DS

Distributive Solar

Nashville-based solar provider serving residential, commercial, and agricultural clients across the Mid-South

Nashville, Tennessee
4.7 (20 reviews)
Verified
Residential Commercial

8+

Years in Business

0

20

Customer Reviews

124 mi

Service Area

1-10

Employees

SurgePV Score

8.1 / 10
Customer Reviews
94%
Certifications
60%
Experience
85%
Services Range
100%
Warranty Coverage
63%
Online Presence
75%

About Distributive Solar

Distributive Solar is a Nashville-based solar company founded by Erik Melang that operates from 810 Dominican Drive, Suite 3000, in Nashville. The company provides residential, commercial, and agricultural solar solutions across the Mid-South region. Distributive Solar also operates under the trade name Nashville Solar Works, focusing on the greater Nashville market.

The company employs NABCEP Board Approved Installers and handles every phase of the solar process, from initial site assessment and system design through permitting, installation, and commissioning. Distributive Solar works with Canadian Solar panels, SolarEdge and Enphase inverters, and Tesla Powerwall battery systems. The company serves both residential customers looking to reduce utility bills and commercial clients seeking to lower operating costs.

Distributive Solar has built a reputation for competitive pricing and personalized service, with customers noting the team’s consultative approach and attention to site-specific design. The company is BBB-listed and serves clients in Nashville, Franklin, Murfreesboro, Clarksville, and surrounding areas across Middle Tennessee.

Service Area

Distributive Solar serves the following areas within a 124-mile radius:

NashvilleFranklinMurfreesboroClarksvilleHendersonvilleCookeville

Are you Distributive Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Energy Audit
Grid Connection
Maintenance

Certifications & Accreditations

NABCEP

Partner Manufacturers

Panels

Canadian Solar

Inverters

SolarEdgeEnphase

Batteries

Tesla Powerwall

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.7

20 reviews

Robert C.

5 September 2025
Verified Customer

Distributive Solar provided top-notch solar consulting services and helped us obtain a quality system at competitive market pricing. The team was professional and thorough from assessment through installation.

Angela D.

18 June 2025
Verified Customer

Erik and the team walked us through every option for our property. The system was designed specifically for our roof orientation and shading conditions. Production numbers have matched the projections closely.

Michael B.

2 April 2025
Verified Customer

Solid installation and good communication. The permitting process was handled entirely by their team, which saved us a lot of time. System has been running smoothly for several months now.

Frequently Asked Questions About Distributive Solar

What services does Distributive Solar offer?

Distributive Solar offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Grid Connection, Maintenance.

Is Distributive Solar NABCEP certified?

Yes, Distributive Solar is NABCEP certified. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Distributive Solar serve?

Distributive Solar serves Nashville, Franklin, Murfreesboro, Clarksville, Hendersonville, Cookeville. They are based in Nashville with a service radius of 200 km.

What warranty does Distributive Solar offer?

Distributive Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Distributive Solar's customer reviews?

Distributive Solar has a 4.7/5 rating based on 20 customer reviews. Customers consistently rate them highly.

How long has Distributive Solar been in business?

Distributive Solar was founded in 2018 and has been in business for 8 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Distributive Solar

Fill in your details and we'll connect you with Distributive Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote