FC

First Class Solar

MCS certified solar specialists for homes and businesses in Northern Ireland

Belfast, UK
5 (15 reviews)
Verified
Residential Commercial

2026+

Years in Business

0

15

Customer Reviews

60 km

Service Area

1-10

Employees

SurgePV Score

8.8 / 10
Customer Reviews
100%
Certifications
75%
Experience
100%
Services Range
75%
Warranty Coverage
63%
Online Presence
100%

About First Class Solar

First Class Solar is based at 36 Sans Souci Park, Belfast, BT9 5BZ, serving residential and commercial customers across Northern Ireland. The company is MCS certified and a member of the Renewable Energy Consumer Code (RECC), ensuring all installations qualify for the Smart Export Guarantee and are backed by independent consumer protection.

The installation team brings over 14 years of combined renewables experience in Northern Ireland, and the company’s founder has additional hands-on solar experience from both Western Australia and Northern Ireland. This international exposure has informed a focus on high-efficiency panel selection and system design optimised for Northern Ireland’s variable climate. Partner brands include JA Solar and Jinko Solar panels, Growatt and Solis inverters, and Duracell Energy batteries.

First Class Solar offers both domestic and commercial solar panel installations and handles all aspects of the project from initial design through to NIE export registration. The company’s approach prioritises using only MCS-certified equipment, which gives customers confidence in product quality across every component. Financing options and 0% VAT on domestic installations make the upfront cost more accessible for homeowners considering solar for the first time.

Service Area

First Class Solar serves the following areas within a 60 km radius:

BelfastLisburnNewtownardsAntrimNewry

Are you First Class Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

MCS RECC

Partner Manufacturers

Panels

JA SolarJinko Solar

Inverters

GrowattSolis

Batteries

Duracell Energy

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About First Class Solar

What services does First Class Solar offer?

First Class Solar offers Solar Installation, Battery Storage, Maintenance.

Is First Class Solar MCS certified?

Yes, First Class Solar is MCS certified and also holds RECC certification. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does First Class Solar serve?

First Class Solar serves Belfast, Lisburn, Newtownards, Antrim, Newry. They are based in Belfast with a service radius of 60 km.

What warranty does First Class Solar offer?

First Class Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are First Class Solar's customer reviews?

First Class Solar has a 5/5 rating based on 15 customer reviews. Customers consistently rate them highly.

How long has First Class Solar been in business?

First Class Solar was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from First Class Solar

Fill in your details and we'll connect you with First Class Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote