CE

Croft Electrical and Solar

Family-run NICEIC and MCS-certified solar installer serving Hastings and Eastbourne

Eastbourne, UK
5 (29 reviews)
Verified
Residential

2026+

Years in Business

0

29

Customer Reviews

30 km

Service Area

1-10

Employees

SurgePV Score

8.3 / 10
Customer Reviews
100%
Certifications
90%
Experience
100%
Services Range
60%
Warranty Coverage
63%
Online Presence
50%

About Croft Electrical and Solar

Croft Electrical and Solar is a family-run electrical and solar installation business serving Hastings and Eastbourne in East Sussex. The company is operated by Adam Croft and holds over 15 years of industry experience. Croft Electrical and Solar is NICEIC and MCS certified, and is a member of the Renewable Energy Consumer Code (RECC), which includes a money-back guarantee for added customer assurance.

The company’s work is reviewed annually by NICEIC and MCS to confirm continuing compliance with industry standards. Croft Electrical and Solar installs solar PV systems and battery storage for residential customers across Hastings, Bexhill, Battle, Rye, and Eastbourne. The company is listed on TrustATrader where verified customer reviews are collected.

Customer reviews describe Adam as reliable and professional, with first-class workmanship and a clear process from accurate initial estimates through to completed installation. Two website domains are associated with the company: croftelectricalandsolar.co.uk and solarsolutionshastings.co.uk.

Service Area

Croft Electrical and Solar serves the following areas within a 30 km radius:

EastbourneHastingsBexhill-on-SeaBattleRyeHailsham

Are you Croft Electrical and Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage

Certifications & Accreditations

MCS NICEIC RECC

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

5

29 reviews

TrustATrader Customer

20 June 2024
Verified Customer

Adam has done a great job on my solar panel installation. He is very reliable and I was really pleased with his attitude and workmanship, which was first class.

TrustATrader Customer

15 April 2024
Verified Customer

Adam is excellent and works very hard to provide accurate estimates. His work is brilliant, quick and faultless. Highly recommended.

Frequently Asked Questions About Croft Electrical and Solar

What services does Croft Electrical and Solar offer?

Croft Electrical and Solar offers Solar Installation, Battery Storage.

Is Croft Electrical and Solar MCS certified?

Yes, Croft Electrical and Solar is MCS certified and also holds NICEIC, RECC certifications. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Croft Electrical and Solar serve?

Croft Electrical and Solar serves Eastbourne, Hastings, Bexhill-on-Sea, Battle, Rye, Hailsham. They are based in Eastbourne with a service radius of 30 km.

What warranty does Croft Electrical and Solar offer?

Croft Electrical and Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Croft Electrical and Solar's customer reviews?

Croft Electrical and Solar has a 5/5 rating based on 29 customer reviews. Customers consistently rate them highly.

How long has Croft Electrical and Solar been in business?

Croft Electrical and Solar was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Croft Electrical and Solar

Fill in your details and we'll connect you with Croft Electrical and Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote