Energy Doctors
Home energy efficiency experts offering solar, insulation, and radiant barrier solutions in Salt Lake City since 2010
16+
Years in Business
30
Customer Reviews
50 mi
Service Area
2-10
Employees
SurgePV Score
About Energy Doctors
Energy Doctors is a home energy efficiency company established in 2010 and located at 1578 Manzanita Dr in Salt Lake City, Utah. The company specializes in a comprehensive approach to home energy savings, combining solar panel installation with insulation, radiant barrier solutions, air sealing, and thermal energy audits. With over a decade of experience, Energy Doctors helps Salt Lake City homeowners identify and fix energy waste before adding solar.
The company starts each project with a detailed thermal energy audit to map where a home is losing energy. This diagnostic approach ensures that solar panels are sized appropriately for the home’s actual energy needs after efficiency improvements. Energy Doctors handles residential solar installations from design through permitting and interconnection.
Energy Doctors maintains positive ratings across review platforms, with customers frequently praising the company’s thorough diagnostic process and honest recommendations. The company offers manufacturer warranties on all solar equipment plus a workmanship guarantee on installations. Their Monday through Friday availability and responsive communication make them a reliable choice for Salt Lake City homeowners.
Service Area
Energy Doctors serves the following areas within a 50-mile radius:
Contact Information
Are you Energy Doctors?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
30 reviews
Tom R.
Energy Doctors did a thorough energy audit of our home before recommending solar. They identified insulation issues first, then installed solar panels. Our energy savings have been significant.
Linda K.
Fast, thorough, and friendly. The team diagnosed our energy waste problems and recommended practical solutions. The solar installation was clean and professional. Great local company.
Michael F.
Good company that takes an energy-efficiency-first approach. They addressed our insulation needs before putting panels on the roof. The solar system is producing well and our bills are much lower.
Frequently Asked Questions About Energy Doctors
What services does Energy Doctors offer?
Energy Doctors offers Solar Installation, Energy Audit, Maintenance.
Is Energy Doctors NABCEP certified?
Energy Doctors holds the following certifications: None listed. Contact them directly for the latest accreditation details.
What areas does Energy Doctors serve?
Energy Doctors serves Salt Lake City, Murray, Sandy, West Valley City, Taylorsville, Millcreek. They are based in Salt Lake City with a service radius of 80 km.
What warranty does Energy Doctors offer?
Energy Doctors offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Energy Doctors's customer reviews?
Energy Doctors has a 4.5/5 rating based on 30 customer reviews. Customers consistently rate them highly.
How long has Energy Doctors been in business?
Energy Doctors was founded in 2010 and has been in business for 16 years. They are one of the more experienced solar installers in their area.
Similar Installers in Salt Lake City
Get a Free Solar Quote from Energy Doctors
Fill in your details and we'll connect you with Energy Doctors.
Quote request sent!
Energy Doctors will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile