EP

Evergreen Power UK

MCS-certified solar, battery, heat pump, and air conditioning specialists operating nationwide since 2013

London, UK
4 (654 reviews)
Verified
Residential

13+

Years in Business

654

Customer Reviews

300 km

Service Area

SurgePV Score

7.6 / 10
Customer Reviews
80%
Certifications
100%
Experience
85%
Services Range
60%
Warranty Coverage
0%
Online Presence
100%

About Evergreen Power UK

Evergreen Power UK is a solar panel, battery storage, heat pump, and air conditioning specialist headquartered at 63 Jarvis Road, South Croydon, CR2 6HW. Founded in 2013, the company has grown from a family-run business to a national operation with installation depots in London, Leicester, Warrington, Exeter, and Glasgow. Evergreen Power UK brings over a decade of experience to residential solar and energy projects across the country.

The company holds MCS, NAPIT, HIES, TrustMark, and ePVS accreditations. Evergreen Power UK’s installers are fully certified to design, install, and commission solar PV and battery storage systems to government-backed quality standards. The company also installs air source heat pumps and Bosch air conditioning systems alongside its core solar offering.

On Trustpilot, Evergreen Power UK holds a 4-star rating from 654 reviews. Positive reviews highlight competitive pricing, knowledgeable surveyors, and professional installation teams who complete work efficiently and tidily. The company reports over 1,500 five-star reviews across all platforms. Office hours are Monday to Friday, 9am to 6pm.

Service Area

Evergreen Power UK serves the following areas within a 300 km radius:

LondonCroydonLeicesterWarringtonExeterGlasgow

Are you Evergreen Power UK?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage

Certifications & Accreditations

MCS NAPIT HIES TrustMark

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

4

654 reviews

Verified Customer

1 August 2025
Verified Customer

Evergreen Power were one of eight companies I contacted regarding a Solar PV and Battery installation. Not only was their quote extremely competitive but the surveyor was honest with me and very knowledgeable.

Verified Customer

15 July 2025
Verified Customer

Very professional from first interaction with surveyor to the very end. Installation done in one day and quality is good. The electrician went above and beyond and ensured there was no cabling visible around the front of the house.

Verified Customer

20 June 2025
Verified Customer

I had solar panels installed this week. Would 100% recommend them. Friendly, kind and professional. Everything was explained very clearly and price was excellent.

Frequently Asked Questions About Evergreen Power UK

What services does Evergreen Power UK offer?

Evergreen Power UK offers Solar Installation, Battery Storage.

Is Evergreen Power UK MCS certified?

Yes, Evergreen Power UK is MCS certified and also holds NAPIT, HIES, TrustMark certifications. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Evergreen Power UK serve?

Evergreen Power UK serves London, Croydon, Leicester, Warrington, Exeter, Glasgow. They are based in London with a service radius of 300 km.

What warranty does Evergreen Power UK offer?

Contact Evergreen Power UK directly for their current warranty terms.

How are Evergreen Power UK's customer reviews?

Evergreen Power UK has a 4/5 rating based on 654 customer reviews. They are well-regarded by their customers.

How long has Evergreen Power UK been in business?

Evergreen Power UK was founded in 2013 and has been in business for 13 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Evergreen Power UK

Fill in your details and we'll connect you with Evergreen Power UK.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote