar installation company founded in 2000 and headquartered at 455 W 1700 S in Salt Lake City, Utah. The company is a Certified B Corporation, meaning it meets rigorous standards for social and environmental performance. Creative Energies has additional offices in Laramie and Lander, Wyoming, serving the entire intermountain region. The team includes more NABCEP-certified practitioners than any other company in the intermountain west.

The company handles residential, commercial, and off-grid solar projects with all design and engineering completed in-house. Creative Energies is a member of the Amicus Solar Cooperative, a Tesla Powerwall certified installer, and a SolarEdge preferred partner. With over two decades in business, the company has built a strong reputation for quality workmanship and transparent communication.

Creative Energies holds an A+ rating with the Better Business Bureau and maintains a 4.7-star average across review platforms. The company employs over 30 people and offers comprehensive warranties including 25-year coverage on panels and inverters plus a 10-year workmanship guarantee on all installations.

Service Area

Creative Energies serves the following areas within a 93-mile radius:

Salt Lake CityPark CityProvoOgdenSandyWest JordanLaramieLander

Are you Creative Energies?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Commercial Solar
Maintenance
Energy Audit

Certifications & Accreditations

NABCEP Certified B Corporation BBB A+

Partner Manufacturers

Panels

SolarEdgeREC

Inverters

SolarEdgeEnphase

Batteries

Tesla Powerwall

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.7

120 reviews

Mark T.

15 November 2025
Verified Customer

Creative Energies handled our 10 kW residential install from start to finish. The NABCEP-certified crew explained every step, and the system has been producing above estimates since day one. Great local company.

Jennifer K.

22 August 2025
Verified Customer

We chose Creative Energies because they are a Certified B Corp and truly care about doing things right. The design process was thorough and the installation was completed in two days. Highly recommend.

David R.

10 March 2025
Verified Customer

Solid company with knowledgeable staff. The permitting took a bit longer than expected but Creative Energies kept us informed throughout. System is performing well after six months.

Frequently Asked Questions About Creative Energies

What services does Creative Energies offer?

Creative Energies offers Solar Installation, Battery Storage, Solar Design, Commercial Solar, Maintenance, Energy Audit.

Is Creative Energies NABCEP certified?

Yes, Creative Energies is NABCEP certified and also holds Certified B Corporation, BBB A+ certifications. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Creative Energies serve?

Creative Energies serves Salt Lake City, Park City, Provo, Ogden, Sandy, West Jordan, Laramie, Lander. They are based in Salt Lake City with a service radius of 150 km.

What warranty does Creative Energies offer?

Creative Energies offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Creative Energies's customer reviews?

Creative Energies has a 4.7/5 rating based on 120 customer reviews. Customers consistently rate them highly.

How long has Creative Energies been in business?

Creative Energies was founded in 2000 and has been in business for 26 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Creative Energies

Fill in your details and we'll connect you with Creative Energies.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote