GG

Geo Green Power

Nationwide MCS-certified commercial and residential solar installer serving Ipswich

Ipswich, UK
4.7 (172 reviews)
Verified
Residential Commercial Industrial

2026+

Years in Business

0

172

Customer Reviews

100 km

Service Area

51-200

Employees

SurgePV Score

8.8 / 10
Customer Reviews
94%
Certifications
100%
Experience
100%
Services Range
90%
Warranty Coverage
63%
Online Presence
50%

About Geo Green Power

Geo Green Power is a national renewable energy company with an in-house, MCS-certified team delivering solar PV installation, design, and maintenance services to commercial and domestic customers in Ipswich and across the East of England. The company operates nationally from its Midlands base and can be contacted on 01509 880199 or by email at [email protected].

The company holds a comprehensive set of accreditations including MCS, NICEIC Approved Contractor status, CHAS certification, RECC membership, and ISO 9001 and ISO 14001 quality and environmental management system certifications. Their team specialises in roof-mounted and ground-mounted solar PV systems, multi-site commercial schemes, and ongoing maintenance contracts for existing solar arrays.

Geo Green Power is particularly active in the commercial solar market, handling projects for businesses, farms, and industrial properties in the Ipswich and wider East Anglia region. Residential customers can also request surveys through the company’s website at geogreenpower.com. All installations are carried out by directly employed engineers rather than subcontractors.

Service Area

Geo Green Power serves the following areas within a 100 km radius:

IpswichColchesterCambridgeNorwichChelmsford

Are you Geo Green Power?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance
Monitoring

Certifications & Accreditations

MCS NICEIC CHAS RECC

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About Geo Green Power

What services does Geo Green Power offer?

Geo Green Power offers Solar Installation, Battery Storage, Maintenance, Monitoring.

Is Geo Green Power MCS certified?

Yes, Geo Green Power is MCS certified and also holds NICEIC, CHAS, RECC certifications. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Geo Green Power serve?

Geo Green Power serves Ipswich, Colchester, Cambridge, Norwich, Chelmsford. They are based in Ipswich with a service radius of 100 km.

What warranty does Geo Green Power offer?

Geo Green Power offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Geo Green Power's customer reviews?

Geo Green Power has a 4.7/5 rating based on 172 customer reviews. Customers consistently rate them highly.

How long has Geo Green Power been in business?

Geo Green Power was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Geo Green Power

Fill in your details and we'll connect you with Geo Green Power.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote