DS

Dunstable Solar

MCS-certified solar panel and battery storage specialists serving Luton and Bedfordshire

Luton, UK
0 (0 reviews)
Verified
Residential

2026+

Years in Business

0

40 km

Service Area

2-10

Employees

SurgePV Score

5.5 / 10
Customer Reviews
0%
Certifications
60%
Experience
100%
Services Range
75%
Warranty Coverage
63%
Online Presence
50%

About Dunstable Solar

Dunstable Solar is a solar panel installation company based at 218 Dunstable Road, Totternhoe, Dunstable, Bedfordshire, LU6 2AN. The company serves customers in Luton, Dunstable, and the surrounding Bedfordshire and Hertfordshire areas, offering tailored renewable energy solutions for residential properties.

MCS-certified engineers manage every stage of the installation process, from initial site survey and system design through to installation and ongoing support. The company installs premium solar panels and inverters selected for reliable long-term performance and durability. Dunstable Solar provides honest pricing and clear project timelines throughout each installation.

Customers can contact Dunstable Solar by phone at 07854 338162 or by email at [email protected]. The company focuses on providing local support to Luton and Dunstable homeowners looking to reduce their energy bills through solar PV and battery storage systems.

Service Area

Dunstable Solar serves the following areas within a 40 km radius:

LutonDunstableBedfordshireHertfordshire

Are you Dunstable Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

MCS

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About Dunstable Solar

What services does Dunstable Solar offer?

Dunstable Solar offers Solar Installation, Battery Storage, Maintenance.

Is Dunstable Solar MCS certified?

Yes, Dunstable Solar is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Dunstable Solar serve?

Dunstable Solar serves Luton, Dunstable, Bedfordshire, Hertfordshire. They are based in Luton with a service radius of 40 km.

What warranty does Dunstable Solar offer?

Dunstable Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Dunstable Solar's customer reviews?

Dunstable Solar does not have any reviews yet. Be the first to leave a review after using their services.

How long has Dunstable Solar been in business?

Dunstable Solar was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Dunstable Solar

Fill in your details and we'll connect you with Dunstable Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote