Future Power Team
Family-run Yorkshire solar installer with 900+ installations and consistent 5-star reviews
7+
Years in Business
34
Customer Reviews
80 km
Service Area
2-10
Employees
SurgePV Score
About Future Power Team
Future Power Team is a family-run solar installation business based at 3 Park Square East, Leeds LS1 2NE. Founded in 2019 by industry professionals from the renewable energy sector, the company has completed nearly 900 installations across Yorkshire, fitting over 12,000 solar panels. They operate with a no-salespeople policy, focusing instead on honest advice and transparent pricing.
The company is fully MCS and NAPIT certified, and a member of RECC, ensuring installations meet strict industry standards and consumer protection rules. Every installation includes scaffolding, MCS certification, DNO approval, Building Control notification, and a five-year insurance-backed workmanship warranty. They serve residential retrofit projects through to megawatt commercial PPA installations.
Future Power Team holds a 4.6-star rating on Trustpilot from 34 reviews, with customers consistently praising clear communication, knowledgeable staff, and the quality of finished work. The company does not require deposits before installation begins, reducing financial risk for customers.
Service Area
Future Power Team serves the following areas within a 80 km radius:
Contact Information
Are you Future Power Team?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Warranty Coverage
25 years
10 years
5 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
4.6
34 reviews
Patricia Andrew
Kane and the whole team were very friendly, knowledgeable and professional from start to finish.
Jakub
I'm pleased with the whole process. It was well explained at the planning time, and I was able to ask lots of questions.
Jay Mag
The experience was excellent. Kane explained my options and gave me suggestions considering my budget.
Frequently Asked Questions About Future Power Team
What services does Future Power Team offer?
Future Power Team offers Solar Installation, Battery Storage, EV Charging.
Is Future Power Team MCS certified?
Yes, Future Power Team is MCS certified and also holds NAPIT, RECC certifications. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Future Power Team serve?
Future Power Team serves Leeds, Sheffield, Harrogate, York, Bradford, Wakefield. They are based in Leeds with a service radius of 80 km.
What warranty does Future Power Team offer?
Future Power Team offers 25-year panel warranty, 10-year inverter warranty, and 5-year installation/workmanship warranty.
How are Future Power Team's customer reviews?
Future Power Team has a 4.6/5 rating based on 34 customer reviews. Customers consistently rate them highly.
How long has Future Power Team been in business?
Future Power Team was founded in 2019 and has been in business for 7 years. They have solid experience in the solar industry.
Similar Installers in Leeds
Get a Free Solar Quote from Future Power Team
Fill in your details and we'll connect you with Future Power Team.
Quote request sent!
Future Power Team will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile