ES

ES Solar

Utah's top-rated NABCEP-certified solar installer with offices in Salt Lake City and Layton since 2009

Salt Lake City, Utah
4.8 (86 reviews)
Verified
Residential Commercial

17+

Years in Business

0

86

Customer Reviews

93 mi

Service Area

11-50

Employees

SurgePV Score

9.1 / 10
Customer Reviews
96%
Certifications
90%
Experience
100%
Services Range
90%
Warranty Coverage
80%
Online Presence
75%

About ES Solar

ES Solar is a solar installation company co-founded in 2009 by Chris Loock and Jeff Dimond, with a Salt Lake City office at 1160 S Pioneer Rd Suite 1 and headquarters at 245 E 2150 N in Layton, Utah. The company was rated the number one Utah solar installer by Forbes and has built a strong reputation across the state. All ES Solar professional installers are NABCEP-certified.

The company specializes in residential and commercial solar installations using SolarEdge tier-1 equipment, which is designed and tested to produce energy consistently even in poor weather conditions. ES Solar also installs Sonnen battery storage systems and handles all aspects of the solar process from design and engineering through permitting and utility interconnection.

ES Solar holds an A+ rating with the Better Business Bureau and maintains a 98% recommendation rate on Facebook from nearly 2,000 reviews. The company has expanded to serve customers across Utah and surrounding states while maintaining the personalized service of a local installer. ES Solar offers 25-year warranties on panels and inverters plus a 10-year workmanship guarantee.

Service Area

ES Solar serves the following areas within a 93-mile radius:

Salt Lake CityLaytonOgdenProvoPark CitySandyWest JordanDraper

Are you ES Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance
Monitoring
Solar Design

Certifications & Accreditations

NABCEP BBB A+ SolarEdge Certified

Partner Manufacturers

Panels

SolarEdge

Inverters

SolarEdge

Batteries

Sonnen

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

86 reviews

Greg H.

3 November 2025
Verified Customer

ES Solar knocked it out of the park. NABCEP-certified installers who clearly know their craft. The SolarEdge system they recommended has been outperforming projections by about 10%. Great company.

Michelle D.

15 August 2025
Verified Customer

We got multiple quotes and ES Solar offered the best combination of quality equipment and fair pricing. The crew was respectful of our property and finished in one day. Very impressed.

Robert L.

20 February 2025
Verified Customer

Professional company with knowledgeable staff. The system has been running perfectly for six months. Only reason for four stars is the initial scheduling took a bit longer than expected.

Frequently Asked Questions About ES Solar

What services does ES Solar offer?

ES Solar offers Solar Installation, Battery Storage, Maintenance, Monitoring, Solar Design.

Is ES Solar NABCEP certified?

Yes, ES Solar is NABCEP certified and also holds BBB A+, SolarEdge Certified certifications. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does ES Solar serve?

ES Solar serves Salt Lake City, Layton, Ogden, Provo, Park City, Sandy, West Jordan, Draper. They are based in Salt Lake City with a service radius of 150 km.

What warranty does ES Solar offer?

ES Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are ES Solar's customer reviews?

ES Solar has a 4.8/5 rating based on 86 customer reviews. Customers consistently rate them highly.

How long has ES Solar been in business?

ES Solar was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from ES Solar

Fill in your details and we'll connect you with ES Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote