E-Verve Energy
Most Trusted Renewable Energy Installer North West 2024, serving Chester and all of Cheshire
2026+
Years in Business
20,000+
Projects Completed
151
Customer Reviews
80 km
Service Area
51-200
Employees
SurgePV Score
About E-Verve Energy
E-Verve Energy is an award-winning renewable energy installer serving Chester and all boroughs of Cheshire, including Warrington, Wilmslow, Widnes, Runcorn, Macclesfield, Northwich, Nantwich, Crewe, Winsford, Congleton, Neston, and Ellesmere Port. The company has delivered over 20,000 installations across the UK and was named Most Trusted Renewable Energy Installer (North West) 2024 as well as Renewable Energy Provider of the Year (North West) 2023 and Green Business of the Year in 2021 and 2022.
E-Verve holds a full set of accreditations: MCS, NAPIT, RECC, OZEV (for EV charging), and TrustMark. This range of certifications covers every type of installation the company offers — solar PV, battery storage, and home EV chargers — and subjects the company to independent annual audit.
The team has been serving Cheshire for over 10 years. Customer reviews highlight punctuality, professionalism, and the quality of installation work. E-Verve manages the full process from initial survey through to commissioning, including DNO applications and Smart Export Guarantee registration. The company can be contacted through e-verveenergy.co.uk or by email at [email protected].
Service Area
E-Verve Energy serves the following areas within a 80 km radius:
Contact Information
Are you E-Verve Energy?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Batteries
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
4.9
151 reviews
Verified Customer
The two engineers from E-Verve Energy were punctual, polite and the standard of the installation was excellent.
Verified Customer
The team on the day were very professional and worked very hard. Very happy with the whole process.
Frequently Asked Questions About E-Verve Energy
What services does E-Verve Energy offer?
E-Verve Energy offers Solar Installation, Battery Storage, EV Charging.
Is E-Verve Energy MCS certified?
Yes, E-Verve Energy is MCS certified and also holds NAPIT, RECC, OZEV, TrustMark certifications. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does E-Verve Energy serve?
E-Verve Energy serves Chester, Warrington, Wilmslow, Widnes, Runcorn, Macclesfield, Northwich, Nantwich and 2 other areas. They are based in Chester with a service radius of 80 km.
What warranty does E-Verve Energy offer?
E-Verve Energy offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are E-Verve Energy's customer reviews?
E-Verve Energy has a 4.9/5 rating based on 151 customer reviews. Customers consistently rate them highly.
How long has E-Verve Energy been in business?
E-Verve Energy was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.
Similar Installers in Chester
Get a Free Solar Quote from E-Verve Energy
Fill in your details and we'll connect you with E-Verve Energy.
Quote request sent!
E-Verve Energy will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile