Geo Green Power
Leading UK renewable energy installer with 5-star Trustpilot rating, serving Leicester from their Nottingham base since 2009
17+
Years in Business
139
Customer Reviews
150 km
Service Area
11-50
Employees
SurgePV Score
About Geo Green Power
Geo Green Power is one of the UK’s leading renewable energy installers, based at Bradmore Business Park, Loughborough Road, Bunny, Nottingham, NG11 6QA. Located approximately 30 minutes from Leicester, the company has been serving Leicestershire customers since its founding in 2009. With over 15 years of experience, Geo Green Power completes between 1.5MW to 2MW of solar PV installations every month.
The company provides commercial solar installation services in Leicester and surrounding areas, as well as domestic installations. Geo Green Power holds MCS, NAPIT, TrustMark, and RECC accreditations, and their client list includes major brands such as Smeg, Mercedes Benz, JCB, and Kingspan. Services include solar PV, battery storage, heat pumps, EV charging, and energy auditing.
With a 5-star rating on Trustpilot from 139 reviews, Geo Green Power is one of the most highly rated solar installers serving Leicestershire. Customers praise the thorough survey process, honest advice, and quality of installation work. The company provides free site surveys and comprehensive aftercare support.
Service Area
Geo Green Power serves the following areas within a 150 km radius:
Contact Information
Are you Geo Green Power?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
5
139 reviews
Verified Customer
Excellent experience from survey to completion. The team designed the perfect system for our Leicester home and the installation was completed in a single day.
Verified Customer
Very professional and knowledgeable. Clear advice, no hard sell, and quality installation. Highly recommended.
Verified Customer
From initial enquiry to completion, the process was smooth and efficient. The team were friendly and the workmanship was outstanding.
Frequently Asked Questions About Geo Green Power
What services does Geo Green Power offer?
Geo Green Power offers Solar Installation, Battery Storage, EV Charging, Maintenance, Monitoring, Energy Audit.
Is Geo Green Power MCS certified?
Yes, Geo Green Power is MCS certified and also holds NAPIT, TrustMark, RECC certifications. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Geo Green Power serve?
Geo Green Power serves Leicester, Nottingham, Loughborough, Derby, Northampton, Leicestershire. They are based in Leicester with a service radius of 150 km.
What warranty does Geo Green Power offer?
Contact Geo Green Power directly for their current warranty terms.
How are Geo Green Power's customer reviews?
Geo Green Power has a 5/5 rating based on 139 customer reviews. Customers consistently rate them highly.
How long has Geo Green Power been in business?
Geo Green Power was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.
Similar Installers in Leicester
Get a Free Solar Quote from Geo Green Power
Fill in your details and we'll connect you with Geo Green Power.
Quote request sent!
Geo Green Power will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile