E

Electrasolar

MCS certified solar PV design, installation, and maintenance specialist based in Alconbury, Cambridgeshire

Cambridge, UK
0 (0 reviews)
Verified
Residential Commercial

15+

Years in Business

0

60 km

Service Area

1-10

Employees

SurgePV Score

5.4 / 10
Customer Reviews
0%
Certifications
60%
Experience
85%
Services Range
90%
Warranty Coverage
63%
Online Presence
50%

About Electrasolar

Electrasolar Ltd is a Cambridgeshire-based solar PV design, installation, and servicing company, registered at 51 Manor Lane, Alconbury, Cambridgeshire, PE28 4EH (company number 07606031). Founded by Barry Ambrose after his established electrical contracting company began receiving solar installation requests from clients, Electrasolar has grown to serve the whole of East Anglia including Cambridge, Bedford, and Peterborough.

Electrasolar holds MCS certification (ELC-54454) for the design and installation of solar photovoltaic systems, and is a certified SolarEdge installer. The company provides solar PV installation, battery storage, EV charging, system servicing, and maintenance for both domestic and commercial properties.

Customer testimonials on the company’s website consistently highlight the team’s technical skill, tidiness, punctuality, and problem-solving ability on challenging rooftops and sites. Reviewers describe the team as “highly professional” and “knowledgeable,” with a particular strength in bespoke commercial solar PV design.

Services include domestic and commercial solar PV installation, battery storage systems, EV charging points, ongoing maintenance, and system performance monitoring. The company serves Cambridge, Huntingdon, Peterborough, Bedford, and Ely, and can be contacted at [email protected] or by phone on 01480 896137.

Service Area

Electrasolar serves the following areas within a 60 km radius:

CambridgeHuntingdonPeterboroughBedfordEly

Are you Electrasolar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Maintenance
Monitoring

Certifications & Accreditations

MCS

Partner Manufacturers

Inverters

SolarEdge

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

0

0 reviews

Cambridgeshire Customer

20 November 2023
Verified Customer

They worked very efficiently, keeping to all agreed times, kept our house remarkably clean, and the PV system they installed works great. I highly recommend them without any hesitation.

East Anglia Business Owner

5 September 2023
Verified Customer

Highly professional, efficient, and knowledgeable. Creative at problem solving and most of all, highly skilled electricians — as well as being immaculately tidy and considerate.

Frequently Asked Questions About Electrasolar

What services does Electrasolar offer?

Electrasolar offers Solar Installation, Battery Storage, EV Charging, Maintenance, Monitoring.

Is Electrasolar MCS certified?

Yes, Electrasolar is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Electrasolar serve?

Electrasolar serves Cambridge, Huntingdon, Peterborough, Bedford, Ely. They are based in Cambridge with a service radius of 60 km.

What warranty does Electrasolar offer?

Electrasolar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Electrasolar's customer reviews?

Electrasolar does not have any reviews yet. Be the first to leave a review after using their services.

How long has Electrasolar been in business?

Electrasolar was founded in 2011 and has been in business for 15 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Electrasolar

Fill in your details and we'll connect you with Electrasolar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote