GS

Go Solar Rhode Island

Providence-based solar installer specializing in residential and commercial systems with 24/7 phone availability

Providence, Rhode Island
4.6 (30 reviews)
Verified
Residential Commercial

8+

Years in Business

300+

Projects Completed

30

Customer Reviews

37 mi

Service Area

1-10

Employees

SurgePV Score

8 / 10
Customer Reviews
92%
Certifications
60%
Experience
85%
Services Range
100%
Warranty Coverage
80%
Online Presence
50%

About Go Solar Rhode Island

Go Solar Rhode Island is a solar installation company based at 1279 Chalkstone Avenue in Providence, serving homeowners and businesses throughout the state. The company specializes in setting up residential and commercial solar systems and offers 24/7 phone availability for customer inquiries. Go Solar Rhode Island works with experienced, licensed installers to deliver quality systems tailored to each customer’s energy needs.

The company is certified under Rhode Island’s Renewable Energy Professional program and installs Qcells panels with Enphase microinverter technology, along with Tesla Powerwall battery storage for backup power. Their team manages the full installation process, including site evaluation, system design, permitting, installation, and utility interconnection.

Go Solar Rhode Island helps homeowners take advantage of the state’s solar incentive programs, including the Renewable Energy Growth Program and net metering. The company offers free consultations and works with financing options to make solar affordable for Providence-area homeowners. Their local knowledge of Rhode Island’s permitting requirements and utility processes helps streamline the installation timeline.

Service Area

Go Solar Rhode Island serves the following areas within a 37-mile radius:

ProvidenceCranstonWarwickPawtucketEast ProvidenceJohnstonNorth ProvidenceCentral Falls

Are you Go Solar Rhode Island?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Energy Audit
Maintenance
Grid Connection

Certifications & Accreditations

Rhode Island REP Certified

Partner Manufacturers

Panels

Qcells

Inverters

Enphase

Batteries

Tesla Powerwall

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.6

30 reviews

Frank T.

15 September 2025
Verified Customer

Go Solar Rhode Island was responsive from the first call. They answered the phone on a weekend and had a proposal ready within days. The installation was quick and professional, and our system is producing well.

Debra S.

22 June 2025
Verified Customer

We appreciated the personal service from Go Solar RI. They took the time to explain the process and helped us understand all the Rhode Island incentive programs. The crew was careful with our property.

Carlos R.

8 March 2025
Verified Customer

Good local company that delivered on their promises. The system was installed on time and is generating the electricity they estimated. Their 24/7 phone availability is a nice touch.

Frequently Asked Questions About Go Solar Rhode Island

What services does Go Solar Rhode Island offer?

Go Solar Rhode Island offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Maintenance, Grid Connection.

Is Go Solar Rhode Island NABCEP certified?

Go Solar Rhode Island holds the following certifications: Rhode Island REP Certified. Contact them directly for the latest accreditation details.

What areas does Go Solar Rhode Island serve?

Go Solar Rhode Island serves Providence, Cranston, Warwick, Pawtucket, East Providence, Johnston, North Providence, Central Falls. They are based in Providence with a service radius of 60 km.

What warranty does Go Solar Rhode Island offer?

Go Solar Rhode Island offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Go Solar Rhode Island's customer reviews?

Go Solar Rhode Island has a 4.6/5 rating based on 30 customer reviews. Customers consistently rate them highly.

How long has Go Solar Rhode Island been in business?

Go Solar Rhode Island was founded in 2018 and has been in business for 8 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Go Solar Rhode Island

Fill in your details and we'll connect you with Go Solar Rhode Island.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote