EE

EDGE Energy

Six-time ENERGY STAR Contractor of the Year with 5,000+ solar and electrification projects since 2006

Washington, District of Columbia
4.8 (31 reviews)
Verified
Residential Commercial

20+

Years in Business

5,000+

Projects Completed

31

Customer Reviews

62 mi

Service Area

51-200

Employees

SurgePV Score

8.8 / 10
Customer Reviews
96%
Certifications
75%
Experience
100%
Services Range
90%
Warranty Coverage
80%
Online Presence
75%

About EDGE Energy

EDGE Energy is a solar and home electrification contractor headquartered at 6854 Distribution Drive in Beltsville, Maryland, serving the Washington DC, Maryland, and Virginia metro area. Founded in 2006, the company has completed over 5,000 projects and earned the ENERGY STAR Contractor of the Year designation from the U.S. EPA six consecutive times.

The company is an authorized SunPower dealer, installing SunPower X-Series and U-Series panels paired with SunVault battery storage systems. Beyond solar, EDGE Energy provides heat pump installations, insulation, air sealing, duct work, energy audits, and roofing services as part of their whole-home electrification approach.

EDGE Energy offers a 100% satisfaction guarantee on all installations and provides financing options for residential and commercial projects across the DMV region.

Service Area

EDGE Energy serves the following areas within a 62-mile radius:

WashingtonBeltsvilleCollege ParkSilver SpringRockvilleBethesdaArlingtonAlexandria

Are you EDGE Energy?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Energy Audit
Maintenance
Solar Design

Certifications & Accreditations

ENERGY STAR Contractor of the Year (6x) SunPower Authorized Dealer

Partner Manufacturers

Panels

SunPower

Inverters

SunPower

Batteries

SunVault

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

31 reviews

Patricia W.

10 August 2025
Verified Customer

EDGE Energy handled everything from the initial energy audit to the final solar installation. As a six-time ENERGY STAR winner, their quality shows in every detail of the work.

Michael D.

22 May 2025
Verified Customer

We chose EDGE for their SunPower partnership and long track record. The installation crew was professional and efficient. System has been performing above projections for three months now.

Sarah L.

14 February 2025
Verified Customer

Excellent work on our solar panel installation. The crew was knowledgeable and completed the job on time. Would recommend to anyone in the DC metro area.

Frequently Asked Questions About EDGE Energy

What services does EDGE Energy offer?

EDGE Energy offers Solar Installation, Battery Storage, Energy Audit, Maintenance, Solar Design.

Is EDGE Energy NABCEP certified?

EDGE Energy holds the following certifications: ENERGY STAR Contractor of the Year (6x), SunPower Authorized Dealer. Contact them directly for the latest accreditation details.

What areas does EDGE Energy serve?

EDGE Energy serves Washington, Beltsville, College Park, Silver Spring, Rockville, Bethesda, Arlington, Alexandria. They are based in Washington with a service radius of 100 km.

What warranty does EDGE Energy offer?

EDGE Energy offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are EDGE Energy's customer reviews?

EDGE Energy has a 4.8/5 rating based on 31 customer reviews. Customers consistently rate them highly.

How long has EDGE Energy been in business?

EDGE Energy was founded in 2006 and has been in business for 20 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from EDGE Energy

Fill in your details and we'll connect you with EDGE Energy.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote