GenPro Energy Solutions
Tesla and Generac certified solar installer serving Nebraska since 2007
19+
Years in Business
20
Customer Reviews
186 mi
Service Area
11-50
Employees
SurgePV Score
About GenPro Energy Solutions
GenPro Energy Solutions is a solar installation company that has served Nebraska since 2007. The company is headquartered in Piedmont, South Dakota, and provides residential and commercial solar installations throughout Nebraska, including the Omaha and Lincoln metro areas.
GenPro Energy Solutions is both Tesla and Generac certified, allowing them to install and service Tesla Powerwall and Generac PWRcell battery storage systems alongside solar panel arrays. The company has been recognized as one of the most affordable solar installers in Nebraska, offering competitive pricing without compromising on equipment quality.
GenPro handles the full installation process from initial consultation and site assessment through system design, permitting, installation, and utility interconnection. The company serves customers across the entire state of Nebraska and has built a reputation for providing reliable solar solutions at accessible price points.
Service Area
GenPro Energy Solutions serves the following areas within a 186-mile radius:
Contact Information
Are you GenPro Energy Solutions?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Batteries
Warranty Coverage
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.3
20 reviews
Verified Customer
GenPro Energy installed a solar system with battery backup at our home. The team was professional and the system is producing more energy than expected.
Verified Customer
Good value for the price. GenPro offered competitive pricing and the installation was completed efficiently. The Tesla Powerwall integration works well.
Verified Customer
Solid solar installation from GenPro. They covered the entire state and were willing to travel to our location. Happy with the energy production.
Frequently Asked Questions About GenPro Energy Solutions
What services does GenPro Energy Solutions offer?
GenPro Energy Solutions offers Solar Installation, Battery Storage.
Is GenPro Energy Solutions NABCEP certified?
GenPro Energy Solutions holds the following certifications: Tesla Certified Installer, Generac Certified Installer. Contact them directly for the latest accreditation details.
What areas does GenPro Energy Solutions serve?
GenPro Energy Solutions serves Omaha, Lincoln, Central City, Grand Island, Kearney. They are based in Omaha with a service radius of 300 km.
What warranty does GenPro Energy Solutions offer?
GenPro Energy Solutions offers 25-year panel warranty, and 10-year installation/workmanship warranty.
How are GenPro Energy Solutions's customer reviews?
GenPro Energy Solutions has a 4.3/5 rating based on 20 customer reviews. They are well-regarded by their customers.
How long has GenPro Energy Solutions been in business?
GenPro Energy Solutions was founded in 2007 and has been in business for 19 years. They are one of the more experienced solar installers in their area.
Similar Installers in Omaha
Get a Free Solar Quote from GenPro Energy Solutions
Fill in your details and we'll connect you with GenPro Energy Solutions.
Quote request sent!
GenPro Energy Solutions will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile