Geo Green Power
Nottingham-based renewable energy installer with 5-star Trustpilot rating and 15+ years of experience
17+
Years in Business
139
Customer Reviews
150 km
Service Area
11-50
Employees
SurgePV Score
About Geo Green Power
Geo Green Power is one of the UK’s leading renewable energy installers, based at Bradmore Business Park, Loughborough Road, Bunny, Nottingham, NG11 6QA. Established in 2009, the company has over 15 years of experience and completes between 1.5MW to 2MW of solar PV systems every month. Their commercial client list includes organisations such as Smeg, Mercedes Benz, JCB, and Kingspan.
The company specialises in all types of solar panel installation including domestic, commercial, roof-mounted, and ground-mounted systems. Geo Green Power also provides heat pump installations, battery storage, EV charging, and other renewable energy technologies. They hold MCS, NAPIT, TrustMark, and RECC accreditations and employ in-house survey, design, and installation teams.
With a 5-star rating on Trustpilot from 139 reviews, Geo Green Power has an outstanding customer satisfaction record. Reviewers consistently praise the company’s professional service, technical expertise, and responsive aftercare. The company provides free site surveys, detailed system designs with energy generation projections, and comprehensive post-installation support.
Service Area
Geo Green Power serves the following areas within a 150 km radius:
Contact Information
Are you Geo Green Power?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
5
139 reviews
Verified Customer
Excellent service from initial consultation through to installation. The team were professional, knowledgeable, and the system is performing above predictions.
Verified Customer
Geo Green Power were brilliant. They explained everything clearly, offered honest advice, and the installation team were efficient and tidy.
Verified Customer
Really impressed with the whole process. The survey was thorough, the design was tailored to our needs, and the install was completed in a day.
Frequently Asked Questions About Geo Green Power
What services does Geo Green Power offer?
Geo Green Power offers Solar Installation, Battery Storage, EV Charging, Maintenance, Monitoring, Energy Audit.
Is Geo Green Power MCS certified?
Yes, Geo Green Power is MCS certified and also holds NAPIT, TrustMark, RECC certifications. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Geo Green Power serve?
Geo Green Power serves Nottingham, Leicester, Derby, Lincoln, Loughborough, Northampton. They are based in Nottingham with a service radius of 150 km.
What warranty does Geo Green Power offer?
Contact Geo Green Power directly for their current warranty terms.
How are Geo Green Power's customer reviews?
Geo Green Power has a 5/5 rating based on 139 customer reviews. Customers consistently rate them highly.
How long has Geo Green Power been in business?
Geo Green Power was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.
Similar Installers in Nottingham
Get a Free Solar Quote from Geo Green Power
Fill in your details and we'll connect you with Geo Green Power.
Quote request sent!
Geo Green Power will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile